Text
.
l WN-K@
EP Index DERGENCY PLAN PIOCEDURES INEEX Page 1 Rev. 47
- I, PEACH BOI'TCM UNITS 2 AND 3 12/12/84 *
,]
Review Rev. Revision Neber Title Date No.
Date e
i F
EP-101 Classification of Emergencies 11/06/84 10 H/06/84 EP-102
. Uhusual Event Response 09/15/84 9 09/15/84
{
EP-103 Alert Response 09/20/84 10 09/20/84 EP-104 Site Emergency Response 09/21/84. 10 09/21/84 f
EP-105 General Emergency rgse 09/21/84 10 09/21/84 l
. EP-110' Personnel Assenbly and Accountability 06/20/83 1 OG/20/83 j-EP-201-Technical Support Center-(TSC).
Activaticr1 10/12/84 7 10/12/84
[
EP-202 Operations Support Center (OSC)
Activation 10/13/84 6 10/13/84 i
EP-203 anergency Operations Facility (BOP)
Activation 10/12/84 7 10/12/84 1
i EP-203A Alternate Emergency Operations Facility (ECF) Activation 10/12/84 0 10/12/84 V
EP-205 DELETED 09/12/84 EP-205A Chemistry Sempling and Analysis Group 09/18/84 5 09/18/84 j
EP-205A Operation of Post Accident Mling
.1 Station 09/20/84 5 09/20/84 EP-205A Cbtaining Drywell Gas Seples
.2 from Containment A%re Dilution Cabinets 05/26/82 0 05/26/82 EP-205A Retrieving and Changing Sanple
.3 Filters and Cartridges from the Drywell Radiation Monitor During Emergencisa 04/25/83 1 04/25/83 I
EP-205A Obtaining Drywell Gas Sanples
.4 fran the Drywell Radiation Monitor Supling Station 05/25/82 0 05/25/82 EP-205A Obtaining Ifeactor Water Sanples
.5 fran Sanple Sinks Fbilowing Accident Conditions 05/25/82 0 05/25/82 y
EP-205A Obtaining Canal Discharge Water COETROLI.ED APPROVED COPY-VOID PREVIOUS ISSUE 8503180465 950110 DISTRIBUTION PER A-2 PDR ADOCK 05000277 F
4 t....
.i:$
e EP Index j.9 EMERGENCY PIAN PIOCEDURES IN!EX Page 2
' b.i -
d Rev. 47
- PEPCE BOMQ4 UNITS 2 AND 3 12/12/84
- if
' 1,i.;
Review Rev. Revision I.
Number Title Date No.
Date
..Q
.6 Sanples Follwing Radioactive Liquid
,5,.
Releases After Accident Conditions 05/25/82 0 05/25/82
~
s I::
EP-205A Obtaining the Iodine and Particulate
~
i': _
.7
.Sanples from the Main Stack and Boof H
Vents PblIming Accident Conditions 11/21/83 2 11/21/83 EP-205A Gataining Liquid Radwaste Samples
.8 fra Radwaste Sample Sink Follwing Accident Conditions 05/25/82 0 05/25/82 lR.
EP-205A Obtaining Sanples fra Condensate j
.9 Sanple Sink Follming Accident
- j. --
-Conditions 05/25/82 - 0 05/25/82 -
l.}.
EP-205A Obtaining Off-Gas Sanples from E
.10 the Off-Gas Hydrogen Analyzer E
Follwing Accident Conditions 05/25/82 0 05/25/82 EP-205A Sanple Preparation and Bandling
.11 of Highly Radioactive Liquid Sanples 02/29/84 2 02/29/84
,)
EPJ205A Sanple Preparation and Bandling
.12 of Highly Radioactive Particulate f
v Filters and Iodine Cartridges' 01/10/84 3 01/10/84 EP-205A Sanple Preparation and Handling of
.13 Highly Radioactive Gas Sanples 02/29/84 2 02/29/84 i'
.O EP-205A Offsite Analysis of High Activity l f.
.14 Samples 11/23/83 0 11/23/83 u
i i-EP-205A Guidelines for the Order of i'
.15 Analysis on Post-Accident Sanples 02/29/84 0 02/29/84 EP-205B Radiation Survey Groups 09/18/84 5 09/18/84
!l.;)
EP-205C Personnel Dosimetry Bionssay and
- ,i,.
