TNRC-84023 TEXAS UTILITIES GENERATING COMPANY P. O. BOX 2300
- GLEN ROSE, TEXAS 76043 J. C. KUYKENDALL July 25, 1984 MANAGER NUCLEAR OPERATIONS
%[H@[HDVDs %
NE-TB08 Mr. Eric Johnson
.u Region IV U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 fp-hh7
(
-Arlington, Texas 76011
Subject:
Scheduled Completion Dates for NRC Emergency Plan Appraisal Appendix A Items
Dear Mr. Johnson:
Attached is an updated status list (July 25, 1984) of Appendix A Open Items.
Ten items have been completed since May 25, 1984.
We would like to extend the dates of some remaining items.
If you have any questions or require additional information, please contact Mr.
Jay Laughlin at (817) 897-4856, extension 3756.
Sincerely,
?
/
pp1 JCK Im1 Attachment r
/
/
/
gM}eg Who F
Rtviced 7/25/84 SCHEDULED COMPLETION DATES FOR NRC EP APPRAISAL APPENDIX A ITEMS Scheduled Item Numbers Item Completion Date 445/8333-01 Docket the CEMP and corporate emergency plant pro-Complete 446/8317-01 cedures (CEPPs), or delete the CEMP and incorporate its provisions into the CPSES emergency plan.
445/8333-09 Revise the emergency plan to include augmentation of 9/21/84 446/8317-09 emergency personnel as specified in NUREG-0654, Revision 1, Table B-1, and provide a method to verify that there is a reasonable assurance that the augmentation times can be met for the speci-fied minimum augmentation staff.
445/8333-18 Pursuant to the requirements of NUREG-0737, Sup-See Note 2 446/8317-18 plement 1, and the guidance contained in Regula-tory Guide 1.97, Table 2, the applicant shall complete the installation of instrumentation in the control room to assess plant and environmental conditions during and following an accident.
445/8333-19 Complete training and qualification of control Complete 446/8317-19 room personnel on all equipment used in the de-tection, classification, notification, and pro-tective action assessment and recommendation preparation.
445/8333-28 Sufficient alternate or backup power systems shall Complete 446/8317-28 be provided to maintain continuity of TSC functions and to immediately resume data acquisition storage, and display if loss of primary TSC power occurs.
445/8333-29 TSC radiation monitoring systems and the SPDS that 9/21/84 446/8317-29 are used for emergency detection, classification, and assessment must be fully installed, tested, and made operational.
445/8333-30 TSC data collection and evaluation systems (RM-21) 9/21/84 446/8317-30 that are used in accident assessment and genera-tion of protective action recommendation must be fully installed, tested and made operational.
445/8333-31 Emergency notification systems must be fully in-Complete 446/8317-31 stalled, tested and made operational.
NOTE:
(1) Vertical bar on righthand margin indicates change e.g. item completed or scheduled completion date rev!. sed.
(2) Pending NRC response to request for acceptance of existing instrumentation.
RLvistd 7/25/84 SCHEDULED COMPLETION DATES FOR NRC EP APPRAISAL APPENDIX A ITEMS l
l Scheduled Item Numbers Item Completion Date 445/8333-32 Complete training and qualification of TSC person-9/21/84 446/8317-32 nel on all equipment used in the classification, notification, and protective action assessment and recommendation preparation.
445/8333-38 The SPDS and the RM-21 that are used in the acci-9/21/84 446/8317-38 dent assessment and generation of protective action recommmendations must be fully installed, tested, and made operational in the EOF.
445/8333-39 Emergency notification systems (ENS and automatic Complete 446/8317-39 ringdown) must be fully installed, tested and made operational.
445-8333-40 Complete training and qualification of EOF person-9/21/84 446/8317-40 nel on all equipment used in the classification, notification and protective action assessment and recommendation preparation.
445/8333-43 Complete and test the gas sampling rig for high-Complete 446/8317-43 level grab samples from the vent stack and dem-onstrate by drill or exercise that sampling and analysis can be completed in three (3) hours or less.
445/8333-50 Provide an operational decontamination facility Complete 446/8317-50 with communications at the health physics control point and provide towels, communications and de-contamination agents and NOSF decontamination fac-ility.
