Requests Extension Until Next Shutdown or Oct 1985 Outage to Conform to 830617 Confirmatory Order Re Operability of post-accident Sampling Sys Per NUREG-0737,Item II.B.3.Plant- Specific Tech Specs to Be Provided by 850630
ML20116E779
Person / Time
Site: Oyster Creek
Issue date: 04/22/1985
From: Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To: Zwolinski J
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.3, TASK-TM GL-83-36, NUDOCS 8504300411
Download: ML20116E779 (2)


Text

i GPU Nuclear Corporation Nuclear  :::: :;388 Forked River, New Jersey 08731-0388 609 971-4000 Writer's Direct Dial Number:

l April 22, 1985

)

Mr. John A. Zwolinski, Chief Operating Reactors Branch No. 5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Mr. Zwolinski:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 NUREG 0737, Item II.B.3 Post Accident Sampling System The purpose of this letter is to request an extension to the June 17, 1983 Confirmatory Order regarding the operability of our Post Accident Sampling System (PASS).

In preparation for drawing reactor coolant samples from the recirculation system and the liquid poison system, it was determined that valve V-24-29 leaks past its seat. The valve required isolation in accordance with Technical Specifications to ensure preservation of containment integrity.

Also, the sample path from the Shutdown Cooling System requires lower pressures and temperatures than operating plant conditions will allow. In the area of gas sample analysis a concern has arisen regarding moisture on filter cartridges that is being investigated. However, except for the foregoing, it is our firm belief that the system will be fully operational by April 29, 1985. This includes fulfilling our comm'.uents as supplied in our March 6, 1984 response to your eleven (11) criteria.

Because of the above circumstances, GPUN requests an extension until the next shutdown, or at the latest, the outage currently scheduled for October 1985.

At that time, V-24-29 will be repaired. Additionally, this extension will be used to increase the proficiency of plant chemistry technicians in drawing and analyzing samples and in resolving the gas sample issue.

In any event, should we have to call upon PASS in the interim under emergency conditions, we should be able to obtain required samples and perform required analyses.

8504300411 PDR P

850422 ADOCK 05000219 pD h

PDR g

GPU Nuclear Corporation is a subsidiary of the General Public Utikties Corporation

Finally, we propose to provide you, as required hy Generic Letter 83-36, our plant specific technical specifications on the PASS by June 30, 1985.

If you should have any questions, please contact Mr. Drew Holland at (609) 971-4643.

Very truly yours, m)

Pe ier Vice President and Director Oyster Creek PBF/DGH: dam

  1. 0942A cc:

Dr. Thomas E. Murley, Administrator Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, PA 19406 NRC Resident Inspector Oyster Creek Nuclear Generating Station Forked River, NJ 08731 l