Respiratory Protection Group 09/20/84 3 09/20/84 EP-206 DELETED
. 04/27/83 EP-206A Fire Fighting Group 01/10/84 6 01/10/84 EP-206B Dunage Repair Group 05/31/83 3 05/31/83 EP-207 Personnel Safety Team Activation 09/20/84 6 09/20/84 EP-207A Search and Rescue 04/13/83 3 04/13/83
- l V
i.
-.. - - - -.. - - - -~. -- ---. -. -.. ~ - - - ~ ~ ~
r--.
v--g- - -
g e
3
-c y
-gev
,-..e-
3a x
EP Inaex
~
DERGENCY PLAN PROCEDURE lS INEEK Page 3 L
Rev. 47
- ijl PEACEI BOFICM UNITS 2 AND 3 12/12/84
- ll g
Review Rev. Revision 4
Nunber Title Date No.
Date Q.
EP-207B DELETED 04/27/84 i
EP-207C First Aid 02/29/84 4 02/29/84 i'
{
EP-207D. Evacuation Assenbly Group 04/25/83 3 04/25/83 r I
. (f
- EP-207E-Vehicle and Evacuee Control-
~
~
~
Procedure 08/01/83 2 08/01/83 EP-207F Vehicle Decontamination Procedure 05/31/83 1 05/31/83
- ,;]
EP-208 Security Team 05/31/83 1 05/31/83
- EP-209
- Telephone List For Emergency Use
- 09/21/84-7- 09/21/84 p
EP-209 Immediate Notification Call List Appendix A 08/23/83 8 06/24/83 j
EP-209 DELETED 11/04/81
?
Appendix B d
EP-209-Peach Bottom Station Supervision Appendix C 09/21/84 13 09/21/84 d
O EP-209 Q1 Site Emergency Team amelars r
[
Appendix D-1 07/19/84 9 07/19/84 EP-209 Dose Assessment Team ii!
Appendix D-2 10/13/84 14 10/13/84 II
- i EP-209 Fire and Damage Team
- 4) ~
~ -- Appendix IF3-08/27/84 11 08/27/84
~
IF
~
Personnel Safety Team EP-209 q.;
Appendix D-4 12/12/84 15 12/12/84
- EP-209 Security Team l
Appendix D-5 10/12/84 9 10/12/84 4
- [
EP-209 Re-Entry and Recovery Team
]
Appendix D-6 08/23/83 3 04/11/83 EP-209 Technical Support Center Group Appendix D-7 09/15/84 13 09/15/84 bP-209 Chemistry ling & Analysis Team 09/20/84 0 09/20/84 Appendix IN EP-209 Cbrporate Emergency Team Leaders and y
Appendix E Support Personnel 01/10/84 10 01/10/84 6
-n-.
,,n e
,--s-y.
'[}_
-... -...-. ~..
- ~-
EP Index DERGENCY PLAN PROODDRES INEEX Page 4 Rev. 47
- PEACH BOMU4 UNITS 2 AND 3 12/12/84
- Review Rev. Revision Number Title Date No.
Date
(.
I EP-209 U. S. Government Agencies Appendix F 08/23/83 5 06/24/83 l
EP-209 Emergency Management Agencies Appendix G 08/23/83 3 04/11/83
~..
EP-209 Canpany Consultants Appendix H
.01/10/84 8 01/10/84 EP-209 Field Support Personnel 5
Appendix I-l 09/20/84 15 09/20/84 EP-209 Chemistry.E Health Physics Contractor l
Appendix I-2 Call List 12/07/84 13 12/07/B4
- i i
. Nesrby Public and Industrial Users
,l Appendix J Of Downstream Waters 08/23/83 5 06/24/83
~.
