ML20116A112

From kanterella
Jump to navigation Jump to search
Confirms Schedule for Response to Generic Ltr 82-33 (NUREG-0737 Suppl 1), Requirements for Emergency Response Capability. Items Described in Sections II.A-II.E Can Be Completed by Startup After First Refueling
ML20116A112
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/15/1985
From: Jens W
DETROIT EDISON CO.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-33, NE-85-0191, NE-85-191, NUDOCS 8504240343
Download: ML20116A112 (2)


Text

m

.# w g

Ul"ML$"*

NucJear Operadons Detroit r. . l@bj Edison Enma W ps.

April 15, 1985 NE-85-0191 Director of Nuclear Reactor Regulation Attention: Mr. B. J. Youngblood, Chief Licensing Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Youngblood:

Reference:

(1) Fermi 2 NRC License No. NPF-33 (2) Response to Supplement 1 of NUREG-0737,

" Requirements for Emergency Response Capability (Generic Letter 82-33)", dated December 17, 1982

Subject:

Confirmation of Schedule in Edison Response to Supolement 1 of NUREG-0737, (Generic Letter 82-33)

In the Reference (2) letter, Detroit Edison committed to reconfirm to the NRC the schedule proposed in April 1983.

Detroit Edison confirms that the items described in Section II.A through II.E can be completed by the startup after the first refueling. Edison will review the proposed date with respect to its current operating schedule and reconfirm in the December 31, 1985 letter.

Since the date of the Reference (2) letter, Detroit Edison submitted the Safety Parameter Display System Safety Analysis, April 1984 (EF2-67,808) and the Control Room Design Review Program Plan, August 1984 (EF2-72,747). It is our intention to submit the Regulatory Guide 1.97 Report in June 1985.

Activities for completing the control Room Design Review SummaLy Report have begun. Identification of review team members, allocation of simulator time, human factors support, and definition of the detailed schedule are in progress. The scheduled date of September 1985 for submittal of the report will be confirmed by June 1, 1985.

g42 343 f 85 g F PDR l qb

11r. B. J. Youngblood April 15, 1985 NE-85-0191 Page 2 Should you have any questions, please contact fir. O. Keener Earle at (313) 586-4211 Sincerely, N

cc: 11r. P. M. Byron Mr . II. D. Lynch US!!RC Docuraent Control Desk Washington, D.C. 20555