Text
e;
.p
. ;, s
- /
Y 'Commonw:alth Edis n'
> t ~i :
i
/ 1400 Opus Placs
(
. Cowners Grove, Illinois 60515 e.-
Noven:ber 9,1992 i
4
= Dr. T.E. Murley, Director Office of Nucle r Reactor Regulation U.S. Naclear Regulatory Commission i
Washington, D.C. 20555 Station Units 1 and 2
Subject:
. LaSalle County (IST) Program Inservice Test a
NRC DQ.Che1&s,50-373and 50-37_4 e
Reference:
-(a) W.E. Morgan letter to Dr. kJrley, dated October 2,1989, Transmitting Revision 2 to the LaSalle IST Program
Dear Dr. Murley,
l Reference (a) transmitted Revision 2 to LaSalle County Station's IST Program.
Since that time, reviews of the program and plant modifications have been performed which necessitate revision of the Program. Attached is Revision 3 of the LaSalle Units 1 and 2 IST Program, and a Summary of Changes lieting, Please contact this office with any questions.
i Sincarely, JoAnn Shields Nuclear Licensing Administrator
- Attachment cc
- - A.B. Davis, Regional Administrator - Rlli R. Stransky, Project Manager - NRR D.L Hills, Senior Resident inspector - LSCS Office of Facility Safety - lDNS.
1, l
130043 i
JS/lk :
g i
-j
- ZNLD/2285 -
9211160341-921109
',i)iW PDR ADOCK'0500o373 4
p PDR i
2 1
m Ihrervice Testing Frogram Suttmory of Changes for Revision 3 OSR/ 92-036
References:
- 1) NRC Inspection Report 373(374)/92015 June 15,'1992 through July 9, 1992
- 2) AIR 373-251-92-00098 "IST Program OM-6 Pump Requirements"
- 3) AIR-373-100-92-01503 " Track Re/ision to Relief Request RV-26"
- 4) AIR 373-251-90-00034 " Extrapolation & Trending Requirements for Appendix J Containment Isolation Valves" The LaSalle Incorvice Testing Program is being revised based on a NRC audit performed during June and July of 1992 (Reference 1).
This revision also includes other changes which stem.from other program reviews and non-IST changes.
The following is a short summary of the program changes.
- 1) Relief Request RP-11 has been addod to Section 5.
Relief Request RP-11 now goveras pump different.al pressure and *zowrate acceptance criteria.
j
- 2) Note 16 has been deleted from Section 3.2.
The contents and actions of this Note.have been addressed-by Relief Request RP-11.
All references to Not 16 have been deleted from Section 4.
(Note:
This revision does have a Note 16, however in the previous a
revision this "as Note l'.
Since the previous Note 16 was. deleted Note 17 became Note _16.)
- 3) Relief Requast RV-19 has been revised. per requirements of-Generic Letter 89-04.
Leak-rate results for Containment Isolation Valves will not be trended and extrapolated.
The revised Relief Request has been included in Section 7.
4)F lief Request RV-26 has been revised per requirements of IST Prog 1am SER and NRC Audit (Reference 1).
Individual stroke times for Scram Discharge Volume Vent and Drain Valve-will be recorded and trended..The revised Relief Request has been included in Section'7.'
The stroke time test has been added to the Test
.fic.ld of Section 6 and'to the Valve / Surveillance Cross Reference Matrix.
- 5) Fail safe test for 1(2)B33-F019 was not included as a required test'in the previous revisions, this was a typographical u
omission.-
LaSalle Station has been performing a f ail safe test on these valves however, it was not documented as a requirement in the IST Program.
The fail safe test requirement has been added to the
- Test fields of Section 6 and to the Valve / Surveillance Cross Reference and is included in this revision.
J
q
.6) Leak rate' test has been added to-the Test field'of Section-6 and the Valve / Surveillance Cross Reference Matrix for the following valves:-
.1 (2 ) E2 2 -F014 1(2)E21-F018
.1(2)E21-F031 1 ( 2 ) E12 -F005 1(2) E12-F025A/B/ C 1 ( 2 ) E12-F030 1(2)E12-F055A/B 1(2)E12-F088A/B/C 1(2)E12-F311A/B 1 (2 ) E12-F03 6 A / B 1 ( 2 ) E51-F022 1(2)E51-F059 7)Three Unit 2 HPCS valves are being removed from the-IST.
program.
The valves, 2E22-F001, 2E22-F010, and 2E22-F011, are located on the piping which connects the Condensate Storage Tank to -
the HPCS System.
This' piping has been capped and LaSallelis no longer taking credit for this piping.
Specifications have not 'been revised. The UFSAR and Technical to reflect this change',
- however, AIR 373-160-90-00041 is tracking' this update.
The s
corresponding valves in Unit 1
are scheduled for the same modification during L1R05.
These valves will be deleted from the-IST Program in'a subsequent revision.
\\
l
.J I
)
1
~
l
.