EP-209 Miscellaneous
-l Appendix K 08/23/83 6 06/24/83 EP-209 Iccal PECo Phones Appendix L 03/08/84 5 03/08/84 i
EP-209 DELETED 10/21/84
}
Appendix M EP-209 Medical Support Groups Appendix N 08/23/83 6 06/24/83
.i EP-209 Staffing Augmentation - 60 Minute
)
Appendix P Call Procedure 10/13/84 9 10/13/84
'i EP-210 -
Dose Assessment Team 09/18/84 1 09/18/84 EP-301 Operating the Evacuation Alarm and Pond Page System 12/23/82 1 12/23/82 4
N EP-303 Partial Plant Evacuation 06/20/83 2 06/20/83 EP-304 DELETED 12/04/81
~
EP-305 Site Evacuation 06/21/83 5 06/21/83 EP-306 Evacuation Of the.Information Center 05/25/82 2 05/25/82 EP-307 Reception and Orientation of Support Personnel 09/18/84 1 09/18/84 i,
.e
- - -.. ~
s m
y..,.,
--..y
---y-e y
-v,*
!p!
3.
EP Index a:.
DERGENCY PIAN PROCEDURES INDEDC Page 5 Rev. 47
- PEAG BCTFICM UNITS 2 AND 3 12/12/84
- it
.4 Review Rev. Revision
'i Number Title Date No.
Date d
U h'i EP-311 Handling Personnel with Serious y
Injuries, Radioactive Contamination f
hmare, or Excessive Radiation
?.l Exposure Emergency Director Functions 04/08/82 3 04/08/82 EP-312 Radioactive Liquid Release (Boergency Director Functions)
-09/20/84 2 09/20/84 j:
EP-313 Control of Thyroid Blocking (KI)
Tablets 09/20/84 1 09/20/84 EP-315 Corporate Computer Dose calm 1=tions 10/12/84 0 10/12/84 I
EP-316 Cumulative Population Dose il Palm 1 =tions 10/12/84 6 10/12/84 f
I EP-316 Worksheets/ Meterological r=1m1=tions jl Appendix A 11/08/84 7 11/08/84 i
EP-316 Decay Time Since Reactor Shutdown
)
Appendix B 10/12/84 6 10/12/84
}.
EP-316 Index of X/Q Outputs for Off-gas Appendix C Stack Releases 10/12/84 6 10/12/84 p'
C I
EP-316 Relative Dispersion Values for Emer-j.
Appendix D gency Dose Palmlation Procedure 10/12/84 6 10/12/84 I
EP-316 Percent Isotopic Abundance vs. Decay
[
Appendix E Time Since the Reactor Shutdown 10/12/84 6 10/12/84 t
EP-316 Population Distributin by r====
t Appendix F Sector - Sumer Day 10/12/84.
6 10/12/84 EP-316 I-131/I-133 Percent Abundance vs.
Appendix G Time Since Reactor Shutdown 10/12/84 6 10/12/84 EP-316 Iodince Source Term frca TCS Field Appendix H Data 10/12/84 6 10/12/84 EP-316A Reading the Rapid Dose Assess-ment I Program into the TI-59 10/03/84 1 10/03/84 EP-316B ralmlating Rapid Dose Assessment,on the TI-59 10/03/84 1 10/03/84 EP-316C Reading the Refine Dose Assessment I Program onto the TI-59 10/15/84 0 10/15/84 EP-317 Direct Recomendations to County
'y e
EP Index DERGENCY PIAN PROCEDURES INDEX Page 6 Rev. 47
- PEACE BOFICM UNITS 2 AND 3 12/12/84
- Review Rev. Revision Number Title Date No.
Date j
,i b
Bnergency Management and Civil Defense Agencies 10/12/84 3 10/12/84 EP-318 Liquid Release Dose em1m11ation Method for Intake Water at Downstream Facilities 04/13/83 1 04/13/83 EP-319 Liquid Release Dose Palmilation Method for Fish 04/13/83 1 04/13/83 EP-320 Procedure for I4aking Chlorine 03/12/82 1 03/12/82 EP-325 Use of the containment I-Radiation Monitor to Estimate -
I Palaae Source Term 06/09/82 0 06/09/82 EP-401 Entry for Emergency Repair and Operations 09/15/84 5 09/15/84 EP-500 Review and Revision of Emergency Plan (FSAR Appendix 0) 04/01/81 0 04/01/81 a
b i
4 i
1 1
l S
SM g
=*
g*
-... ~. -., -...
