Proposed TS 4.7.1.2.a.1 Re Verification of Discharge Pressure on Each motor-driven Pump
ML20115G193
Person / Time
Site: Waterford Entergy icon.png
Issue date: 10/21/1992
From:
ENTERGY OPERATIONS, INC.
To:
Shared Package
ML20115G184 List:
References
NUDOCS 9210260052
Download: ML20115G193 (4)


Text

t. , , - ,1 p_ -

eg s e 4

4 4,.

I

! 1 NPF-38-129 ,

ATTACHMENT A

q r

92'10260052.921021 PDR ADOCK 05000382-

.P PDR

--r -

.e- . .7,,-,

PLANT SYSTEMS EMERGENCY FEE 0 WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three inuependent steam generator emergency feedwater pumps and associated flow paths shall be OPERABLE with:

a Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and

b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With one emergency faedwater pump inoperable, restore the required emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUT 00WN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. With two emergency feedwater pumps inoperable be in at least HOT STAN0BY within 6 haurs and in HOT SHUTOOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With three emergency feedwater pumps inoperable, immediately initiate corrective action to restore at least one emergency feedwater pump to OPERABLE status as soon as possible.

SURVEILLANCE REQUIREMENTS 4.7.1.2 The emergency feedwater system shall be demonstrated OPERABLE:

a. At least once per 31 days by:
1. Verifying on a STAGGERED TEST BASIS that each motor-driven pump develops.a discharge pressure of greater than or equal to 1298 osig on recircuiation flow, and that the turbine-driven pump develops a discharge pressure of greater than or equal to 1342 psig on recirculation flow when the secondary steam supply pressure is greater than 880 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 fnr the turbine-driven pump.
2. Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

WATERFORD - UNIT 3 3/4 7-4

e g E #

.5 &"

h NPF-38-129 ATTACHMENT B h

D h

l r

l

- + . - -. . . -. _:._. --_____-_-_--__--_-_____2:-____--

PLANT SYSTEMS EMERGENCY FEE 0 WATER SYSTEM LIMITING CONDITION FOR OPERATION 3.7.1.2 At least three indepe . dent steam generator emergency feedwater pumps and associated flow paths shall be OPERABLE with:

a. Two feedwater pumps, each capable of being powered from separate OPERABLE emergency busses, and ,
b. One feedwater pump capable of being powered from an OPERABLE steam supply system.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

a. With one emergency feedwater pump inoperable, restore the required emergency feedwater pumps to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and i7 HOT SHUTDOWN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />,
b. With two emergency feedwater pumps inope'able be in at least HOT STANDBY within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in HOT SHUT 0udN within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
c. With three emergency feedwater pumps inoperable, immediately initiate corrective action to restore at least one emergency feedwater pump to OPERABLE status as soon as possible.

SURVEILLANCE REQUIREMENTS

4. 7.1. 2 The emergency feeowater system shall be demonstrated OPERABLE:

N -

Al CNEXA OR I a. At least once per 31 days by: ygsgg7 73o l 1. Verifying on a STAGGERED TEST BASIS that each mc tor-driven pump develops a discharge pressure of greater than og equal to 1298 psig on recircuiation flow, and that the torbine-driven pump develops a discharge pressu re of greater an or equal to

1342 psig on recirculation flow when the second ry s+a== ^

upply- pressure is greater than '300 psig. The provisions of Specification 4.0.4 are not applicable for entry into MODE 3 for the turbine-driven pump.

2. Verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position, is in its correct position.

WA'ERFORD - UNIT 3 3/4 7-4