Forwards Exercise Scope & Objectives Re full-scale Exercise Scheduled for 840215-16,per Jp Stohr
ML20112E045
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 11/30/1983
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20112E013 List:
References
FOIA-84-253 NUDOCS 8501150010
Download: ML20112E045 (6)


Text

'

j, Duxe POWER GoMiwxy sac 7 kNN y

r.o. nox aman cuanwm. s.c. cau4e HAL B. TUCKER r, i.r rumr ww r r.r. corn (704 l :37;t-4 S;33

. u... r

,m. no, 6' i t c t)

November 30, 1983 Mr. James P. O'Reilly Regional Administrator U.S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, GA 30303

Subject:

Catawba Nuclear S tion - 1984 Exercise Docket Nos. 5 50-414

Dear Sir:

Attached please find the exercise scope and objectives for the 1984 Catawba full-scale exercise scheduled for February 15-16, 1984. This is submitted 75 days in advance in accordance with J. P. Stohr's January 29, 1982 letter to Mr. William 0. Parker regarding submittals prior to emergency prepared-ness exercises.

If you have any questions please contact R. M. Glover at 704/373-8669.

Very truly yours, L -? /

/

g 6LW.

Hal B. Tucker RMG/be Attachment cc: Mr. Robert Guild, Esq.

NRC Resident Inspector Attorney-at-Law Catawba Nuclear Station P. O. Box 12097 Charleston, South Carolina 29412 Palmetto Alliance 21351 Devine Street Mr. Jesse L. Riley Columbia, South Carolina 29205 Carolina Environmental Study Group 854 Henley Place Charlotte, North Carolina 28207 bmCIAC CO esoissooto e40509

)i PDR FOIA I1 AHLERS84-253 PDR l

b.i

i.

+

4 November 30, 1983

- Mr. James P. O'Reilly USNRC Atlanta, GA

Subject:

CNS - 1984 Exercise Page 2

- bc:

R. M. Glover M. E. Bolch J. W. Hampton G. F. Vaug',n Grouo: File: CN-801.02 nt b

',-}-

1 n'w%

1984 CATAWBA EXERCISE February 15-16, 1984 SCOPE AND OBJECTIVES I.

Scope The 1984 Catawba full-scale exercise is the initial test of the onsite and offsite plans and a part of the 5 year effort to test all aspects of the Station Emergency Plan and Corporate Crisis 14nagement Plan, while testing a major portion of the plans each year.

The 1984 exercise will test the ability of Duke personnel to work together in assessing and responding to a simulated radiological emergency from the control room, TSC, OSC, and Crisis Managenent Center (CMC).

The public information aspects will be tested through activation and use of a joint

~~ ~~

News Center.

Coordination between Duke Power Company and offsite emergency planning officials will be tested. The Alg_rt & Notification System in the 10 mile EPZ will be activated during the event, following protective action recommendations from Duke and assessment by the local counties. Planning for recovery and deescalation will be included in the exercise.

The exercise will be conducted over a two day period with an administrative

" hold" placed on activity during the evening of February 15. A critique will be held on the afternoon of the 16th.

Certain parts of the plans will not be tested this year. These carts are as follows:

1.

The Post Accident Sampling System is not yet operable and as such will not be a part of this exercise.

2.

The annual medical and fire drills will be conducted separately from the exercise on February 14, 1983.

The medical drill will be held in the morning and the fire drill that evening.

II.

1983 EXERCISE OBJECTIVES (DUKE POWER COMPANY EMERGENCY ORGANIZATION)

The following specific objectives will be reviewed by exercise evaluators:

1.

Emergency Management a.

To demonstrate the ability to alert & notify TSC & OSC staff and to activate the TSC and OSC facilities.

b.

To demonstrate the ability to activate the CMC and CNC.

c.

To demonstrate the ability to declare emergency classification in accordance with the Crisis Management Plan (CMP) and Station' Emergency Plan.

d.

To demonstrate the ability to provide security access control to the station, CMC, and CNC.

e.

To demonstrate management direction and control in the emergency situation.

f.

To demonstrate effective management and worker interface amongst Duke facilities, and between Duke and offsite officials.

g.

To demonstrate adequate capability for assembling station personnel in an emergency and to provide accountability for any not present at the assembly locations.

h.

To test communications between emergency facilities including outside lines, plant extensions, ringdown phone and the radio system. This test will include adequacy (quantity & quality) and operability of the instruments as well as the ability of personnel to operate the equipment.

i. To demonstrate adequate capability in those functions that are outside normal work activities. This includes technical briefers, public spokesman, special assistance coordinator / field teams, and local agency liaison,
j. To test the adequacy and operability (where appropriate) of emergency equipment / supplies including:

1.

Field team kits, vehicles, and communications.

2.

Dose assessment coordinator's kit.

3.

HP/Radwaste emergency kits.

4.

Plant data display kit.

k.

To test Crisis News in its ability to:

1.

Prepare accurate and timely news releases.

2.

Conduct joint news conferences.

3.

Work together with offsite PIO's in keeping the media "up-to-date".

4.

Keep its staff informed by periodic updates.

5.

Provide rumor control.

1.

To demonstrate precise and clear transfer of responsibility from the Shift Supervisor and Control Room to the Emergency Coordinator in the TSC to the Recovery Manager in the CMC.

m.

To demonstrate the ability to enter into recovery planning, consider deescalation and reentry, and to make appropriate reconnendations to offsite officials for the general public.

n.

To demonstrate proper use of the new message format and authenti-cation nethodology.

2.

Technical Assessment a.

To demonstrate the ability to transmit data in accordance with the

[

Crisis Management Data Transmittal System.

t b.

To demonstrate the ability to follow simulated plumes using " canned" meteorological data.

l c.

To evaluate the adequacy of the following assessment tools in the t

TSC & CMC:

1.

Data System 2.

Radiation Monitoring System (TSC only) f 3.

Drawings i

4.

Data Display d.

To test the ability of H.P./ Chemistry Staff to provide adequate:

5 1.

On-Site monitoring capability 2.

Off-Site monitoring capability 3.

Sampling Team capability 4.

Dose Assessment capability r

[

5.

Dose and Dose Record control capability.

e.

To demonstrate the ability to assess the incident, provide mitigation strategies, and develop long-term recommendations to support plant operations.

E f.

To demonstrate dose projection, failed fuel estimation, and evaluation of air and liquid samples in determining appropriate response to the situation.

+

f 3.

Protective Action Recommendations a.

To demonstrate decision making in determining appropriate protective action recomendations, in a timely manner.

=

b.

To demonstrate proper comunication of recommendations to off-site officials. (EC/ Rec. Mgr. to offsite officials, SAC to North Carolina 3

& South Carolina DHEC, Scheduling & Planning to NRC.)

a

=

c.

To demonstrate activation of the alert & notification system including review of the test to determine any problem sites.

I d.

Use of evacuation time estimates, road / bridge / weather conditions, E

offsite support available, timing / duration / type of release in determining protective action recomendations.

P s

e.

To demonstrate proper comunication of dose projections and plant conditions to the Offsite Radiological Coordinator and Nuclear Engineering Services Manager, respectively, to facilitate development of recomendations for the Recovery Manager's consideration.

4.

Plant Operations a.

To demonstrate effective means of notification to outside agencies.

TSC organization, and the CMC.

b.

To demonstrate knowledge of emergency response procedures &

mitigation strategy development.

s, c.

To demonstrate knowledge of Control Room Dose Assessment procedures.