ML20116G385

From kanterella
Jump to navigation Jump to search
Amends 166 & 48 to Licenses DPR-66 & NPF-73,respectively, Revising Primary containment-air-temp-sensor Locations Currently Specified in Surveillance Requirement 4.6.1.5 for Units 1 & 2
ML20116G385
Person / Time
Site: Beaver Valley
Issue date: 11/03/1992
From: Stolz J
Office of Nuclear Reactor Regulation
To:
Duquesne Light Co, Ohio Edison Co, Pennsylvania Power Co
Shared Package
ML20116G389 List:
References
DPR-66-A-166, NPF-73-A-048 NUDOCS 9211110304
Download: ML20116G385 (9)


Text

.

  1. panowr>

/

UNITED STATES y

)#u j,

NUCLEAR REGULATORY COMMISSION 3.

- t W ASHINGTON. D. C. 20%5 l

DUOVESNE tlGHT COMPANY OHIO EDISON COMPANY PENNSYLVANIA POWER COMPANY DOCKET NO. 50-333 BEAVER VALLEY POWER STATION. UNIT NO. I 1

AMENDMENT TO FAClllTY OPERATING llCENSE Amendment No. 166 License No. OPR-66 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duquesne Licht Company, et al. (the licensee) dated October 9, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisiens of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

vn :10304 921103 PD9 APOCK 05000334 p

PDR

. 2.

Accordingly, the license is amended by changes to the Technical i

Specifications as indicated in the attachment to this license amendment, and paragraph 2.C (2) of Facility Operating License No. DPR-66 is hereby amended to read as follows:

(2)

Technical Specification 1 The Technical Specifications contained in Appendix A, as revised through Amendment No. 166, are hereby in;orporated in the license.

The licensee shall operate the facility in 0:cordance with the Technical Specifications.

3.

This license amendment is effective as of the date cf its issuance, to be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

^

/

JohnF.Stolz,DireItor Project Directorate 1-4 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specificetions Date of issuance:

November 3, 1992 I

t l

l

+-

. - - -. - -. -.. ~. - - _ -. _...

ATTACHMENT T0 llCENSE AMENDMENT NO.166 FACIllTY OPERATING LICENSE NO. DPR-66 DOCKET NO 50-334 Replace the following page of Appendix A, Technical Specifications, with the enclosed page as indicated.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

Remove Insert 3/4 6-8 3/4 6-8 t

Y ap

--yr.r r.,r

-,n-n e

r--e,

--v~~

m,.,ne +- n w

r v

*= ~

CONTAINMENT SYSTEMS AIR TEMPERATURE LIMITING CCNDITION FOR OPERATION 3.6.1.5 Primary containment average air temperature shall be maintained:

a.

Greater than or equal to 75'F and less than or equal to 105'F, or b.

Greater than or equal to 95'F and less than or equal to 105'F in accordance with the requirements of Figure 3.6-1.

APPLICABILITY:

MODES 1, 2,

3 and 4.

ACT_LQ1{:

With the containment average air temperature > 105'F or less than the minimum containment temperature prescribed in Figure 3.6-1 (75'F or 95'F) restore the average air temperature to within the limit within 8

hours or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE REQUIREMENTS 4.6.1.5 The primary containment average maximum and minimum air temperatures shall be the arithmetical average of the temperaturcs at the following locations and shall be determined at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The nearest alternate detector may be used for temperature l

determination up to a maximum of one per location.

Location a.

Reactor Containment Annulus - Elev. 701'6" b.

Reactor Containment Annulus - Elev. 730'0" c.

Pressurizer Cubicle - Elev. 744'0" d.

Above Reactor Head Storage Area - Elev. 799'0" e.

Dome Area above Stoam Generator 1B - Elev. 853'0" BEAVER VALLEY - UNIT 1 3/4 6-8 Amendment No.

166

1 l

y[pQ Qf og

,'o,,

UNITED STATES y',#(

g NUCLEAR REGULATORY COMMISSION E

WASHINGTON, D. C, 20555

%, =..../

i DMQUESNE LIGHT COMPANY OHIO EDISQN COMPANY THE CLEVELAND ELECTRIC ILLUMINATING COMPANY THE TOLEDO EDIS0N COMPANY DOCKET NO. 50-412 BEAVER VALLEY POWER STATION. UtHI_2 AMEN 0 MENT TO FAClllTV OPERATING LICENSE Amendment No. 48 License ko. NPF-73 1.

