ML20112A691

From kanterella
Jump to navigation Jump to search
Rev 10 to QA Program Description & Const Phase,Consisting of Revised Table 1 Re ANSI Std & Reg Guide Compliance
ML20112A691
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/01/1985
From:
HOUSTON LIGHTING & POWER CO.
To:
Shared Package
ML20112A688 List:
References
NUDOCS 8503180420
Download: ML20112A691 (2)


Text

i Attachment

^

ST-HL-AE-1201

' File #: G9.11/Q39 Y-

C PART A HOUSTON LIGHTING AND POWER COMPANY

. QUALITY-ASSURANCE PROGRAM DESCRIPTION s

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION t

w REVISION 10 D' ATE March 1, 1985'

.i

+,

f f

f'

~

s 5

r a

e

'f M'228882818886 A

pg

".a :

4.

I t

I

'P, p

TABLE 1-

-ANSI STANDARD AND REGULATORY GUIDE COMPLIANCE

?}h

'I.:

. (continued).

..q.

33. ANSI N45.2'.12-1977, Section 1.3 states, "In no way shall the performance of

. audits.by an organization diminish the responsibility of the audited Jorganization or contractor for audit of his designated portion of the R9 quality-assurance program or the quality of his product or services". For the' South. Texas Project all-quality related activities implemented for the South Texas Project are audited annually at a minimum, or at least once

~

- within'the life of the activity, whichever is shorter. These audits are

-performed by either HL&P, BEC,'or ESI Quality Assurance personnel.

34. ' As an alternate, compliance with ANSI N45.2.6-1978 and R. G. 1.58 (Rev.-1,

~

R 10 9/80) in its entirety is acceptable.

t

. y 7,.,

x

,1

k w

- r

? 'V'

'., ^,,

s.

> o qc

~

\\

i.w.

t

-1 Table 1-9

,