Commonweahh Edison Company j
14c3 Opus Place Downers Grove, IL 63515-5701 ESK-96-127 June 25,1996 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555
Subject:
Quad Cities Nuclear Power Station Units 1 and 2 Supplement to Application for Amendment to Facility Operating Licenses DPR-29 and DPR-30, Appendix A, Technical Specifications for the Technical Specifications Upgrade Program (TSUP)
New Surveillance Waiver NRC Docket Nos. 50-254/265
References:
(a) P. Piet letter to T. Murley, dated November 14,1995 (b) E. S. Kraft letter to NRC, dated March 25,1996 (c) P. Piet letter to NRC, dated May 10,1996 (d) E. S. Kraft letter to NRC, dated June 10,1996 The purpose of this letter is to update item 14 of Reference (a) to specify the surveillance requirements that will not be current upon full implementation. This item was previously updated in References (b), (c) and (d). Comed requests that implementation of the surveillances listed in Attachment A be delayed until the next refuel outage for each unit (the next Unit One outage for the 1/2 DG surveillances).
Four surveillances (the Emergency Diesel Generator (DG) 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test for the Unit 1/2 DG and the full load reject test for each DG) have been added to the list. These surveillances have not been performed per the appropriate approved TSUP submittals.
These tests have been performed within the last 18 months (the current and TSUP schedule), but were not performed per the TSUP reauirements. They were performed per Reg Guide 1.9 guidance. Performing these tests aga'n prior to the regular schedule (the next refuel outage for each unit, the next refuel outage on Unit One for the 1/2 DG surveillances) would constitute an unnecessary challenge to the system.
i 1
.[}00l fl 9607010071 960625 PDR ADOCK 05000254 P
PDR 1
l A Unicom Company l
(
ESK-96-127 USNRC June 25,1996 l
Please direct any questions or comments concerning this letter to Nick Chrissotimos, Regulatory Assurance, at (309)654-2241, extension 3100.
Sincerely, l
0 Ed Kraft, Jr Site Vice President Quad Cities Nuclear Power Station i
I l
Attachment:
List of deferred surveillance requirements l
t cc: H. J. Miller, Regional Administrator - RIII R. M. Pulsifer, Project Manager - NRR i
C. G. Miller, Senior Resident Inspector - Quad Cities
(
Office of Nuclear Facility Safety - IDNS D. C. Tubbs. MidAmerican Energy Co.
R. J. Singer, MidAmerican Energy Co.
I i
l t
b 1
o ATTACHMENT i
i Technical Specification Upgrade Program Quad Cities Nuclear Power Station Deferred TSUP Surveillance Requirements l
SR 4.1.A.1 Main Steam Line Isolation Valve Closure RPS Calibration, Table 4.1.A-1, l
Item 5, Unit Two.
l SR 4.1.A.1 Turbine Stop Valve - Closure, RPS Calibration, Table 4.1.A-1, Item 9, Unit Two.
SR 4.2.A.2:
Logic system Functional Tests (LSFT), for Isolation Actuation Instrumentation, Table 4.2.A-1, Items 2.a,2.b,2.c and 2.d, Secondary Containment isolation, Unit One and Unit Two.
SR 4.2.A.2 LSFT for Isolation Actuation Instrumentation, Table 4.2.A-1, Item 4.a, Reactor Water Cleanup (RWCU) isolation on Standby Liquid Control (SBLC) initiation, Unit Two.
SR 4.2.C.2 LSFT for Anticipated Transient Without Scram (ATWS)- Recirculation Pump Trip (RPT), Unit Two.
l SR 4.4.A.4.a SBLC Initiation, Unit Two.
SR 4.9.A.8.h Emergency Diesel Generator (DG) 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> test, Unit One, Unit Two, and Unit 1/2 DGs.
SR 4.9.A.8.c Emergency Diesel Generator full load reject test, Unit One, Unit Two, and Unit 1/2 DGs
)
i l