ML20115G246
| ML20115G246 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 04/12/1985 |
| From: | BOSTON EDISON CO. |
| To: | |
| Shared Package | |
| ML20115G233 | List: |
| References | |
| NUDOCS 8504220151 | |
| Download: ML20115G246 (1) | |
Text
..
-5,5 FUEL STORAGE A.~
The new fuel storage facility shall be such that the K.,,
dry is
~1ess than 0.90 and flooded is less than 0.95.
B.
The Kor, of the spent fuel storage pool shall be less than or equal to 0.95.
C.
Fuel assembly in the spent fuel pool shall have a maximum K infinity less than or equal to 1.35.
D.
The number of spent fuel assemblies stored in the spent fuel pool shall not exceed 2320.
E.
Loads in excess of 1000 lbs. shall be prohibited from travel over fuel assemblies in the spent fuel storage pool.
F.
No fuel which has decayed for less than 200 days shall be stored in racks within an arc described by the height of the cask around the periphery of the energy aborbing pad.
5.6' SEISMIC DESIGN The station Class I structures and systems have been designed for ground accelerations of 0.089 (design earthquake) and 0.15g (maximum credible earthquake).
~
8504220151 850412 PDR ADOCK 05000293 P
PDR Amendment No.
207