ML20108F151
| ML20108F151 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 12/10/1984 |
| From: | Bitter D GENERAL ELECTRIC CO. |
| To: | Leech P Office of Nuclear Reactor Regulation |
| References | |
| MFN-167-84, NUDOCS 8412190065 | |
| Download: ML20108F151 (1) | |
Text
_ _ _
GENER AL $ ELECTRIC o
NUCLEAR POWER SYSTEMS DMSION MC682,(40D'Dd-T5$
- "' """ " ^"' * ^" # $.$^_ g4 December 10, 1984 U. S. Nuclear Regulatory Comission Office of Nuclear Reactor Regulation Washington, D.C.
20555 Attention:
Paul H. Leech, NRC Project Manager Pilgrim Nuclear Power Station Gentlemen:
SUBJECT:
SAFETY ANALYSIS REPORT FOR PILGRIM SPDS General Electric Company, " ion Emergency and Plant Informa-
References:
1)
Safety Analysis Report for the Pilgrim Nuclear Power Stat tion Computer (EPIC) Safety Parameter Display System (SPDS)",NEDC-30641 TeleconbetweenD.$. June 1984 Bitter (GE)andL.Beltracch 2) on December 4, 1984 The purpose of this letter is to document that GE gives permission to sumarize selected portions of Reference 1 to facilitate tha NRC Staff's completion of verbally in a telecon between Leo Beltracchi)and myself (Reference 2).This permission theassociatedSafetyEvaluationReport(SER.
It is necessary for the Staff to reference the material in question to substan-tiate their conclusions on data validation.
The portions of Reference 1 which areacceptabletouseintheStaffSERareincludedinSections3.3.6(page13),
4.1.3(page21)and4.6(page32).
Ifyouhaveanyquestionsontheabove,pleasecontactmeon(408)925-4656.
Very truly yours, a on Dave Bitte ng Engineer 3WR Systems Licensing Nuclear Technologies and Fuel Division DB:rm/A12067 y
g k
J. E. Benson ( ) )
\\g L. Beltracchi RC cc:
P. Kahler (bet, l\\
C.H.Minott(8Co)
W.J.Roths(GE) 66 C. M. Schroder (GE)
Af ok2gfo@
d p