Ine Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Duquesne Light Company, et al.

(the licensee) dated October 9, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission': rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conductea in compliance.vith the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

. 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of facility Operating License No. NPF-73 is hereby amended to read as follows:

(2)

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment Nr. 48, and the Environmental Protection Plan containea in Appendix B, both of which are attached hereto are hereby incorporated in the license.

DLC0 shall operate the f acility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of the date of its issuance, to be implemented within 60 days of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

/$

John F. Stolz, Director Project Directorate I-4 Division of Reactor Projects - I/11 Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

November 3, 1992

m.

______._y l

i ATTACHMENT TO LICENSE AMENDMENT NO. 48 FACILITY OPERATING LICENSE NO. NPF-73 DOCKET NO. 50 4j2 Replace the following page of Appendix A, Technical Specifications, with the enclosed page as indicated.

The revised page is identified by amendment number and contains vertical lines indicating the areas of change.

Remove 1n197_1 3/4 6-8 3/4 6-8 i

F 1

I e

' ' - =- ww w w--yv-ir--or ww w-www-w w

-wm-e we rew e

w--e~ew---r-ve-es---

?v

-r,e--

--m,

---,erm-e-.,,-r-,we-s-s w-e--r--+

_<e--,

v---

-- = =

~.. -... - -. -......

d i

l i

notes:

10 6

~

1. R4T TEMPERATURE BETWEEN l

4Sor AND 50W.

1 10 5

2. WAxiugu ALLCwASLE CONTAINuCNT l

l l

l TEMPERATURE 10SSr.

10.4

~

\\

3. WIN'ugu ALLOW &E CONTAJNVENT j

AIR PARTAAL PRI55URE 9.0 PSA.

10.3 i

4. WArtWUW SERVCE WATER l

TEut#ATURE Sgor J

10.2 C CNT AtNME NT l, l

i i

I l

l T E MP E R ATURE 2 8 5CF l?h\\

gq l

l

,,, ;; 10 0,

$b l

l

\\

E$

99

\\

wh j

k UNLCCEP"ASLE h f 80 l

l

\\

CPEAATICN 3a f

ACCEPTABLE

\\

o4 (s

CP RATIO 9.6

\\

a K

N 95 2

\\

94 9.3 g

C DNT A11 MENT TEMPl;mATupE210t *F "t

9.2 N

I 9,1 i

9.0 i I 30 36 40 46 63 66 60 66 70 76 80 86 8 !90 i se SERVICE WATER TEMPERATURE (*F) gy FIGURE 3.61 MAXIMUM ALLOWABLE PRIMARY CONTAINMENT AIR PRESSURE YER$US SERVICE WATER TEMPERATURE BLAVER VALLEY - !? nit 2 3/4 6-7 Amendment NO. 20

CONTAINMENT SYSTEMS AIR TEMPERATURE LIMITING CONDITION FOR OPERATION 3.6.1.5 Primary containment average air temperature shall be maintained:

a.

Greater than or equal to 85'F and less than or equal to 105'F, or b.

Greater than or equal to 100'F and less than or equal to 105'F in accordance with the requirements of Figure 3.6-1.

APPLICABILITY:

MODES 1, 2,

3 and 4.

ACTION:

With the containment average air temperature > 105'F or less than the minimum containment temperature prescribed in Figure 3.6-1 (85'F or 100*F) restore the average air temperature to within the limit within 8

hours or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILL ANCE REQUIREMENTS 4.6.1.5 The primary containment average maximum and minimum air temperatures shall be the arithmetical average of the temperatures at the following locations and shall be determined at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

The nearest alternate detector may be used for temperature determination up to a maximum of one per location.

Location a.

Reactor Containment Annulus - Elev. 701'6" b.

Steam Generator 21B Cubitle - Elev. 730'0" c.

Pressurizer Cubicle - Elev. 743'0" d.

Reactor Containment Annulus - Elev. 777'4" e.

Dome area above Steam Generator 21B - Elev. 865'0" BEAVER VALLEY - UNIT 2 3/4 6-8 Amendment No. 48

.-