ML20116D325

From kanterella
Jump to navigation Jump to search
Forwards Revs 11 & 12 to QA Manual & Matrices of Changes.W/O Rev 12
ML20116D325
Person / Time
Site: Clinton Constellation icon.png
Issue date: 03/22/1985
From: Hall D
ILLINOIS POWER CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20116D328 List:
References
U-0815, U-815, NUDOCS 8504290380
Download: ML20116D325 (1)


Text

_

INb U-0815 L34-85 (03-22 )-L 1A.120 ILLIN0/8 POWER COMPANY IP CLINTON POWER STATION, P,0. BOX 678. CLINTON. ILLINOIS 61727 March 22, 1985 Docket No. 50-461 IU ENTIZ

$$Y Mr. James G. Keppler y, q$[

W7p Regional Administrator, 6togH & ~

Region III 't-U.S. Nuclear Regulatory Commission [ET DT #7 799 Roosevelt Road Glen Ellyn, IL 60137 dw/O gn~6 '

f

Subject:

Clinton Power Station Unit #1 Construction QA Manual - Revisions 11 and 12

Dear Mr. Keppler:

Enclosed are Revisions 11 and 12 of the Illinois Power Nuclear Construction Quality Assurance Manual, dated March 5, 1985, and March 12, 1985, respectively. The submittals are provided in accordance with the requirements of 10CFR 50.55(f)(3). Additionally, matrices of changes for both revisions are enclosed. .

The changes to the subject QA Manual have been evaluated by Illinois Power Company as not reducing the quality program commitments, cerel yours,

. . Hall Vice President l

RTR/ lab Enclosures cc: B. L. Siegel, Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety NRC Office of Inspection and Enforcement U. S. NRC Document Control Desk, Washington, D.C.

8504290380 850322 PDR ADOCK 05000461 A PDR MAR 271985

/D/h, m