ML20112A259

From kanterella
Jump to navigation Jump to search
Submits Completion of Current Order Timing Mods & Trace Surveillances,Per GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Assemblies
ML20112A259
Person / Time
Site: McGuire, Mcguire  
Issue date: 05/13/1996
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, NUDOCS 9605200445
Download: ML20112A259 (1)


Text

..

L.

ll l

  • DukehiverCornpany T. C McMaxs McGuire Nuclear Generation Deparonent Vice hesident 12700Hogers FenyRoad(MGolW)

(704)8754800 i

i Huntersville, NC28078B985 (704)8754809 Fax l

' DUKEPOWER May 13, 1996

'U.

S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C.

20555 i

(

Subject:

McGuire Nuclear Station Docket Numbers'50-369 and 50-370 Generic Letter 93-04 " Rod Control System Failure and Withdrawal of Rod' Cluster Assemblies" Completion of Current Order Timing Modifications and l

Trace Surveillances Gentlemen:

By letter dated February 23, 1995, Duke Power Company committed to implement a current order timing modification and a current order trace surveillance at McGuire Nuclear Station during the end-of-cycle 10 refueling outage for each unit.

These modifications and trace surveillances were completed during 1EOC10 and 2EOC10 refueling outages.

If you have any questions concerning this notification, please contact Randy Cross at (704) 875-4179.

l Very truly ours, i

T.

C. McMeekin l

xc:

Mr. S. D.

Ebneter Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta St.,

NW, Suite 2900 Atlanta, Georgia 30323 Mr. Victor Nerses U.

S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 1

One White Flint North, Mail Stop 9H3 Washington, D. C.

20555 Mr. George Maxwell Senior Resident Inspector McGuire Nuclear Station I

I@3D o

200109 9605200445 960513' PDR ADOCK 05000369 P

PDR i_

-