1.
MARK 111 CONTAINMENT HYDROGEN CONTROL OWNERS GROUP som a. soess. choirman c/c Mississippi Power ond Light e P.O. Dox 1640 e Jackson, Mississippi 09205 601 969-2458 January 8, 1985 U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
20555 Attention:
Mr. Harold R. Denton
Dear Mr. Denton:
SUBJECT:
Hydrogen Control Owners Group Program Plan HCN-025 On December 14, 1984, the Hydrogen Control Owners Group (HCOG) submitted a copy of its Hydrogen Control Program Plan for demonstrating compliance with the hydrogen control requirements. HCOG requests that a meeting between the HCOG members and executives and Nuclear Regulatory Commission (NRC) Staf f be scheduled for January 23, 1985.
The purpose of this meeting is to discuss the Hydrogen Control Program Plan and acceptaace criteria, and to obtain NRC approval of the program plan concept and philosophy. Attachment i to this letter provides a proposed agenda for this meeting.
Following the requested January 23, 1985 meeting, the HCOG believes that more detailed technical meetings with appropriate NRC Staff review personnel are needed to review the individual program plan tasks and associated acceptance criteria. It is suggested that these meetings be held on January 24 and 25, 1985. Some of those tasks are complete (or essentially complete) se identified in the individual task descriptions in the program plan, and it is anticipated that discussion of those tasks will be limited. Attachment 2 provides a proposed agenda with those two days which groups closely related tasks, thus allowing more effective conduct of the meetings.
HCOG feels that the approach set forth in this letter will satisfactorily resolve hydrogen control issues as related to the Mark III Containment in a canner that will efficiently utilize NRC and utility resources.
If you have any questions, please don't hesitate to contact me.
Sincerely, 8501300186 850108 PDR ADOCK 05000416 S. H. Hobbs P
PDR Chairman, HCOG SHH:vog 1
Attachments cc (See Next Page) ed d2vogi
m-
- v HGN-025 Paga 2 ec:
Mr. Carl R. Stahle (w/a)
Hydrogen Control Program Manager U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation p
Washington, D. C.
20555
~
Mr. Charles G. Tinkler (w/a) t-Containment Systems Branch U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Washington, D. C.
20555
~
Mr. John Cummings, Project Manager (w/a)
Hydrogen Studies, Division 4441 Sandia National. Laboratory Albuquerque, NM 87185 0
~
i _.
EYE 1 -
s; r
f Y
h 1
d2vog2 t__
+
gmy4 - et# 'h'g 2'Y"JOd'M 8-
- - ^ * -
e 8-e'""
=
i l
w t
[
g UNITED STATES j i i
NUCLEAR REGULATORY COMMISSION
[
+.,...../
wasmNGTON,D.C. 20555
(
s I
E' l
h 1
Document Control Desk i
Please docket this document under the following j
j docket Nos.
[
i 50-416/417 8
50-458/459
?
50-440 i
50-461 i
j.
)
1 i
i 4
u l
~
6 N
N l
t.
.,,w, n -.
---...-------..----,-.-----.__.-....e i h
~
e, Attachssnt 1 to HCN-025 b
MEETING AGENDA HYDROGEN CONTROL OWNERS GROUP MEETING WITH NRC STAFP JANUARY 23, 1985 10:00 - 10:15 Introduction and overview
- Coals and Objectives-of Meeting
- HCOG Organization
- Program Plan Philosophy 10:15 - 11:00 Hydrogen Control Program
- Programmatic Coals
- Work Complete to Date
- Open Issues
- Purpose of Program Plan
- Acceptance Criteria Philosophy
- Task Description
- Schedule i
11:00 - 11:30 Program Plan Acceptance Schedule
- Work in Progress
- Major Milestones
- Requested-NRC Action
'11:30 - 12iOO Executive Summary 12:00 - 1:00 Lunch 1:00 - 2:00.
Open Discussion r
~.
Y d2vog3; 4
e, Attcchasnt 2 to llGN-025 MEETING AGENDA-HYDROGEN CONTROL OWNERS GROUP MEETING WITH NRC STAFF JANUARY 24 and 25, 1985 January 24, 1985 8:30 - 12:00 Detailed Task Discussion
- Task 2 Select Mitigation System
- Task 3, Design Hydrogen Ignition System
- Task 4 Containment Ultimate Capacity Analysis
- Task 5, Selection of Containment
. Response Analysis Code
- Task 6, Hydrogen Combustion Testing
- Task 8, Containment Response Analysis
- Task 9 Diffusion Flame Thermal Environment
}
- Task 10. Evaluation of Drywell
-Response to Degraded Core Accidents
- Task 13, Combustion Cas Control EPG 12:00
- 1:00 Lunch 1:00 - 4:00 Continuation of Detailed Task Discussion January 25, 1985 8:00 - 12:00
-Detailed Task Discussion
- Task 1, Establish Most Probable Hydrogen Generation Event
- Task 7, Generation of Hydrogen Release Histories
.12:00 - 1:00 Lunch 1:00 - 4:00 Detailed Task-Discussion
- Task 11, -Equipment Servivability Analysis I
- Task 12, Validation of Analytical Methods
- Task 14, Nevads Test Site Data.
Evaluation-d2vog4
-