Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6551998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20195E5611998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154L6661998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for Catawba Nuclear Station,Unit 2 ML20153B2921998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Catawba Nuclear Station,Units 1 & 2 ML20153B3071998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8071998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20237B2551998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236F0321998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20236Q8091998-05-31031 May 1998 Revised MOR for May 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247K4451998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for Catawba Nuclear Station ML20247M0251998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Catawba Nuclear Station,Units 1 & 2 ML20247M0361998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20217B2271998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216E2371998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station ML20217B2341998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1998 for Catawba Nuclear Station,Units 1 & 2 ML20202G8641998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F4301998-01-31031 January 1998 Revised Monthly Operating Repts for Jan 1998 for Catawba Nuclear Station ML20198P3261997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20202G8911997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for Catawba Nuclear Station,Units 1 & 2 ML20198P3431997-11-30030 November 1997 Revised MOR for Nov 1997 for Catawba Nuclear Station,Unit 1 ML20203H5721997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Catawba Nuclear Station,Units 1 & 2 ML20199C7271997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Catawba Nuclear Station ML20203H5801997-10-31031 October 1997 Revised Monthly Operating Repts for Catawba Nuclear Station, Units 1 & 2,for Oct 1997 ML20211P9771997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Catawba Nuclear Station ML20216K1511997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for CNS ML20210L0411997-07-31031 July 1997 Monthly Operating Repts for July 1997 for CNS ML20216K1611997-07-31031 July 1997 Revised MORs for July 1997 for CNS ML20141H2221997-06-30030 June 1997 Monthly Operating Repts for June 1997 for Catawba Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217H0201999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Catawba Nuclear Station,Units 1 & 2 ML20216E5401999-09-0707 September 1999 Special Rept:On 990826,discovered That Meteorological Sys Upper Wind Speed Cup Set Broken,Causing Upper Wind Channel to Be Inoperable.Cup Set Replaced & Channel Restored to Operable Status on 990826 ML20212B4711999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20217H0321999-08-31031 August 1999 Revised Monthly Operating Rept for Aug 1999 for Catawba Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211A9791999-08-20020 August 1999 Safety Evaluation Granting Licensee Request for Approval of Proposed Relief from Volumetric Exam Requirements of ASME B&PV Code,Section Xi,For Plant,Unit 2 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20211C1291999-08-17017 August 1999 ISI Rept Unit 1 Catawba 1999 RFO 11 ML20210R1051999-08-0606 August 1999 Special Rept:On 990628,cathodic Protection Sys Was Declared Inoperable After Sys Did Not Pass Acceptance Criteria of Bimonthly Surveillance.Work Request 98085802 Was Initiated & Connections on Well Anode Were Cleaned or Replaced ML20210S2891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20212B4871999-07-31031 July 1999 Revised Monthly Operating Rept for July 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20210S2951999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4501999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Catawba Nuclear Station,Units 1 & 2 ML20209H4561999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20196A0001999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206P5201999-05-14014 May 1999 Safety Evaluation Accepting GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves ML20206N8391999-05-0404 May 1999 Rev 16 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr ML20206R1811999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20196A0041999-04-30030 April 