ML20113G686

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 4,Procedure Change 1 to EPIP-57, Corporate Emergency Response. W/920407 Release Memo
ML20113G686
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 03/19/1992
From: Conway W
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20113G687 List:
References
NUDOCS 9204160144
Download: ML20113G686 (1)


Text

__ _ _ _ - - _ _ _ _ _ _ _

i 10 CFR 50, App. E.V Arizona Public Service Company, P O DOX 53999

  • PHOENIX, art 2ON A 85072-3999 WILLIAM F CONWAY E MECUTtvE vtCE PRES 40f MT 161-04680 WFC/N EM March 19,1992 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-37 Washington, DC 20555

Dear Sirs:

Subject:

Palo Verde Nuclear Generating Station (PVNGS)

Units _1,2, and 3 Docket Nos. STN 50-528/529/530-Emergency Plan implementing Procedure Update File: 92-002-493: 92-056-026 In accordance with 10 CFR 50, Appendix E.V, enclosed please find a copy _of one updated PVNGS Emergency Plan implementing Procedure (EPIP). The procedure included with this transmittal is indicated on Enclosure A. The EPIP, and an updated listing of the PVNGS EPIPs, are included as Enclosure B.

By copy of this letter, Arizona Public Service Company is forwarding two sets of the revised EPIP to the NRC Region V Office. A. copy of the revised EPIP is routinely provided to the Resident inspector at PVNGS as an update to controlled procedures assigned to the NRC Resident inspector's Office.

if you have any questions, please contact Nora Meador at (602) 340-4088.

Sincerely, e

d WFC/NEM/nem Enclosures cc:

J. B. Martin (w/Enclost e A & 2 sets of Enclosure B)

A. C. Gehr (w/ Enclosure A)

D.H.Coe (w/ Enclosure A) hh P. M. Qualls (w/ Enclosure A & 1 set of Enclosure B) l

'i A. H. Gutterman (w/ Enclosure A) 9204160144 920319 PDR ADOCK c5000528 T2B P

PDR J