r s

s OPERATING DATA REPORT DOCKET NO. 50-286 DATE 1 8 s _

COMPLETED BY .L 7tily TELEPHONE LL.tL.7.3.9-8200 OPERATING STATUS Notes

1. Unit Name: Indian Point No. 3 Nuclear Power Plant
2. Reporting Period: n --h- WA '
3. Licensed Thermal Power (MWt): 3025
4. Nameplate Rating (Gross MWe): 1013 '
5. . Design Electrical Rating (Net MWe): 965
6. Maximum Dependable Capacity (Gross MWe): 1000
7. Maximum Dependable Capacity (Net MWe): 965
8. If Changes Occur in Capacity Ratingt (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted,if Any (Net MWe):
10. Reasons For Restrictions.lf Any:

. This Month Yr to Dete Cumuistive

11. Hours in Reporting Period 9aa _

n 7na n 73.105

12. Number Of Hours Reactor Was Critical 744 6.941:73 41.166_23
13. Reactor Reserve Shutdown Hours o o 'o
14. Hours Generator On Line 7aa n 7nn na lo.n47 qa
15. Unit Reserve Shutdown Hours o o o
16. Gross Thermal Energy Generated (MWH) 2,228,749.92 19,279,301.38- 10s,704,946.30
17. Gross Electrical Energy Generated (MWH)  ??n.11n n ;79 7nn 32.642.315
18. Net Electrical Energy Generated (MWH) 702,652 6.041.938 31.206.116
19. Unit Service Factor inn.n _

vn , na s

20. Unit Availability Factor 100.0 76;3 s4.5
21. Unit Capacity Factor (Using MDC Net) 97 9 71.1 an 7*
22. Unit Capacity Factor (Using DER Net) 97.9 71.3 44.3
23. Unit Forced Outage Rate n n 11 s 91 7
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each1:
  • Weighted Average cycle 4/5 Refuelina Ourace (Pe r _ ,Tuw long) ,

9 25 If Shut Down At End Of Report Period. Estimated Date of Startup:

26 Units in Test Status iPrior to Commercial Operation): Forecast . Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COPIMERCIAL OPER ATION Nh '

8501240531 851231 '

PDR ADOCK 05000286 R PDR

}[})

AVERAGE DAILY UNIT POWER LEVEL l

' DOCKET NO. 50-286 Indian Point UNIT No. 3 DATE 1-2--85 CCN!PLETED BY T.n vrv vn11v TELEPHONE (914) 739-8200 SiONTH December 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (51We-Net) 151We-Net i I 749 17 953 2 951 18 951 3 955 19 949 4 953 20 949 5 446 21 osn 6 943 22 951 7 440 23 948 8 934 24 929

' "A" 25 naa __

10 951 _ 26 913-11 953 27 967 12 953 28 967 13 953 29 966 14 953 30 966 15 " "s ?

31 4As 16 955 INSTRUCTIONS On this format. list the average daily unit power levelin .\lWe Net for each day in the reportmg month. Comput the nearest whole megawatt, f

eU77:

... . . m

DOCKET NO. 50-286' i UNIT SilUTDOWNS AND POWER REDUCTIONS UNITNAME Indian . Point N6 DATE _

1-2-85 _

COMPLETED BY - r.._xc11v REPORTMONTil Decamber 1984' -

TELErilONE f9141 *n9-n200 1

3 -

1 3 L3c8888'  !*.  % Cause & Corrective Nie' Due f E3 0.

g s3 =i g Ewns Repersa sua7 g g

Acigo, ,,

Prevent Recurrence l d 1-NONE i: -~s i

/

\

  • l l

I' 1

1

, - l l' I 2 3 4 F: Fesced Reason: Metlied: Erllble i Instructions S: Scheduled - A.Equipnient Failure (Fxplain) l Manual f i Peaa- =siim of Data

!* B-Malasenance of Test 2 Manual Scram. En .: for Licensee

'C Refueling 3 AntonaticScram. Even. 4...,xus (LER) File (NUREG.

. D-Regulasury Reserission 4 Otiwr(Explain) 0161)

.. E4perator Training & Ucense Emandnation e ~

F.Administraalve 5

!l Geperational Error (Explain) Exhibit

  • Same Source l'8/77) llother(Esplein) .