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20206N8261999-04-22022 April 1999 Rev 15 to CNEI-0400-24, Catawba Unit 1 Cycle 12 Colr. Page 145 of 270 of Incoming Submittal Not Included ML20205S5551999-04-21021 April 1999 Safety Evaluation Accepting Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design Basis Accident Conditions ML20205N3651999-04-12012 April 1999 Safety Evaluation Accepting IPE of External Events Submittal ML18016A9011999-04-12012 April 1999 Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected ML20206R1931999-03-31031 March 1999 Revised Monthly Operating Repts for Apr 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9521999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Catawba Nuclear Station,Units 1 & 2 ML20205P9561999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20204C9111999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Catawba Nuclear Station,Units 1 & 2 ML20203A2581999-02-0505 February 1999 Safety Evaluation of TR DPC-NE-3002-A,Rev 2, UFSAR Chapter 15 Sys Transient Analysis Methodology. Rept Acceptable. Staff Requests Duke Energy Corp to Publish Accepted Version of TR within 3 Months of Receipt of SE ML20204C9161999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Catawba Nuclear Station,Units 1 & 2 ML20199K8711999-01-13013 January 1999 Inservice Insp Rept for Unit 2 Catawba 1998 Refueling Outage 9 ML20199E3071998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Catawba Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20205E9441998-12-31031 December 1998 1998 10CFR50.59 Rept for Catawba Nuclear Station,Units 1 & 2, Containing Brief Description of Changes,Tests & Experiments,Including Summary of Ses.With ML20206P2081998-12-31031 December 1998 Special Rept:On 981218,inoperability of Meteorological Monitoring Instrumentation Channels,Was Observed.Caused by Data Logger Overloading Circuit.Replaced & Repaired Temp Signal Processor ML20203A4101998-12-22022 December 1998 Rev 16 to CNEI-0400-25, Catawba Unit 2 Cycle 10 Colr ML20203A4041998-12-22022 December 1998 Rev 14 to CNEI-0400-24, Catawba Unit 1 Cycle 11 Colr ML20198B1341998-12-14014 December 1998 Revised Special Rept:On 980505,discovered That Certain Fire Barriers Appeared to Be Degraded.Caused by Removal of Firestop Damming Boards.Hourly Fire Watches Established in Affected Areas ML20196J8351998-12-0808 December 1998 Safety Evaluation Granting Relief Request Re Relief Valves in Diesel Generator Fuel Oil Sys ML20199E3221998-11-30030 November 1998 Revised MOR for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198E3151998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Catawba Nuclear Station,Units 1 & 2 ML20196C0251998-11-27027 November 1998 SER Accepting Clarification on Calibration Tolerances on Trip Setpoints for Catawba Nuclear Station ML20196A6881998-11-25025 November 1998 Safety Evaluation Granting Relief Request 98-02 Re Limited Exam for Three Welds ML20196D4041998-11-19019 November 1998 Rev 1 to Special Rept:On 980618,determined That Method Used to Calibrate Wind Speed Instrumentation Loops of Meteorological Monitoring Instrumentation Sys Does Not Meet TS Definition for Channel Calibration.Procedure Revised ML20195E5521998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20198E3261998-10-31031 October 1998 Revised Monthly Operating Repts for Oct 1998 for Catawba Nuclear Station,Units 1 & 2 ML20154M7661998-10-12012 October 1998 LER 98-S01-00:on 980913,terminated Vendor Employee Entered Protected Area.Caused by Computer Interface Malfunction. Security Retained Vendor Employee Badge to Prevent Further Access & Computer Malfunction Was Repaired.With 1999-09-07
[Table view] |
Text
' ~
'"' ~'
jdy _
1.Q (
4 Of-ERAllilG OA!4 REPDRT I0CKET N') 50-415 DATE Auaust 14,1972 OPErgilNG STATUS COnPLETED BY R.A. Utilians TELEPHONE 704-38 M 346 ,
- 1. Unit Nase: Catauba 1
- 2. Reporting Feriod: July 1, 1992-July 31, 1992
- 3. Licensed Thereal Poner (MWt): 3411
- 4. Naseplate Rating (Gross MWe): 1305e Notes lNaseplate Rating
- 5. Design Electrical Rating (Net MWeh 1145 (6ross MWel calculate 1 as
- 6. Maxinus Lependable Capac'ty Gross MWe):
. !!92 1450.000 MVA : .90 power
- 7. Maxisus Dependable Capacity (Net hje): !!29 facto per Page lii, B. If Changes Occur in Capacity Ratings (Itess Nuster 3 Through 7) Since Last NURCS-0020.
Report. Give Reasons _
- 9. Feuer Level To Which Restrictt3, if Any (r.at l'We): .
