ML20115J139
| ML20115J139 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 03/31/1985 |
| From: | Smith P, Vandenberg D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| References | |
| NUDOCS 8504230382 | |
| Download: ML20115J139 (4) | |
Text
_ _ _ _ _ _ _ _ _ - _
4
^9 OPERATING DATA REPORT DOCKET NO 50-255 DATE 04-08-85 COMPLETED BY PASmith TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.
Unit Name: Palisades 2.
-Reporting Period:
850301-850331 3.
Licensed Thermal Power (MWL):
2530 4.
Nameplate Rating (Gross MWe):
811.7 5.
Design Electrical Rating (Net MWe):
805 6.
Maximum Dependable Capacity (Gross MWe): *675 7.
Maximum Dependable Capacity (Net MWe):
- 635 8.
If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:
9.
Power Level to Which Restricted, if any (Net MWe):
10.
Reasons for Restrictions, if any:
This Month Yr-to-Date Cumulative
- 11. -Hours In. Reporting Period 744 2,160 116,439 12.
Number of Hours Reactor Was Critical 744 2,160 62,969.7
.13.
Reactor Reserve Shutdown Hours 14.
Hours Generator On-Line 744_
2,144.1 59,758.4 15.
Unit Reserve Shutdown Hours 16.
Grose Thermal Energy Generated (MWH) 1,843,632 5,208,576 123,291,528 17.
Gross Electrical Energy Generated (MWH) 594,610 1,677,750 38,295,540 18.
Net Electrical Energy Generated (MWH) 565,029 1,592,885 36,032,448
-19.
Unit Service Factor 100.0 99.3 51.3 20.
Unit Avai'. 511ity Factor 100.0 99.3 51.3 21.
Unit Caratity Factor (Using MDC Net) 119.6-116.1 48.7 22.
Unit Cape.ity Factor (Using DER Net) 94.3 91.6 38.4 23.
Unit Forced Outage Rate 0
0.7 32.7 24.
Shutdowns Scheduled Over Next Six Months (Type, Date and Duration of Each):
- 25.
If Shut Down at End of Report Period, Estimated Date of Start Up:
26.
Units in Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on condenser backpressure OC0185-0001B-0P03 tk 8504230382 850331 PDR ADOCK 05000255 h.
R PDR
i-T.
AVERAGE DAILY-UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 04-08-85 COMPLETED BY PASmith-TELEPHONE (616)764-8913 MONTH March 1985 DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 755 17 759
'2 762 18 767 3
764 19 756 4
760' 20 768 5
762 21 759 6
761 22 769 7
761 23 760 8
762 24 763 9
764 25 760
, 110 760 26 753 11 756 27 753 12-755 28 760 13 761 29 763 14 760 30 768 15 757 31 765 16 722 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
-0C0185-0001C-0P03 L.
SUMMARY
OF OPERATING EXPERIENCE.FOR MARCH 1985 The Plant reduced power on one occasion to perform turbine valve testing.
Otherwise, the Plant operated at approximately 98' percent of rated power.
i OC018'5-0001E-OP03 t-
4
@ Consumers Power Company Pahsades Nuclear Plant: 2778o Blue Star Memorial Highway, Covert, MI 49043 April 8, 1985 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of March 1985.
[
b Dewey VanDenBerg Reactor Engineer CC: KMHass, Palisades GHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 fiWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMicrzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RWraylor, CE, Palisades AAAlatalo, Palisades BLHarshe, P26-208 Document Control, 950*22*35*10/L GHG85*014 114
' I L