ML20116D325
| ML20116D325 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 03/22/1985 |
| From: | Hall D ILLINOIS POWER CO. |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20116D328 | List: |
| References | |
| U-0815, U-815, NUDOCS 8504290380 | |
| Download: ML20116D325 (1) | |
Text
_
INb U-0815 L34-85 (03-22 )-L 1A.120 ILLIN0/8 POWER COMPANY IP CLINTON POWER STATION, P,0. BOX 678. CLINTON. ILLINOIS 61727 March 22, 1985 Docket No. 50-461 IU ENTIZ
$$Y q$[
Mr. James G. Keppler y,
W7p Regional Administrator, 6togH
~
[ET
't-Region III DT U.S. Nuclear Regulatory Commission
- 7 799 Roosevelt Road dw/O Glen Ellyn, IL 60137 gn~6 'f
Subject:
Clinton Power Station Unit #1 Construction QA Manual - Revisions 11 and 12
Dear Mr. Keppler:
Enclosed are Revisions 11 and 12 of the Illinois Power Nuclear Construction Quality Assurance Manual, dated March 5, 1985, and March 12, 1985, respectively. The submittals are provided in accordance with the requirements of 10CFR 50.55(f)(3). Additionally, matrices of changes for both revisions are enclosed.
The changes to the subject QA Manual have been evaluated by Illinois Power Company as not reducing the quality program commitments, cerel yours,
. Hall Vice President l
RTR/ lab Enclosures cc:
B. L. Siegel, Clinton Licensing Project Manager NRC Resident Office Illinois Department of Nuclear Safety NRC Office of Inspection and Enforcement U. S. NRC Document Control Desk, Washington, D.C.
8504290380 850322 PDR ADOCK 05000461 A
/D/h, m