ML20114F351

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Rept on 1991 Eddy Current Exams of TMI-1 Once-Through SG Tubing. Eddy Current Insp Performed During Refueling Interval 9R & Insps Completed During Oct 1991
ML20114F351
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 10/04/1992
From: Broughton T
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20114F353 List:
References
C311-92-2130, NUDOCS 9210130057
Download: ML20114F351 (1)


Text

- _ _ _ _ _ - _ _ _ - _ _ _ _

e r GPU Nuclear Corporation d.. u Nuciear o

cn:r>-

Forked ; er. New Jett,ey 00731-0388 609 97' 4000 Writer s Direct Dial Number; (717) 948-8005 October 4, 1992 C311-92 2130 U. S. liuclear Regulatory Cammission Attention: Document Control Detk Washington, DC 20555

Dear Sir:

Subject:

Three Mile Island Nuclear Station, Unit 1 Docket tio. 50-289 Refueling Interval 9R Once Through Steam Generator (OTSG) 'iube Inspection Report Technical Specification 4.19.5.b requires reporting to the flRC the complete results of OTSG tube inservice inspections within 12 months following the completion of the inspections.

GPU Nuclear performed eddy current inspection of the OTSG Tubing during refueling interval 9R and completed such inspections during October,1991.

Attachment 1, " Report on the 1991 Eddy Current Examinations of the 1Ml-1 OTSG Tubing", fulfills the requirements of the above cited Technical Specification for the inspections identified above.

Sincerely, hbkM T.G.3rq0ghton Vice President and Director, TMI-l TGB/EP:lga cc: Administrator, Region 1 1MI-l Senior Project Manager TMI Senior Resident Inspector 08004J 9210130057 921004 l PDR ADOCK0500g9 j; GPU Nuclear Corporabon is a svLscary of General Put't Utatses Corporation [ (/ (

e

_ - - _ - _ _ . _ - - _ - _ _ _ . _ _ _ _ - _ . - - _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ - - -