ML20113F151
| ML20113F151 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 07/02/1996 |
| From: | Berkow H NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20113F152 | List: |
| References | |
| NUDOCS 9607080375 | |
| Download: ML20113F151 (8) | |
Text
{
f ***%g
["
4 UNITED STATES j
j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C 20tW0001
\\...../
)
l DUKE POWER COMPANY i
DOCKET NO. 50-369 l
McGUIRE NUCLEAR STATION. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 167 License No. NPF-9 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 1 (the facility), Facility Operating License No. NPF-9 filed by the Duke Power Company (licensee) dated December 12, 1995, as supplemented by letter dated June 10, 1996, complies with the l
standards and requirements of the Atomic Energy Act of 1954, as ameaded (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized
{
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be l
conducted in compliance with the Conmission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; i
l and l
E.
The issuance of this amendment is in accordance with 10 CFR I
Part 51 of the Commission's regulations and all applicable I
requirements have been satisfied.
9607000375 960702 ADOCK0500g9 DR
. 1 2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-9 is hereby amended to read as follows.
Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.167
, are hereby incorporated into this license.
The licensee shall operate the facility in accordance with the Technical Specifications &nd the Environmental Protection i
Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION T
Herbert N. Berkow, Director I Project Directorate-II-2 i
Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation l
Attachment:
Technical Specification Changes Date of Issuance: July 2,1996 l
l l
l
r 1
I 1
ATTACHMENT TO LICENSE AMENDMENT NO.167 FACILITY OPERATING LICENSE NO. NPF-9 DOCKET NO. 50-369 i
Replace the following page of the Appendix "A" Technical Specifications with the enclosed page.
The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Paae Insert Paae 3/4 2-8 3/4 2-8 l
l l
l i
=
4 3
i 1
i l
POWER DISTRIBUTION LIMITS SURVEILLANCE REQUIREMENTS (Continued) c.
Performing the following calculations:
1.
For each core location, calculate the % margin to the maximum allowable design as follows:
% Operational Margin = ( 1 -
) x 100%
[F '(X,Y,Z)]OP a
% RPS Margin = ( 1 -
) x 100 %
[F '(X,Y,Z)]RPS o
where [F '(X,Y,Z)]OP and [F '(X,Y,Z)]RPS are the Operational and RPS a
o
~
design peaking limits defined in the COLR.
2.
Find the minimum Operational Margin of all locations examined in 4.2.2.2.c.1 above.
If any margin is less than zero, then either of the following actions shall be taken:
(a) Within 15 minutes:
(1)
Control the AFD to withiri new AFD limits that are determined by:
(AFD Limit) reduced = (AFD Limit)COm(3) negative negative WN
+ [ MARGIN OP] absolute value (AFD Limit)cOm W (AFD Limit) reduced
=
positive positive WN
- [ MARGIN OP] absolute value WN where MARGIN is the minimum margin from OP 4.2.2.2.c.1, and (2) Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, reset the AFD alann setpoints to the modified limits of 4.2.2.2.c.2.a. or (b)
Comply with the ACTION requirements of Specification 3.2.2, treating the margin violation in 4.2.2.2.c.1 above as the gA is exceeding its limit.
amount by which Fo 13I Defined and specified in the COLR per Specification 6.9.1.9.
McGUIRE - UNIT 1 3/4 2-8 Amendment No. 167
b8 CIC
[,gi Q
UNITED STATES
_M j
NUCLEAR REGULATORY COMMISSION l
2 WASHINGTON, D.C. 2061 g
- .*/
DUKE POWER COMPANY DOCKET NO. 50-370 McGUIRE NUCLEAR STATION. UNIT 2 AMENDMENT TO FACILITY OPERATING LICENjig Amendment No.149 License No. NPF-17 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment to the McGuire Nuclear Station, Unit 2 (the facility), Facility Operating License No. NPF-17 filed by the Duke Power Company (licensee) dated December 12, 1995, as supplemented by letter dated June 10, 1996, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activitiN: authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations set forth in 10 CFR Chapter I; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
J:
l l
2.
Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No.
NPF-17 is hereby amended to, read as follows:
Technical Soecifications The Techr.ical Specifications contained in Appendix A, as revised through Amendment No. 149, are hereby incorporated into this l
license. The licensee shall operate the facility in accordance l
with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 30 days from the date of issuance.
I I
FOR THE NUCLEAR REGULATORY COMMISSION i)-/
1 N.Berkow, Director /
Her16 Project Directorate II-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Technical Specification Changes Date of Issuance:
July 2, 1996 i
i 4
1 ATTACHMENT'TO LICENSE AMENDMENT NO. 149 j
FACILITY OPERATING LICENSE NO. NPF-17 DOCKET NO. 50-370 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the areas of change.
Remove Paaes Insert Paaes 3/4 2-8 3/4 2-8 1
l l
e
l
_ POWER DISTRIBUTION LIMITS l
SURVEILLANCE REQUIREMENTS (Continued) c.
Performing the following calculations 1.
For each core location, calculate the % margin to the maximum allowable design as follows:
% Operational Margin = ( 1 -
) x 100%
[F '(X,Y,Z) LOP a
% RPS Margin = ( 1 -
) x 100 %
[F '(X,Y,Z)]RPS a
where - [F '(X,Y,Z)]OP and [F '(X,Y,Z)]RPS are the Operational and RPS.
a o
design peaking limits defined in the.COLR.
2.
Find the minimum Operational Margin of all locations examined in 4.2.2.2.c.1 above.
If any margin is less than zero, then either of the following actions shall be taken:
i (a) Within 15 minutes:
(1) Control the AFD to withiri new AFD limits that are determined by:-
W (AFD Limit) reduced = (AFD Limit)COLR negative negative WN
+ [ MARGIN OP] absolute Value (AFD Limit) reduced
= (AFD Limit)cO m W positive positive WN
- [ MARGIN OP] absolute value WN where MARGIN is the minimum margin from OP 4.2.2.2.c.1, and (2) Within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, reset the AFD alann setpoints to the l
modified limits of 4.2.2.2.c.2.a. or (b)
Comply with the ACTION requirements of Specification 3.2.2, treatingthemargingiolationin4.2.2.2.c.1aboveasthe amount by which F is exceeding its limit.
o t
d
- Defined and specified in the COLR per Specification 6.9.1.9.
i McGUIRE - UNIT Z
3/4 2-8 Amendment No. 149
}
^
_