445/8333-60 Following the transfer of ARMS and PRMS from the 9/21/84 446/8317-60 vendor to the applicant, the applicant shall con-firm proper instrument maintenance, adequacy of operation, calibration checks, and prompt repair or replacement of inoperable instrumentation.
445/8333-65 Complete implementation of inspection, maintenance Complete 446/8317-65 and calibration procedures and provide appropriate documentation of the new onsite meteorological measurements program, including identification of sensor types and specifications, data reduction procedures, and determination of system accuracies (compared to Reg. Guide 1.23) for staf f review; also, provide inspection maintenance and calibra-tion procedures for staff review as these are de-veloped and approved.
,c Rtvised-7/25/84 SCHEDULED COMPLETION DATES FOR NRC EP APPRAISAL APPENDIX A ITEMS Scheduled
' Item' Numbers Item Completion Date 445/8333-66.
Improve the display of vertical temperature grad-Complete 446/8317-66 ient-in.the control room by installing charts with appropriate resolution.
l445/8333-67 Modify EPP-302 to reflect the information available Complete 446/8317-67 from the onsite meteorological measurements program and specify the averaging time (15 minutes);
clearly establish the sources for the hierarchy-of substitution of meteorological data; eliminate cumbersome and/or poorly documented procedures; and include specific provisions for updates.
445/8333-68 Provide a complete description of the arrangements.
Complete 446/8317-68 made with the NWS to provide regional meteorological data including identification of the information to Lbe provided and the' mechanism for obtaining updates of this information.
445/8333 Provide equipment and/or procedures for passive Complete
- 446/8317-69 notification of control room shif t personnel of severe weather conditions affecting or likely to
-affect the site..
I 1445/8333-84 Issue and approved EPP to control the use of dedi-Complete 446/8317-84 cated emergency vehicles with offroad capability which also provides protection for_all transported-emergency equipment and instruments during adverse weather.
445/8333-89.
Pursuant to the requirements of 10CFR50, Appendix Complete 446/8317-89 E (IV).(c), the applicant shall revise the emerg-ency plan and'the EPP's to correctly differentiate between emergency classes and EAL's.
445/8333-90 Pursuant to the requirements of 10CFR50, Appendix Conplete 446/8317-90 E (IV).(c), the applicant shall complete as neces-sary readings from plant sensors _ that form the data sets of EAL's.
'445/8333-114 An evacuation notification system must be provided Complete 446/8317-114 which can be detected by all persons in owner-con-trolled areas' including outdoor areas and the Ad-ministration Annex Building.
7 3
Rivierd 7/25/84
~'
SCHEDULED COMPLETION DATES FOR NRC EP APPRAISAL APPENDIX A ITEMS Scheduled Item Numbers Item Completion Date 445/8333-115 Site evacuation routes must be developed and the Complete 446/8317-115 applicant shall provide a means to ensure that all personnel are aware of the routes in an emergency.
445/8333-116 Complete, implement and test a personnel accounta-9/21/84 446/8317-116 bility system.
445/8333-130 Complete the dissemination of emergency information Complete 446/8317-130 to the transient population.
445/8333-132 Conduct additional training for control rooom per-Complete 446/8317-132 sonnel to ensure adequate knowledge of plant oper-ating and emergency procedures and to stress the requirement for compliance with procedures.
445/8333-133 Conduct additional practical training for control Complete 446/8317-133 room personnel in emergency classification, empha-sizing EAL sets which have multiple conditions, to ensure that the watch organization is able to dem-onstrate prompt and correct emergency classifica-tion skills.
445/8333-137 Drills which require the use of EPP-302 should be Complete 446/8317-137 conducted to improve the efficiency by which the dose projection calculations are performed.
445/8333-138 Train appropriate emergency response personnel on 9/21/84 446/8317-138 dose projection calculation methods using the RM-11 and RM-21 systems.
445/8333-139 Conduct practical drills with shift supervisors in Complete 446/8317-139 implementing the requirements of EPP-304 based on dose assessments and in communicating the results of such determinations to appropriate authorities.