1 EP-209 CONTROLLED APPROVED COPY,
APPENDIX D-4 VOID PREVIOUS ISSUS Page 1 of 4, R,ev 15 DISTRIBUTION PER A-2 t
j
(
_..,y PHIIADELPHIA ELECTRIC CINPANY PEACH BC11'ICH UNITS 2 & 3 EP-209 APPENDIX D-4 PERSCtREL SAFEIY TEAM Personnel Safety Team Leader
'ii
}..
R. W. MacAllester m
I Alternate Persetmel Safety Team Leader Arthur Beward j
Interim Personnel Safety Team Leader Onshift Senior Tech. HP/C l
Interim Persmnel Safety Team Members Onshift HP's Search and Rescue /First Aid Group Leader Dick Sware
.b ase:m Alternate Search and Rescue /First Aid Group Leader J.h, C:~ rid Carl Koppenhaver R +:11 M%
Search and Rescue / Fir'st Aid Group Members
- ~
' George Menard Jerry Adams
[ {'
Phil Turturici (Alternate) n S
EP-209 APPENDIX D-4 Page 2 of 4, Rev. 15
" [U.l :..,., e, 3.1 y.;.- @ )v.;.;.,\\e.., $ ;5 U.,_,
David Grove
.; y c.
?2
., s
.......n.-. :
a W.N. ;y.~ -
.1-0,2..
l 3.p;y,C'c 0,...
1, N 4 % >.?
Dobert Bickhart 4
.i. ; y -.
u l. ? F.q e g,a".u';>. c
~,,,
a
..s M..y1n.w. g.
!..r /,?,,
John Sarsfield M
t
.s'
-7,:
... -,~.s.
c.
h.! ff'... If ' d, b IN ' 'n Scott Yt.lill i.
e
.v
.. p 5. g s<
.s b.*
... y ; '.
.. {t
'w f
g:. ;~.g;g f. 2 T.,. [d b ' - (..J df Mike Ficchi
- f. "%;.
t..~ '. "., v.. W..... :"q_._
}.f:/jy
- 2 Debbie Perrine
.. ' O. D.. ~.
p.
k!). $, i.l. [k,,w"*j, [..
v-e
(,",, '.. [- ' :
x.y.
~ g. % <.
p
+.
. s 3
..(.
..:w
- c.
..~
- T;.,'.,. ; _,d, y
a, Q:ey,:, % 'f.'J..'." ">: m ;..
. f /;.?o s^.
Plant Survey Group Leader y
nt
< ( q,_.,,
+.
p.
- ..-
- .... +..
1 Steve Grosh
- 4. : le. '.. ' ' ~. 8..*.
.V. -
~- 7.c.
? -
1 -[',
L' s.
- s k-'_'.<*,? ', ' ' ' ;* ~ l.
,'*l'
.?/. -
- r ;e
..y.-.',- h'i 'u,.
- y
- l., c.)
. 9 3 g'n.. 'e;
- ;., s..;
' ' L.?, '.,,
~;., f,..M n.4:9.'. '.S j'.l4.f.*'...
Alternate Plant Survey Grouc Leader a:m
. %.....g pw.... s g s...
.....s
..v.
.. e
.. h, n.c l,bf. ;:.M.". ".'i.s -.../:,(I'.'.,,y 'E.
I $O Glen Faden 7-n-
+
IJc]T.'lg:. p_.; 2.7 N ': *<.:..- j %
Jh. i: ^ '
s y-
- y--,.,
?.v h.[.g l Ql]o :
Plant Survey Group Members 1 ".. ).4 ;.9. ;;1p
,.p Q- (.$p,.._
r.,.
n.
4, & ',%.,,'% [$.. '<.:.N. ';-j T. Hoopes
-..r
- ..c -;.7 wsy --
..QJ#......,Z ". 7.:.:. J'M,..
a
- 1..
Tcm Albright
,t. *,-
',W
<g.:y...:;. n. '.- m,.. : 1
-.p,.<:. '
1 /..JWf., i "s.yf T.[ Q ~.[ l j.f,,.[.. n[
~
Craig Hoffmaster
, y m.k..,;
c-
..e
..',8.y--
..ef-3-
'0
.. 4-e
_,.my...,,,,,,. _.
e
.n.
j Joe Volz W Ml:;., C *.,
s pj;.
