dI crurs emh I
January 21, 1985 Soune ; Aff icanis' fill l
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION g y,g.,
- %RC BEFORE THE ATOMIC SAFETY AND LICENSING $0fRRMN -8 P3
- 25 In the Matter of
)
[0C TbGkkINif:[
)
BRANCH CAROLINA POWER & LIGHT COMPANY
)
AND NORTH CAROLINA EASTERN
)
Docket Nos.
50-400 OL MUNICIPAL POWER AGENCY
)
50-401 OL
)
(Shearon Harris Nuclear Power
)
Plant, Units 1 and 2)
)
1-3B 4i ADMITTED CONTENTIONS 9clty JOINT CONTENTION I (CANP 3)
The Applicants have not demonstrated the adequacy of their managing, engineering, operating and maintenance personnel to safely operate, maintain and manage the Shearon Harris Nuclear Power Plant as evidenced by their record of safety and perfor-
.mance'at their other nuclear power facilities.
A pattern of management incdequacies and unqualified and/or inadequate staff is likely to be reproduced at Shearon Harris Nuclear Power Plant and result in health and safety problems.
NUCLEAR REGULATORY COMMIS$10N Decket No 60- yon-o y
_ ny,;,;,, g,g, y,y (w g g 7 la the natter of A kt eta".u Af m AAn{ m,l fit /
GENTirlIDM
. $g39 EICEIVID spjihant-Inttrranet II>M' EEJEGIED Conrg Off'r_
acte 9'O contraster Ostr W'5 8-i.e., te r __ ' *B.__
B501110121 840905 PDR ADOCK OWXX)400
~\\
- 9 PDR
- --