1

.~1 MONTHLY MAINTENANCE REPORT December, 1984 MONTH MWR# DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION 5275 12/13/84 Charging Pump #32 Pump seals leak Replaced stuffing box' seals and fluid cylinder valves 5375 12/13/84 Service Water Pump #35 Pump shaft broken Installed spare pump 5378 12/19/84 Service Water Zurn Strainer #36 Strainer not rotating Replaced backwash arm to shaft pin 5449 12/28/84 Containment Pressure Relief Valve inoperative Cleaned solenoid valve Valve Actuating Solenoid Valve SOV-1292

)

s e

e

l -

f,

+

[

~ '

_ ~

h. 't-

~

MONTHLY I-& C CATECORY I REPORT

~

2 December-1984'<

Month- . .

m W.R.' # DATE EQUIPMENT MALFUNCTION CORRECTIVE ACTION

' 3568 12/3/84 Computer P-250 Nuclear Power Upper / Lower deviation alarm . Replaced circuit board. Cali-1 Range. Instrumentation Upper / does not clear. brated unit. . _ .

Lower' Deviation Alarm

.r ,.

. 3211- - 12/4/84

~

Nuclear Instrumentation Power Test; potentiometer "A" ' Replaced potentiometer-dial.

~ Range N42- binding at dial.

3356' 12/10/84 #32 Small Gas Decay Tank Press- No output from transmitter. Replaced pneumatic SERVOL ure Indicator FIA1053 relay. Calibrated transmitter.

3629 '12/11/84 - Radioactive Machine: Shop Part-  : Remote alarm does not func- Replaced fuse.

-iculate Iodine And Noble Gas tion.

- . Radiation Monitors R-57,.R-58,

.c - - 4 And R-59 Repaired connector.

- Fan Cooler-Unit Service Water Detector co.mector pin dis-3368 12/13/84

.-~

- Radiation Monitor R lodged.

3597 12/17/84U 'St'eam Generator Level Mismatch Bistable trip cannot be ad- Replaced capacitor C201: cal-Bistable LC-447G- justed properly, ibrated bistable.

3255

. '12/20/84

~

Laundry Waste Liquid Radiation Category alarm inoparative. . Reprogrammed' annunciator' pro-

Monitor'R-50' grammer. Installed ' j umper

"~ '

across low flow switch con-tacts.

. i -

.b

.. .. ww m , '

., }"- i 't-

'l , ,

s

-e -g.

.- 1

% l N

MONTHLY I & C CATEGORY.I. REPORT ~

+-

a

...: December'1984

' Month-

, 3. ..

W.R. # DATE - EQUIPMENT MALFUNCTION ' CORRECTIVE ACTION *

  1. 32 Steam' Generator Relief

--3684 12/20/84' Air regualtor leaks. Replaced regualtor.

Valve PCV-1135 3677 12/27/84 Fire Protection Sprinkler ";aug'es have no indicator Reattached indicator to FP206A.

.FP206. needles. Replaced FP206B with new unit.~

Calibrated both guages.

A me

.,c

'm

.+

SUMMARY

OF OPERATIVE EXPERIENCE, DECEMBER 1984 Indian Point Unit 3 was synchronized to the bus for a total of 744 hours0.00861 days <br />0.207 hours <br />0.00123 weeks <br />2.83092e-4 months <br /> producing a gross generation of 728,130 MWe for this reporting period.

The Unit remained on line for the entira reporting period without experiencing any trips or reportable load reductions.

Year-to-date and cumulative numbers reflect a 150 MWe and 248 MWe error for Gross Electrical and Net Electrical Generation respectively for the month of October 1984.

LJ-

Indien Point 3 Nuclear Power Plant P.O. Bon 215 Buchanan, NewWrk 10S11 914 739.8200-

  1. > NewYorkPbwer 1sf Authority January 15, 1985 IP-LK-68 Docket No. 50-286 License No. DPR-64 Director, Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed you will find twelve copies of the monthly operating report relating to Indian Point 3 Nuclear Power Plant for the month of December, 1984.

truly you

/

c/

John C. Brons

~

Resident Manager LK/bam Enclosures (12 Copies) cc: Dr. Thomas E. Murley, Regional Administrator Region i U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 IP3 Resident Inspectors' Office George Wilverding (SRC), WP0 C. A. McNeill, WPO J. P. Bayne, WPO S. V. Fuller, NYO W. R. Yario, NY0 INPO Records Center Suite 1500 1100 circle 75 Parkway ,

Atlanta, Georgia 30339 '

  • I