ML20112D864
| ML20112D864 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 05/29/1984 |
| From: | Clements B TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| Shared Package | |
| ML20112D844 | List: |
| References | |
| TXX-#4181, NUDOCS 8503220439 | |
| Download: ML20112D864 (1) | |
Text
.,..
t TEXAS UTILITIES GENERATING COMPANY MKYWAY TOWER e 400 NORTH OLIVE MTREET, L.B. M1
- DALLAM.TEXAM 75201 s u.vR.ctruaurs May 29, 1984 TXX #4181 hhb is i
4
\\
Ml
]
- - + -
L Mr. John T. Collins Regional Administrator U.S. Nuclear Regulatory Commission, Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012
Dear Mr. Collins:
We have reviewed the Systematic Assessment of Licensee Performance (SALP) Board Report of Comanche Peak Steam Electric Station; Units 1 and 2 covering the period October 1, 1982 through October 31, 1983.
Based on this review we have no comments.
Sincerely, f b Y & ---
BRC:mse 8503220439 840622 PDR ADOCK 05000445 G
PDR A DIVINDON 09' TKKAN t'TELETERN KLKCTNir COMPANY m
.s...w.a.i.L'52E.u:Zaui. CXnul;
- a. ;..........::.a :;a.%'.uiu:;;au.AML '.,.' a,n
.e
/
UfelTED STATES f"
NUCLEAR REGULATORY COMMISSION 5
REGION IV 011 RYAN PLAZA DRIVE. SuffE 1000 ARLif0GTON.TEMAS 35911 IIAY 3 01984 In Reply Refer To:
Dockets: 50-445/83-49 50-446/83-23 Texas Utilities Electric Company AR N:
M. D. Spence, President, TUGC0
. Skyway Tower 400 North Olive Street Lock Box 81
. Dallas, Texas 75201 Gentlemen:
We have noted an error in the Systematic Assessment of Licensee Performance (SALP) Board report for Comanche Peak that was sent to you on May 14, 1984.
Please make the following correction:
Errata #2 to SALP Report 50-445/83-49, 50-446/83-23 Four undated pages marked as " ENCLOSURE 1 - NRR SALP EVALUATION," and a one page memo, dated February 6,1984, with subject: " Comanche Peak SALP," which immediately follow page 35 of the report, should be deleted by marking through them and referencing Errata #2.
Reason for Change The proper Enclosure 1 - NRR SALP EVALUATION, dated April 27, 1984, was transmitted with the report. A previous revision, noted above, was also included but is deleted by this errata letter.
Please make a note that our letter of May 22, 1984, transmitting an erratum to you will be referred to as Errata #1.
Sin e y
/
M
.H Johnson, Chief Reac or Project Branch 1
Enclosure:
As stated cc: See page 2 19 9
X f-S @ 96
w - ~ m. w - - _... __.
p o'
cc w/ enclosure:
Texas Utilities Electric Company Texas Utilities Electric Company ATTN:
B. R. Clements, Vice ATTN:
H. C. Schmidt, Manager President, Nuclear Nuclear Services Skyway Tower Skyway Tower 400 North Olive Street 400 North Olive Street Lock Box 81 Lock Box 81 Dallas, Texas 75201 Dallas, Texas 75201 3
l l
i i
_-,,_r--.-