Monthly Operating Rept for Jan 1985
ML20111C178
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/31/1985
From: Musolf D, Myrabo A
NORTHERN STATES POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8503150289
Download: ML20111C178 (5)


Text

f v

OPERATING DATA REPORT

=

, s.

t /:',".pr ~-

.7.' ~,, ':. f ' J.,.,

. ? DOCKET NO.

50-263______

A DATE 1 2-5-84____

.y,.

COMPLETED BY A. L. Myrabo

, TELEPHONE 612/295-5151

.' OPERATING STATUS INotes i

1. Unit Name : ________________________Monticelto 1

1

2. Rcporting p,eriod: ___________________ JANUARY I

1

3. Li' censed Thermal Power (MWt):

____________1679 1

'4. Nameplate Rating (Gross MWe)-

569 1

I

5. D3 sign Electrical Rating (Net MWe): _____545.4 l

I

6. Maximum Dependable Capacity (Gross MWe): __564 l

.I

7. Maximum Dependable capacity (Net NWe): ____536 1._________________________t
8. If. Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: __ Low pressure turbine wheels removed in 1982 were rep lac ed in the 1984 refueling outage..Capaci,ty ret,urned to' normal _____
9. Power Level To Which Restricted,'If Any (Net MWe):

___N/A_______;

10. Roasons For Restrictions. If Any: __N/A_____________________________________

This Month

~Yr.-to-Date Cumulative it. Hours In Reporting Period

_____744

_____ 744

____119137

12. Number Of Hours Reactor Was Critical

___318.5

___ 318.5

__ 90233.9

13. Reactor Reserve Shutdown Hours

_____0.0

______0.0

_____940.7

14. Hours Generator On-Line

___253.6

___ 253.6

__ 88256.6

15. Unit Reserve Shutdown Hours

_____0.0

______0.0

_______0.0

16. Gross Thermal Energy Generated (MWH) 340243 340243

_i4i574057

17. Gross Electrical Energy Generated (HWH) __116437

__ 116437

__45301490

18. Nat Electrical Energy Generated (MWH)

_,109297

__ 109297

__43284180

19. Unit Service Factor

__ 34.1%

___ 34.1%

____ 74.1%

20. Unit AvailablLity Factor

'__ 34.1%

___ 34.1%

____ 74.1%

21. Unit Capacity Factor (Using MFC Net)

__ 28.0%

___ 28.0%

____ 69.2%

22. Unit Capacity Factor (Uring DER Net)

__ 27.5%

___ 27.5%

__~;. 68.0%

23. Unit Forced Outage Rate i.6%

1.6%

5.3%

24. Shutdowns Scheduled Over Next 12 Months (Type, Date, and Duration of Each)
25. If Shut Down At End Of Report Period. Estimated Date Of Startup:____________
26. Units In Test Status (Prior,to Commercial Operation): N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY

~~~~~~~~~~~~~~~#3 COMMERCIAL OPERATION

~ ~ ~ ~ ~ " _ _ ~

~~~~~~~~

bp.

8503150289 850131 PDR ADOCK 05000263 R

PDR lg

N '. '.

HARRATIVE

SUMMARY

OF OPERATING EXPERIENCE

\\

DOCKET NO.

50-263______

DATE 2-5-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JANUARY 1-1-85 Continuation of 1984 refueling outage.

to 1-14-85 Reactor critical for startup physics testing i-17-85 1-19-85 Generator on-line at BOC-ti.

Generator off-line.

Turbine trip on high reactor water Level.

Generator on-Line for overspeed test warmup.

1-20-85 Generator off-line for turbine overspeed test.

Generator on-Line.

Power operation.

Reactor subcritical, generator of f-line for miscellaneous 1-26-85 maintenance.

1-27-85 Generator on-Line.

