NI AGARA M0llAWK l'OWER CORI' ORATION NINE MILE l'0!NT NUCLEAR STATION UNIT # 1 NARRATIVE OF OPERATING EXPERIENCE
-The station operated during the month of December 1984 with a Unit Availability Factor of 91. l *.
and a Net Design Electrical Capacity Factor of 87.7%
There were 0
challenges to Electromatic Relief Valves. Reductions in Capacity Factor were due to #12 Backup ~Se am Solenoid Valve failure and Control Rod Pattern Exchange CLASS I WORK - MECIIANICAL MAINTENANCE - DECEMBER 1984 hR# 26050 Rebuild CRD 42-35, S/N#6810 WR# 26047 Rebuild CRD 14-35, S/N#6874 hR# 26044 Rebuild CRD 14-39, S/N#71617 WR# 26049 Rebuild CRD 22-47, S/N#71417 WR# 24589 Rebuild CRD 22-35, S/N#71463 WR# 26042 Scrapped CRD 10-31, S/N#71529 hR# 26040 Scrapped CRD 26-27, S/N#71430 WR# 24587 Rebuild CRD 10-35, S/N#71659 hR# 21225 Rebuild CRD S/N#71551 WR# 29991 Repair CRD IICU 10-35, Leaky foot valve hR# 30258 Repair Scram Outlet Valve llCV 18-07 WR# 30254 Repair Scram Outlet Valve IICV 26-51 hR# 30260 Repair Scram Outlet Valve liCV 26-31 WR# 30256 Repair Scram Outlet Valve ilCV 26-03 WR# 30255 Repair Scram Outlet Valve liCV 30-11 hR# 30259 Repair Scram Outlet Valve llCV 26-11 hR# 28579 Repair Oil Leak on Coupling to 12,Feedwater Pump WR# 26272 ~
Repaired Hydraulic Snubber 51-HS-12 hR# 26273 Installed pipe hanger on 44-11-101 CLASS 'I WORK - ELECTRICAL MAINTENANCE - DECEMBER 1984 MO 1927 This major order involves updating station equipment for Equipment Qualification. The worked performed includes wiring position limit switches, wiring solenoid valves and a transmitter and taping motor Icads. -In addition, condulets were scaled with Bisco Seal for temperature elements in the Emergency Condensor Makeup
_ System. The systems involved are Post Accident Sampling, Reactor Building Cooling Water, Reactor Containment Air Purge and: Fill and Reactor Containment N2 Purge and Fill.
.q B501310485 841231 l PDR ADOCK 05000220 l
.R -
~
C1. ASS I liORK - INSTRUAll NTATION Ji_CONTR0l. - DI:ClialBER 1931 IVR# 30026 CRD-43 Backup Scram Solenoid NC16B is leaking air off the air header.
(installed new SOV at CRD-44) CRD 43 was found working properly.
9
- =..
+
l s
1 OPERATING DATA REPORT DOCKETNO 50-220 g
Roman?~[f' DAIE 1/7/85 CO\\lPLETED IlY T h'
_ TELEPHONE _ (315) 349-2422 OPERATING STATUS
- 1. Unit Name: Nine Mile Point Unit #1.
Notes
- 2. Reporting Period: December 1984 12/1/84 - 12/31/84 1850
- 3. Licensed Thermal Power (MWt):
640
- 4. Nameplate Rating (Gross MWe):
650
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
620
- 7. Maximum Dependable Capacity (Net MWe):
610
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr.-to-Date Cumulative iI. Hours in Reporting Period 744 8785 134.065.2
- 12. Number Of Hours Reactor Was Critical 692 6414.2 92715.7
- 13. Reactor Reserve Shutdown Hours 0
0 1204.2
- 14. Hours Generator On-Line 678 6317.0 89R05 3
- 15. Unit Reserve Shutdown Hours 0
0 20.4
- 16. Gross Thermal Energy Generated (MWH) 1224598.0 11195010.0 149289450.0
- 17. Gross Electrical Energy Generated (MWH) 416991.0 3749007.0 doxan7RR n
- 18. Net Electrical Energy Generated (MWH).