p
- 10. Reason For Restrictions, if anyt ._ ,,
This Month Yr.-to-Date Cuaulative
!!. neurs in Reporting Period 7H.0 5111.0 62160.0
- 12. Nusber Of Hours Reactor Was Critical 23b 0 4605.0 46595.3
- 13. Pentor Reserve Shutdoun Hours --0-- --0-- --0--
- 14. Heurs Generator On-Line 237.5 4604.5 6000.4
- 15. Unit Reserve Shutdown Hours --0-- - --0--
- 16. Gro u Thersal Energy Generated (MWH) 745249 15333142 14392H47 17: Bron Electrital Enerp Generated (MWH) 2 W 65 5433639 32303043
- 19. Net Electrical 64rgy Generated (MW4) 229200 5147253 490B0947
'19. Unit Service Factor 31.9 90.1 74.0
- 20. Unit Av>!! ability Factor 31.9 90.1 74.0
- 21. Unit Capacity Factor (Using MDC Ne'.) 27.3 89.2 69.6
' 22. Unit Capacity Factor (Using DER ?.et) 26.9 88.0 69.0
- 23. Unit Forced Outage Rate 0.0 0.0 10.5
- 24. Shutdown Schedal:10ver Next i Months (iype, Date, ar.d Duration of Each):
Currently Refueling 25, If FW59 At End Of Repart Period. Estinated Date of Startup: u nte.her 19. 1992 26; Unn i tem Status (Prior to Consercial Operationh Forecast Achieved INITIAL CRITICALITY _
lh!TIAL ELECTRIC 11y COMERCIAL CPERATlun _ _
9208190175 920813 i PDR ADOCK 05000413 I
R PDR l
Qi%Elll/WUjM[YfTT'*' ~
ffg}f (f% dikfi C C *'
{& $.'$$'$fkWA$Yf' 5
0 PEDALING CATA REFORI L
00CrET ND 50-413 UN11 Cataca 1 DATE f unst 14. 1992 COMPLETED BY R.A. Willians TELEPHOME ?.?4-392-5346 MONTH July,1992
- D3 AVERA5E DAILY POWER LEVEL DAY AVERABE DAILY POWER LEVEL s (MWe Ntl (MWe-Met) 1 1064 17 0 2 . . _
1049. 18 0 __
3 1044 19 _ ___0 .,
4 1035 20 0 5 1034 21 0 6 1619 .__
22 0
'i 1011 23 0 2 989 24 0 9 928 25 0 N 10 561 .,_
26 0 11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 I
I
. -,.-w-__._
.DOCKFVJ NO. 50-413 UMIT SHUTDOWNS AND POWER liEDUCTIONS UNIT NAME- carawua 1 DATE uuflafwz -
July 1992 COMPLETED BY 74. u. dinnvids REPORT MONTH TELEPHONE j rv4J su4:5zea (1) 2) 3
!(4) (5)
E HOD 'e T A OF LICENSE CAUSE AND CORRECTIVE N Y , SHUY EVENT SYS- . .
ACTION TO P DURATION O DOWlJ REPORT TEM COMPONENT O
NO. CODE CODE PREVENT RECURRENCE DATE E HOURS N R/X
{. F A -- CH INSTRU AMSAC CIRCUITRY NOT RES m ING 7 -1L' 92- 7-10 --
' S 506.48 C 1 RC FUELXX END-OF-CYCLE '6' REFUELING OUTAGE s 1 92- 7-10 1
A l
(3) (4)
Exhibit G - Instructions
[d *
(1) (2)teason
- Method: for Preparation of Data F Forced 1-Manual S Scheduled --" qui 'ttent Failure (Explain) 2-Manual Scram Entry Sheets For Licensee f.yg in enance or. test 3-Automatic Scram Event Re ort LER)
C-Refueling 4-Other (Explain) File (NU EG-0 61)
D-Regulatory R9striction -W 4
E-Operator Training & License Examination (5'Exhibit I - Same Source F-Administrative I G-Operator Error H-Other (Explain) (Explain) 'O hm 5
e 1y
, ^ L.,
'T DOCKET NO: 50-413' UNIT: Catawba 1 DATE: 8/13/92 NARRATIVE
SUMMARY
MONTH: July 1992 e
Catawba Unit 1 began the month of July coasting down in power to move the refueling outage to 7/11. The unit started a power decrease en 7/10 at 0819 and secured' power decrease at approximately 25% po'-er from 1530
.to 1725 due to the AMc6C circuitry not resetting. The unit was taken-off-line at 2131 for End-of-Cycle 6 refueling outage. The unit enoed the raonth in the refueling outage.
