CD&L Carolina Power & Light Company SERIAL: NLS-85-00 6 J AN 161985 Director of Nuclear Reactor Regulation Attention:
Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2
' DOCKET NOS. 50-325 & 50-324/ LICENSE NOS. DPR-71 & DPR-62 NUREG-0 73 7, ITEM III.D.3. 4 CONTROL ROOM HABITABILITY
Dear Mr. Vassallo:
In a letter dated October 3,1984, Carolina Power & Light Company (CP&L) notified you that we were unable to achieve a 1/8-inch water gauge positive pressure in the Brunswick Steam Electric Plant Control Room during periodic testing of the Control Room Emergency Ventilation System. As stated in that letter, CP&L is conducting a program to identify and repair the sources of the excessive leakage from the Control Room.
The leakage is the result of many small leak paths through cable penetrations, door seals, ventilation ~ ducting, etc.
As a result, sealing of these pathways has developed into a major work ef fort which we were unable to complete by January 15 as previously anticipated. The program to complete these repairs i
is continuing, and a firm completion schedule will be provided to you by April 15, 1985.
Should you have any questions regarding this issue, please contact Mr. S. R.
Zimmerman at (919) 836-6242.
Yours very tr y,
.it r/4 A. B. Cutter - Vice President Nuclear Engineering & Licensing l
JSD/ccc (1021JSD) cc:
Mr. D. O. Myers (NRC-BNP)
Mr. J. P. O'Reilly. (NRC-RII)
Mr. M. Grotenhuis (NRC)
~
v p
411 Fayettevdte Street
- P. O. Box 1551
- Flaleigh, N. C. 27602
)
m..
_.~.._,