Power operation SPENT FUEL STORAGE UPDATE 484 Fuel assembL'les in core 1024 Fuel assemb Lies in spent fuel storage pool 2237 Licensed capacity Date of Last refueling that can be 1994 discharge with present capacity f

Note: Power operation defined as essentially 100% of rated power except for weekend load draps for

  • specified survellLance testing.

l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-263_____-

UNIT honticelto-_

DATE 2-5-84____

COMPLETED BY A. L. Myrabo TELEPHONE 612/295-5151 MONTH ______ JANUARY DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL 5

(MWe-Net)

(MWe-Net) 1 17

~5_______-____

--________-6____________

18

-9_--_________

3

_____-____-4___-________

19 6____________

4

-5____

20

___-______213________-___

5

-4____________

21

__________378__-_________

4

-5_'__-__-_____

22

___-_____' 453____________

7

_7___-________

n3

_______-__53o_____________

8

-9.--_____-___

24

______--__504.______-____

o

-6___-________

25

--________546____________

10

-6____________

26 64____________

11

-3__-_____--__

27

-5____________

12

-4____________

28

__________310____________

13

-4____________

29

_-________527____________

14

-4____-__-____

30

__________5s"i____________

15

-4_-____,__-__

3i

__________555____________

i6

_____. ____,5.___________

INCTRUCTIONS On this format, tirt the average daily unit power levet in MWe-Net for each day in-the reporting month.

Compute to the reatest whole megawatt.

DOCKETNO. 50-263 UNIT'SilUTDOWNS %ND POWER REDUCTM)NS UNIT NAME lkintfrelin D A TE '2,5 nX COMPLETED gy "A.

Lr Myrmhn REPORY MONiil _ January TELEPHONE 612 / 29 s-si si

~

e.

i 5

5; "g

3 [Q Liccasce

$-r, h

Cause & Currectise

's E 4

jg5 Ewtw i?

E,1 Atti.m eu,.

N.,

Date j

y y 3, =

Repsut =

mO

,5-Prevent Recurece,wc j

t a

d 2('84) 2-3-84 S

446.6 C

4 N/A ZZZZ ZZZZZZ Continuation of 1984 refueling outage 1

1-19-85 F

4.1 A.

4 N/A HA TURBIN Turbine-generator trip on reactor high water level (no reactor scram) 2 1-20-85 S

1.7 5

4 N/A -

HA TURBIN Generator off-line for turbine over-s apeed test 3

1-26-85 S

38.1 B

1 N/A ZZZZ ZZZZZZ Generator of f-line for seiscellaneous maintenance outage 1

1 1

i 2

3 4,

F: Forced Reason.

Method:

, E= hits: G. instesntions 5: Scheduled A Equipmens Faikne(Explaint I Mammal f.w Preparation id Data 341sinnenance at Test 2 Manual Scram.

Entry Sheels for Licensee l

C. Refueling 3 Astonistic Stsais.

Ewas Report (LERI Fde IN'UREG-D Regulatewy Resteission 4-Oeher (Emplaia) 01613 E-Opesator Traininsa Lkense Essminaikm 5

F Adniinistraitwe i Exhibis 1 Saaw S awee

, G Operzekanal EnsurIExplaint r8!U)

Il Oeher (Esplahi) i e

2-Northem States Power Company

)

414 N' Collet Mal' Minneapohs M.nnesota 55401 Teesnome f512 330 5500 I

February 11, 1985 Director, Office of Resource Management U S Nuclear Regulatory Comission

'iashington, DC 20555 MONTICELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Monthly Operating Report January, 1985 Attached are twelve copies of the Monthly Operating Report for January, 1985 for the Monticello Nuclear Generating Plant.

D d k w.

David Musolf Manager of Nuclear Sup-rt Services DMM/le cc:

Regional Administrator-III, NRC

~' '

NRR Project Manager, NRC NRC Resident Inepector MPCA Attn: J W Ferman l

Attachment i

p gbF e

bb~~

Cedp

'b 1

_ _. _ _ _