,y.[
'y. y,,1l!RY:y., 2,.L..%.:..... [
1 3
.4-.
l Steve King
.q.47%. e ~
. v %_,
h Todd Fleischmann NYT. N.11.- ', U,. 'f ;." o, c h l
5 % ~..: ? s f : } '. ^. ' :.?.R,'. 3. '"fg
...U.. r..a.
George Glessner
." 1
. O.!
i<
. s :.,.,. 4.. '3r.,
v-
'(. d 4'g
,-+s.
, '. ~ % g.
~+.$9%;:<.::..) ~'
!,_O: ' l.L
- Gary Fay
,v-l l.g :/if l.? q.
c-w s.
. f:
v-s-
y.
z h.f:(fy',f5) ) O 5, [? jo 'l Terry Reisinger
%%;gg 'J;.. 6 UM ~ ~j f A '..,
f ';..Q _
s.
Tim KirkPatrick l
- ~
l l
i l
Evacuation Assembly Area Group Ieader Scme Phone Centrex x
.s.
d.
. '.e
[
'- g
.: ;_ n. a.
s ;; y,:;.a
... r:
- .-a ;. ll :,. ' _ '__ - z. %F ' :" * *, ' *
~
w l
o a
l.
i..p.....
l EP-209 APEDIDIX D-4
+
l-Page 3 of 4, Rev. 15 D
i '.
l Alternate Evacuation Assenbly Group Imader i
/
l-f D. Preston f
N ll
/ Evacuation Assenbly Area Group Members it i
0 Jack Purcell l'
.g 1'
J. D. Chronister
[d C. E. Mareino E. K. Tucke'r M. N. Sunday
~ ' 1N 4
sp2 I'.
YGr&
).
Personnel Dosimetry, Bioassay, Bame Phone Centrex iggm m
l.
Respiratory Protection Group is
[
d bbX raaaars (*) and Menbers
- n.
- D. Barron b
. pY
\\
D. Rockwell
'E :7-1 A. Kahler
- 2g l
L'E'~'t j
\\C.Tarbert v..au.
l 12E'C'
, J. Schnetzka
.cM i
l l F. Snowden
'2 D I
. R. Wright I
h.
\\
j '.
l l
\\..
/
$ 9.
V
)
l T
(
D
.l i
l l.
l
'O, W
EP-209 APPENDIX D-4 Page 4 of 4, Rev. 15 1
t v
c Health Physics Data Takers for Personnel I
And Dose Assessment Team
. s.
- c. y c.".:
4,,
l R. N. Bishop
. ;T,4 a w,i : QW j ".JP
.j
- .7 s
- .... -. ;...-, % n..
- r
,.. v.u-F. J. Volz, Jr.
f.jf T '.;...'.
..P iy.'q.-7:$, '
_f = 'N,.
i 4
,f y; f j.(( h, ^;- [ (i
/ 7]);
R. D. Nixon
. i; ~: - :
.8 Q. t; < -
- . g ^,..Q
- L w
~
M. E. Freed
- p J %.
rf ;f.
-, ;. s ' O;.
- ..g,,;u,.
a.,.
..s n
3,.
.. g (.;[ l.,.].g.
R. L. Workinger I l7...,;
e.
j
~.
L. M. Shull M fl. X;W..
.4 I YC
.y.
7.
.-c.
"'i,--
..,.s
- .e3 a
^ ' ' '
- l.,.
]
q _.-
[1
(
D. M. Arnold w;" vf :? ' -_' '. ',.,*
- 4. x7 f. '....i,_
.. -.. - - c
- n
,:... A...
x y...
E. N. Wilson E f 1Jl A 7 4,S/ 5 ^.4. D n w._ M_.
-.m
/., ". % + ^.
? ?.Y _..f[.. g.,
=.:.h..[ ; ~. '.. Mity.
if:
K
)',"7..U.
D. E. Kern j
4 y
.e n
R. M. Schenning
,[;.,/.3.-*iE ;-l'i: 1.7,fl @ Q,s to
.,...r. g.-
y-y,,
e
.. a.