4 Prepared by: N. C. Simmons.
Telephone: 704-382-52r,3
MONTiiLY REFUELING INFORMATl,0N REQUEST 4
- 4. - ' Facility name:' Catawba Unit 1 .I
- 12. : Scheduled next refueling shutdown: July 1992
.- 3 . _ . Scheduled restart-following re#ueling: Seotember 1992 -
THE PROJECT MANAGER'HAS BEEN A0VIdED BY SEPARATE COMMUNICATION OF
- ANY T.S. 7.:HANGE - OR LICENSE AMENDMENT. THEREFORE, QUESTIONS .4 THROUGH t> GlLL,NO IENGER-BE MAINTAINED IN THIS REPORT.
- 4. Will- refueling or resumption of orcration thereafter require a technical specification change sr other license amendment?
If _ y_es, what 'will these be?
- If nc, has-reload design and core configuration been reviewed by Saf ty Review Committee regarding unreviewed safety questions?
-1
=5.- Scheduled 'date(s) for submitting proposed licensing action and ;
supporting information.
6.' LImportant . licensing considerations (now or different design or l supplier, unroviewed design or performaace analysis methods, l significant changes in design or new operating procedures).
- _ 7 '. Number _'of Fuel assemblies (a) in the core: 193
-(b) in the spent fuel pool: 408 8'. Present licensed fuel pool capacity: 1418
-Siza-Tof requested or planned increase: -
9.' Projected Ldate of last refueling which can be accommodated by present licensed capacity: Erptember 2009-DUKE POWER COMPANY DATL August 13, 1992 blame of
Contact:
R."A. Wil1fams Phone: 704-382-5346 o
r ,.-m.~ - -
. . . - - - n. .- -- -~ ._. ..- - . . - - ~ - - - - - . . . - - . - ~ . -,,
@ ,,. ,=
4 OPERATINS DATA REPDPT.
DCCKET NO $0-414
- DATE Aco"st 16. la92 QPERATINSSTATUS COMPLETED BY , R.A. Williaes TELEPHONE 704-382-5346 it. Unl. Names Cataub4 2-
+ 2, Reporting Period: July 1, 1992-July 31, 1992
- 3. Licensed Thereal Power (MWt): 3411 _.
- 4. Nameplate Rat'ng (Gross MWel 13051 Notes *Naseplate Rating
- 5.DesignElectritalRating(NetMWelt 1145 (6ross MWel calrulated as
- 6. Maxinus Dependable Capacity (Gross FWelt 1192 { 1450.000 MVA x .90 power
- 7. Maxieus Dependable Capacity (Wet MWe):: -1129 factor per Page ill,
- b. If Ct.anges Occur in Capacity Ratings litems Nuoter 3 Tietough 7) Since Last NUREG-0020.
- f:eport. Give Reasonst l} 9. Power Level To Which kastricted, If Any (Net MWe h 10' Reason for Restrictions, If any:-
F This Month Yr.-to-Date Cuaulative
-11. Hours In Reporting Period- 744.0 5111.0 52176.0
- 12. Number Of Hours Reactor Was criticai 744.0 5088.4' 39306.0
- 13. Reactor Rese>ve Shutdown Hours. --0-- --0-- -
- 14. Hours 6ea rator On-Line 744.0 5057.9 38621.1
'15. Unit' Reserve Shutt.onn Hours - -
16L 6 toss thermal Energy Generated (MWHl. 2492344 16885332 122012509 174GrossElectricalEnergyGenerated(MWH) 873397 5995852 43171767
- 18. Net Electrical Energy Benerated (MWHl. .627176 5689183_ 40543052'
- 19. Unit Service Factor 100.0 99.0 74.0 20._ Unit Availability Fatter 100.0; 99.0 .74.0 121. Unit Capacity Factor (using MDC Net) 98.5 98.6 69.6
- 22. Unit Capacity Factor l(Using 3ER Net) 97.1 97.2 67.9
- 23. !! nit Forced Outae Rate _ _ _
0.0 0.8 - 11.7 24.t Shutdown Schedated Over Next.6 Months (Type, Date, and Durati6n of Each):
L Re fu e li n e - January 31;~1993 - 65 davs ,
2 25. If Shut-Doun At End Of Report Period. Estimated Date of Startuoi
~26. llnits in Test Status (Prior _to Coamercial Operation): Forecast Achieved
!NITIAL CRITICAttiY _
INITIA'tELEC1RICITY
