OPERATING DATA REPORT j
DOCKET NO. 50-341 -
COMPLETED BY H. B. Giles I
DATE May 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS 1.
Unit name: Fermi 2 NOTES: (1) Calculated using weighted i
averages to reflect variations in rating (MDC and DER). (2) Currently limiting power to 96%
2.
Reporting period: April.1996 CTP maximum due to turbine limitations -
3.
Licensed thermal power (MWt): 3430 Nameplate and DER ratings reflect 98% CTP 4.
Nameplate rating (Gross MWe): 1179 due to turbine throttle valve limitations.
'5.
Design elect rating (Net MWe): 1116
- 6.
Max dependable cap (gross MWe): 924 7.
Max dependable cap (Net MWe): 876 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (MWe Net):
(2)
- 10. Reasons for restriction, if any:
(2) l THIS MONTH YEAR TO CUMULATIVE
'DATE 11.
Hours in reporting period 719 2.903 72.493 12.
Hours reactor was critical 244 2.315.5 50.667.1 13.
Reactor reserve shutdown hours 0
Q Q
14.
Hours generator on-line 191 2
_2.268.2 47.904.5
. Unit ' eserve shutdown hours 0
Q Q
l 15.
r 16.
Gross thermal energy gen (MWH) 606.192 7.332.744 146.943.947 17.
Gross elect energy gen (MWH) 166.490 2.040.580 47.431.097 1
18.
Net Elect energy gen (MWH) 156.998 1.942.196 45.307.665 l
19.
Unit service factor 27.4 78.1 66.1 20.
Unit availability factor 27.4 78.1 66.1 l.
21.
Unit cap factor (using MDC net) 24.9 76.4 59.9 (1) 22.
Unit cap factor (using DER net) 19.6 59.9 56.7 (1) 23.
Unit forced outage rate 72.6 21.9
_2). 4
- 24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sept. 27.
l 1996. 52 days i
- 25. - If shutdown at end of report period, estimated date of startup:
- 26. Units in test status (prior to commercial operation):
i FORECAST ACHIEVED i
Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A E!/A l
9605210351 960515 PDR ADOCK 05000341 R
AVERAGE DAIL4Y UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fermi 2 DATE Mav 15.1996 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 Month Anril.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) j 1
0 16 0
2 0
17 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 15 8
0 23 488
)
9 0
24 817 10 0
25 836 11 0
26 874 t
l 12 0
27 876 l
13 0
28 876 14 0
29 877 l
15 0
30 876 l
l l
l
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-341 DATE May 15.1996 UNIT NAME Fermi 2 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 REPORT MONTH April.1996 No. (6)
Date TYPE Dur(Hrs)
Reason (2)
Method of -
LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code Prevent Recurrence reactor or (5) reducing power (3)
S96-01 960327 F
413.4 B
2 96-005 BI TK Tech Spec required shutdown due to both divisions ofEECW being declared inoperable.
S96-02 960419 F
108.4 B
2 96-007 BJ PC LER 96-007, During unit startup HPCI and RCIC declared inoperable, Tech Spec required BN TURB shutdown. Unit restarted SEAL 04/22/96.
R96-03 960424 S
(7)
H 5
N/A AA ROD Post outage 96-01 control rod pattern adjustment to obtain new 96% CTP rod line.
(1)
F: Forced (2)
REASON:
(3) METHOD:
(4) Instmetions for preparation of data entry S: Scheduled A - Equipment Failure (Explain) 1 - Manual sheets for Licensee Event Report (LER) file B - Maintenance or Test 2 - Manual Scram (NUREG-1022)
C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4)
E - Operations Training and License 5 - Reduced Load Examination 9 - Other (6) R - Prefix indicates power reduction.
F-Administrative S - Prefix indicated plant shutdown.
G - Operational Error (Explain)
H - Other (Explain)
(7) Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.