L. E. Bostetter, Jr.
c../ %
^;.
. '.: fW.-'
e.
- . j..-
i.'-
~ L c.'-: c,,sy t
,. s, e
.n; A. R. Perry
, a,. '...
-4,,# sci #' - ; -., -.;,.,
-#. (.-
N sg
,~.*y.'m
?L..
I
.'?.,'
- ,~,.
~
J. J. Cmmiskey
.c r-
< ?.. ; ';. " W. 7;., '.. r J '.
., -.',' T q.
j t..,
.~. T. a.. s %..
T. L. Deneen, Jr.
' $. ' '.. ^.... I.
J' c.
l:
t
.s
+ -
- s.<
,-l
.q M. E. Shuler t.. 3-
+.
.;...,,..... e, -. x,..
D. D. Pendleton, III
,?.l'..f ^ ;;., 6. f (. - M.
.,y.-.-
..,...., 7.,,..y w
.M A...
. - - 3
.s,.
..a.
+
~.
vn..
B. V. Townsend
- +.'.. -..
- .~-
A*.' W,:
', ': l..
- :..,vy_..
. J, '. y' '
m u...
W.
L M. M. Waters
,.1 + " C...,/. ; L. ~.; '. 3
-. ~
v
.y._,
~
c A....e
.. c....-
y,,
I Secretaries
.V.;" : i j, y. - :: +.,;m.
.: n..-
!;l t '-
l
..r
,....,...~..
[. c j.m ~,.. '.
vf.
2 Required l
.,.3.,.
4,
- .. e.
'. : c'. r -
- - -w
..... c
,.s
,.e.,...,s e.
J. Franan Jr'. Stenographer 4 ' <.:
2 J
.h _......": '.. g. J,:. !;.h Y.}.
- ~
t.j:=
.. e,
-.s A. hney Typist gf,. fi,, 3 g. g.
-' T ;, +.. ; i.
- ik 0
b
\\
1 1
\\
l6
\\
1 '
l
f'".
4-i EP-209 I
APPENDIX I-2 l
.CONTHOLLED APPR07ED. COPY.
Page 1 of 1, Rev. 13 70ID PREVIOUS ISSUE
= cB
,I C
DISTRIBua...d PER A 2 l:
l-_ _
PN89
_ -C -
}
PEACH BOFICH UNITS 2 & 3 t-r I
EP-209 APPENDIX I CHEMISTRY AND HEALTH PHYSICS CONIRACIOR CAIL LIST
/emistry (Rad Services f
Ch Inc.)
[
1 i
i l.Crowe,D.
[
. Casey, J.
, Chase, D.
Gasper, J.
/
F Ieone, B.
Miller, T.
Howell, S.
Sarge, R.
I Pittsburghf PA Office 500 Pern Center Blvd.
"F 4
Rad Services Pittsburgh, PA 15235 I
4 i
L ',
i Health Physics (Bartlett Nuclear, Inc.)
i I
F-c.
Ipolettai D.
'q Kiman, B..
Smidga, R.
3-p-
i Rogers, W.
'F
< Chrostowski, J.
, Buckley, Bob
, DiPersio, Mike -
Gabreath,-Chris '
Galbreath, Iouise Jaccbs, Steve.---
u-Jones, Bobert -
- Nelson, Norm Sergent, Gene Sergent, Pam ~
'Zacharias, Ames Wride, Lanny i
(Plynouth t% :lfice *'*
Plymouth Industrial Park P.O. Box 810 10 Aldrin Rd.
'u Plymouth, !% 02360 i
I e
I
-]
y em s
'cy,
UNITED STATES
~ #8 NUCLEAR REGULATORY COMMISSION o
{
WASHINGTON. D. C. 20555 r,
f March 8, 1985 o
50-277/278 Peach Bottom MEl40RANDUM FOR: Chief, Document Management Branch, TIDC FROM:
Director, Division of Rules and Records, ADM
SUBJECT:
REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division of Rules and Records has reviewed the attached document and has determined that it may now be made public1 available.
/
. M. Felton, Director
'//[
ivision of Rules and Recor Office of Administration
Attachment:
As stated l
l e
e
.