- COMMERCIALfjPERATION J
hbfbfb YkYY t' w
0FiAATINE DATA REFORT DOCLET NO $0-414 UNIT Catasta 2 TATE Aunst 14.199a ,
COMPLETED BY R.A. Willians TELEPI;0NE 704-332-5346 MONTH July,IL92 f AJ, i AVERAGE DAILY POWER LEVEL IJJ AVERAGE DAILY PCWER LEVEL (MWe-Met) (De-Net) ,
1 '1122 17 tilB 2 !!23 IB 1121 3 1121 19 1121 4 1099 20 1120
~
5 11?9 21 11'.7 6 _ 1125 22 1098 7 ;t26 23 1085 8 !!20 24 _
1099
~
9 t120 25 0 96 -
10 _
1110 26 ,
1114 a
11 1114 27 1115 12 1118 2B 1121 13 1 (13 29 1123 )
16 1007- ,,
30 _ . 1]E0 15 1115 11 1118 16 1119
'I Y
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-414
, DATE us/la/9z 3 REPORT MONTH July 1992 COMPLETED BY n. u. dinavad TELI: PHONE _y u4)-auz-:>zoa (1) 3 (4) (5).
{2) _
E- HOD T A OF LICENSE-N- .Y ..
S SHUT! ' EVENT SYS- CAUS AND CORRECTIVE O P ' DURATION . O DOWN REPORT TEM COMPONENT. -ACTION TO
. .DATE E HOURS N P/X NO. CCDE CODE PREVEiiT RECURRENCE 4- 12-P 92- 7-14 F- --
A --
HA VALVEX MAIN TURBINE HYDRAULIC OIL SYSTDI TEST VALV" PROBLEMS 1
2
- (1) (2) (3) (4)
F . Forceti Reason- Method: Exhibit G - Instructions S Scheduled- 1-Manual for Preparation of Data
- A-Equihnent FailureP-Maintenance or test (Explain) 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram (LER ;
D-Regulatory Restriction , 4-Other (Explaf') Event Report (N W EG-0161))
File j E-Operator Training &-License Examination ;
F-Administrative (5)
G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain) -
l s
P
4
^
DOCKET NO: 50-414 UNIT: Catawba 2 DATE: 8/13/92 NARRATIVE SUK M Y MONTH: July 1992 Catawba Unit 2 began the month of July operating at 100% full power. -
The unit started a power decrease on 7/13 at 2330 and held at approximately 70% power to repair the main turbine hydraulic oil system test valve from 7/14 at 0255 to 0535. The unit was returned to 100% full power at 1230. The unit started a power decrease on 7/22 at 0939 and held at approximately 95% power tc take a heater drain pump out of service from 1015 to 7 '.:4 at 1200. The unit was returned to 100% ,-
full power at 1300. On 7/25 'at 0740 the unit started a power decrease, ut . *t held at approximately 80% power from 0840 to 1125 to perform the control valve movement test. The ur.it was returned to 100% full powe.r at 1542. The unit operated at or near 100% for the remainder of the toonth , j 5
i Prepared by: N. C. Simmons
s e
l l
I MONTHLY REFUELING INFORMATION..R_EOUEST
- 1. Facility name: Catawba, Unit 2
- 2. Scheduled next refueling-shutdown: February 1993
- 3. Scheduled restart following refueling: April 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUf'ICATION OF ANY T.S. CHANGE OR LICEKSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? _ _ _
If yes, what. will these be?
If no, has reload design and core configuration been reviewed by *'
Safety Review Committee regarding unreviewcd safety questions?
- 5. Scheduled date(s) for. submitting proposed licensing action and aupporting information.
- 6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). .
- 7. Number of Fuel assemblies (a) in the core: 193 5
(b) in the spent fuel pool: 280
- 8. Present licensed fuel pool capacity: 1418 Size of requested or planned increase: -
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: September 2011 DUKE POWER COMPANY DATE: August 13, 1992 Name of
Contact:
R. A. Williams Phone: 704-382-5346