OPERATING DATA REPORT
=
, s.
t /:',".pr ~-
.7.' ~,, ':. f ' J.,.,
. ? DOCKET NO.
50-263______
A DATE 1 2-5-84____
.y,.
COMPLETED BY A. L. Myrabo
, TELEPHONE 612/295-5151
.' OPERATING STATUS INotes i
- 1. Unit Name : ________________________Monticelto 1
1
- 2. Rcporting p,eriod: ___________________ JANUARY I
1
- 3. Li' censed Thermal Power (MWt):
____________1679 1
'4. Nameplate Rating (Gross MWe)-
569 1
I
- 5. D3 sign Electrical Rating (Net MWe): _____545.4 l
I
- 6. Maximum Dependable Capacity (Gross MWe): __564 l
.I
- 7. Maximum Dependable capacity (Net NWe): ____536 1._________________________t
- 8. If. Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __ Low pressure turbine wheels removed in 1982 were rep lac ed in the 1984 refueling outage..Capaci,ty ret,urned to' normal _____
- 9. Power Level To Which Restricted,'If Any (Net MWe):
___N/A_______;
- 10. Roasons For Restrictions. If Any: __N/A_____________________________________
This Month
~Yr.-to-Date Cumulative it. Hours In Reporting Period
_____744
_____ 744
____119137
- 12. Number Of Hours Reactor Was Critical
___318.5
___ 318.5
__ 90233.9
- 13. Reactor Reserve Shutdown Hours
_____0.0
______0.0
_____940.7
- 14. Hours Generator On-Line
___253.6
___ 253.6
__ 88256.6
- 15. Unit Reserve Shutdown Hours
_____0.0
______0.0
_______0.0
- 16. Gross Thermal Energy Generated (MWH) 340243 340243
_i4i574057
- 17. Gross Electrical Energy Generated (HWH) __116437
__ 116437
__45301490
- 18. Nat Electrical Energy Generated (MWH)
_,109297
__ 109297
__43284180
- 19. Unit Service Factor
__ 34.1%
___ 34.1%
____ 74.1%
- 20. Unit AvailablLity Factor
'__ 34.1%
___ 34.1%
____ 74.1%
- 21. Unit Capacity Factor (Using MFC Net)
__ 28.0%
___ 28.0%
____ 69.2%
- 22. Unit Capacity Factor (Uring DER Net)
__ 27.5%
___ 27.5%
__~;. 68.0%
- 23. Unit Forced Outage Rate i.6%
1.6%
5.3%
- 24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
- 25. If Shut Down At End Of Report Period. Estimated Date Of Startup:____________
- 26. Units In Test Status (Prior,to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY
~~~~~~~~~~~~~~~#3 COMMERCIAL OPERATION
~ ~ ~ ~ ~ " _ _ ~
~~~~~~~~
bp.
8503150289 850131 PDR ADOCK 05000263 R
PDR lg
N '. '.
HARRATIVE
SUMMARY
OF OPERATING EXPERIENCE
\\
DOCKET NO.
50-263______
DATE 2-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JANUARY 1-1-85 Continuation of 1984 refueling outage.
to 1-14-85 Reactor critical for startup physics testing i-17-85 1-19-85 Generator on-line at BOC-ti.
Generator off-line.
Turbine trip on high reactor water Level.
Generator on-Line for overspeed test warmup.
1-20-85 Generator off-line for turbine overspeed test.
Generator on-Line.
Power operation.
Reactor subcritical, generator of f-line for miscellaneous 1-26-85 maintenance.
1-27-85 Generator on-Line.
Power operation SPENT FUEL STORAGE UPDATE 484 Fuel assembL'les in core 1024 Fuel assemb Lies in spent fuel storage pool 2237 Licensed capacity Date of Last refueling that can be 1994 discharge with present capacity f
Note: Power operation defined as essentially 100% of rated power except for weekend load draps for
- specified survellLance testing.
l
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-263_____-
UNIT honticelto-_
DATE 2-5-84____
COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 5
(MWe-Net)
(MWe-Net) 1 17
~5_______-____
--________-6____________
18
-9_--_________
3
_____-____-4___-________
19 6____________
4
-5____
20
___-______213________-___
5
-4____________
21
__________378__-_________
4
-5_'__-__-_____
22
___-_____' 453____________
7
_7___-________
n3
_______-__53o_____________
8
-9.--_____-___
24
______--__504.______-____
o
-6___-________
25
--________546____________
10
-6____________
26 64____________
11
-3__-_____--__
27
-5____________
12
-4____________
28
__________310____________
13
-4____________
29
_-________527____________
14
-4____-__-____
30
__________5s"i____________
15
-4_-____,__-__
3i
__________555____________
i6
_____. ____,5.___________
INCTRUCTIONS On this format, tirt the average daily unit power levet in MWe-Net for each day in-the reporting month.
Compute to the reatest whole megawatt.
DOCKETNO. 50-263 UNIT'SilUTDOWNS %ND POWER REDUCTM)NS UNIT NAME lkintfrelin D A TE '2,5 nX COMPLETED gy "A.
Lr Myrmhn REPORY MONiil _ January TELEPHONE 612 / 29 s-si si
~
e.
i 5
5; "g
3 [Q Liccasce
$-r, h
Cause & Currectise
's E 4
jg5 Ewtw i?
E,1 Atti.m eu,.
N.,
Date j
y y 3, =
Repsut =
mO
,5-Prevent Recurece,wc j
t a
d 2('84) 2-3-84 S
446.6 C
4 N/A ZZZZ ZZZZZZ Continuation of 1984 refueling outage 1
1-19-85 F
4.1 A.
4 N/A HA TURBIN Turbine-generator trip on reactor high water level (no reactor scram) 2 1-20-85 S
1.7 5
4 N/A -
HA TURBIN Generator off-line for turbine over-s apeed test 3
1-26-85 S
38.1 B
1 N/A ZZZZ ZZZZZZ Generator of f-line for seiscellaneous maintenance outage 1
1 1
i 2
3 4,
F: Forced Reason.
Method:
, E= hits: G. instesntions 5: Scheduled A Equipmens Faikne(Explaint I Mammal f.w Preparation id Data 341sinnenance at Test 2 Manual Scram.
Entry Sheels for Licensee l
C. Refueling 3 Astonistic Stsais.
Ewas Report (LERI Fde IN'UREG-D Regulatewy Resteission 4-Oeher (Emplaia) 01613 E-Opesator Traininsa Lkense Essminaikm 5
F Adniinistraitwe i Exhibis 1 Saaw S awee
, G Operzekanal EnsurIExplaint r8!U)
Il Oeher (Esplahi) i e
2-Northem States Power Company
)
414 N' Collet Mal' Minneapohs M.nnesota 55401 Teesnome f512 330 5500 I
February 11, 1985 Director, Office of Resource Management U S Nuclear Regulatory Comission
'iashington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report January, 1985 Attached are twelve copies of the Monthly Operating Report for January, 1985 for the Monticello Nuclear Generating Plant.
D d k w.
David Musolf Manager of Nuclear Sup-rt Services DMM/le cc:
Regional Administrator-III, NRC
~' '
NRR Project Manager, NRC NRC Resident Inepector MPCA Attn: J W Ferman l