Forwards ASME Form NIS-1, Owners Data Rept for Inservice Insps, as Followup to Submitting Refueling Interval 9R once-through SG Tube Insp Rept
ML20115G703
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/22/1992
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20115G706 List:
References
C311-92-2139, NUDOCS 9210260308
Download: ML20115G703 (1)


Text

.

l

, 4 GPU Nuclear Corporation Q gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 170$7 0191 717 944 7621 TELEX 84 2386 Wnter's Direct Dial Nurnber; (717) 948-8005 October 22, 1992 C311-92-2139 U. S. Nuclear- Regulatory Commission Attention: Document Control Desk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 Docket No. 50-289 ASME Form NIS-1, "0wr  ;' Data Report for Inservice Inspections"

- The 1986 ASME Code Section X1, Article IWA-6000, " Records and Reports",

requires-filing the subject NIS-1 form with the enforcement and regulatory authorities having jurisdiction at the plant site.

The enclosed NIS-1 form is submitted in compliance with the above requirement.

This submittal supplements our October 4,1992 letter C311-92-2130 which submitted the Refueling Interval 9R On:e Through Steam Generator- Tube Inspection Report.

Sincerely, N b T. G. Bro ton Vice President and Director, THI EJP/lga cc: Administrator, Region I THI Senior Resident Inspector TMI-1 Senior Project Manager Pennsylvania Department of 1. abor & Industry Hartford Steam Boiler'I&I.Co.

'.oki onnnen >

i1 9210260309 921022 PDR ADOCK 05000289 O PDR GPU Nuclear Corporation is a subsicary of General Pubuc Utet es Corporation .