ML20115H151

From kanterella
Jump to navigation Jump to search
Application for Amend to License NPF-69,requesting TS Section 6.2.2.i Set Forth in App a
ML20115H151
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/12/1996
From: Sylvia B
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML20115H148 List:
References
NUDOCS 9607220240
Download: ML20115H151 (1)


Text

i 1

i y

UNITED STATES NUCLEAR REGULATORY COMMISSION in the Matter of

)

)

Niagara Mohawk Power Corporation

)

Docket No. 50-410

)

Nine Mile Point Unit 2

)

i APPLICATION FOR AMENDMENT TO OPERATING LICENSE Pursuant to Section 50.90 of the Regulations of the Nuclear Regulatory Commissicn, Niagara Mohawk Power Corporation, holder of Facility Operating License No. NPF-69, hereby requests that Section 6.2.2.i. of the Technical Specifications set forth in Appendix A to that license be amended. The proposed change has been reviewed in accordance with 7

Section 6.5, " Review and Audit," of the Technical Specifications.

The proposed Technical Specification change contained herein represents revision to Nine Mile Point Unit 2 (NMP2) Technical Specifications Section 6.2.2.i.

}

l NMP2 Technical Specifications Section 6.2.2.i. establiues the normal work hours for NMP2 operating personnel as, "...a normal 8-hour day,40-hour week..." The proposed change i

revises this section to provide for, "...an 8 to 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> day, nominal 40-hour week..."

l P

The proposed changes will not authorize any change in the types of effluents or in the l

authorized power level of the facility in conjunction with this Application for License Amendment. Supporting information and analyses which demonstrate that the proposed j

changes involve no significant hazards considerations pursuant to 10CFR50.92, are included as Attachment C.

Wherefore, Applicant respectfully requests that Appendix A to Facility Operating License No. NPF-69 be amended in the form attached hereto as Attachment A.

NIAGARA MOHAWK POWER CORPORATION t

By

<L$

/

I B. Ralph sylvia /

i Chief Nuclear Officer i

Subscribed and Sworn to before me on this /A day of July 1996.

,Af0TARY PUlfLIC

/

'M{y

't

  • sw 74 evpires.y29/9e 9607220240 960712 PDR ADOCK 05000410 P

PDR

. _. -