404597.0 3635235.0 47829994.0
- 19. Unit Service Factor 91.1 71.9 67.0
- 20. Unit Availability Factor 91.1 71.9 67 0-g
- 21. Unit Capacity Factor (Using MDC Net) 89.I 67.8 58.5
- 22. Unit Capacity Factor (Using DER Net) 87.7 66.7 57.5
- 23. Unit Forced Outage Rate 8.9 1.8 16.4
- 24. Shutdowns Scheduled Over Next 6 Months IType. Date,and Duration of Each1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior o Commercial Operationi:
Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY.
COMMERCIAL OPERATION 01/771 l
4
' h_ _
'4 7
AVER (CE D(ILY L* NIT POh El,( LEVEL DOCKET NO. 50-220 UNIT 9 Flite Pt. #1 1/7/85 1'
DATE
._. _ _. A _m.
a COMPLETED BY T.W;-Roman'-
TELEril0NE (315)349-2422 j
MONTH - December 1984 DAY AVERACE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL tMWe Net)
DlWe Neil 612
- g7 0
2 611 g3 0
3 613 19 219 I
4 20 498 5
613 21 591-6 612 604 7
.601 23 578--
j 8
562
~612 i
34 i
9 613 25 612-10 611' l
26 610 II 613 3-610 l
12 611 2s 612 I3 612 29.
613- -
0I3 14 30 614 15
- 61'3
~
g 16 -
351
. s s
~ ~ INSTRUCTIONS ~ ~~7
~ ~
]
~
y On this format. hs: the aserare daily unit p. wer gesci ni.stwe.Nei siir euh da.s in the rep..inne in..nih.
~
e nearest whole megaware.
t
.O F
h-e.,-
h
.g j ~
50-220 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME 9 Mi1e PT-
"1 DATE-1/7/05 REPORTMONT11 December 1984 COMPLETED BY TW Roman (A -
c TELEPitONE f315)349-2422 I
.5'E 3
a f.E 5 Licensee
[cg E4 Cause & Corrective b,"',
Ild'C I
E$
.2 s &
Event u '2
$?
Action to c$ E E
j 5; g Report a N0 j'
Prevent Recurrence c5 84-17 12/8/84 S
~7 11 Load reduction to 71% CTP for Control Rod Pattern Adjustment.
84-18 12/16/84 F
99.S A
1 Failure of #12 Backup Scram Sole-noid Valve during surveillance testing, replaced #12 Backup Scram Solenoid Valve.'
84-19
-12/20/84 S
9.5 11 Load reduction to 9 *4 CTP for Control Rod Pattern Adjustment.
84-20 12/23/84 S
13 11 Load reduction to 855 CTP for Control Rod Pattern Adjustment.
}
.,w i
2 3
4 F: Forced Reason y Method:
Exhibit G In.tructions S: Schedulcil A Equipment Failure (Explain) 1 Manual for Preparatioa of Data B Mahurance or Test 2 Manual Seram.
Entry Sheeq for Licensee C. Refueling 3 Automatic Scram.
Event Repert (LER) File (NUREG-
. D Regulatory Restriction 4-Other ( Explain) 0161)
E-Operator Training & License Examination F-Administra'8 :
i 5
j C 0,,crational Error (Explain)
Exhib.i 1 Same Source lis/77)
Il Other (+ Explain) s i
I I
[
hsys,ahd Dyn4 _)
~rc-Nf.tP-1025 7 NI AGARA MOHAWK POWER CORPORATION NI AGt H A
. MOHAWK soo tait rioute vano wtst SVR ACUSE. N v.13 202
~ -.
Olrector Office of in.spection and Enforccment U.S. Nuclear Regulatory -Commission Washington, - DC 20555 Attn:
Document and Control Desk Re: Docket No. 50-220 DPR-63 Ocar Sir:
Submitted herewith is the Report of Operating Statistics and Shutdown for December 1984 for the Nine blite Point Nuclear Station Unit N1.
Also included is a narrative report of Operating Experience for December 1984 Very traly yowts,
-l
' art. 7 M-
.$'s f& ^
Thomas E. Lempges Vice President Nuclear Generation L,