ML20108E728

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Changes,Revising Page 3/4 10-1 to Allow Reactor Trip Verification Interval of 7 Days Instead of 24 H Prior to Reducing Shutdown Margin Below Tech Spec Limit
ML20108E728
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/26/1985
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML20108E716 List:
References
NUDOCS 8503120290
Download: ML20108E728 (2)


Text

,.

3/4.15 SPECIAL TEST EXCEPTIONS SHUT 00WN MARGIN LIMITING CONDITION FOR OPERATION 3.10.1 The SHUT 00WN MA'RGIN requirement of Specification 3.1.1.1 may be suspended for measurement of CEA worth and shutdown margin provided reactivity equivalent to at least the highest estimated CEA worth is available for trip insertion from OPERABLE CEA(s).

APPLICABILITY: MODE 2.

ACTION:

a.

With any full length CEA not fully inserted and with less than the above reactivity equivalent available for trip insertion, imsdiately initiate and continue baration at > 40 gpm of 2300 l

ppm boric acid solution or its. equivalent untiT the SHUT 00WN MARGIN required by Specification 3.1.1.1 is restored.

b.

With all full length CEAs inserted and the reactor subcritical' by less than the above reactivity equivalent, imediately

+

initiate and continue boration at > 40 gpm of 2300 ppm boric l

acid solution or its equivalInt until the SHUT 00WN MARGIN re-quired by Specification 3.1.1.1 is restored.

SUR'lEILLANCE REQUIREMENTS 4.10.1.1 The position of each full length CEA required either partially or fully withdrawn shall be determined at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.

4.10.1.2 'Each CEA not fully inserted shall be demonstrated capable of full insertion when tripped from at least the 50". withdrawn. position with-in d h::S prior to reducing the SHUTDOWN MARGIN to less than the limits oflpecification 3.1.1.1.

( 7 days 8503120290 850226

[DR ADOCK 05000317 PDR

=k CAL'lERT CLIFFS - WrfMPg 3/4 10-1 Amendment No. 32,48' CAL'l aY CLI-FFS - J::IT A::cadment b. JZ, 31

,4

-,,.,_e

3/4.15 SPECIAL TEST EXCEPTIONS fs SHUTCOWN MARGIN LIMITING CONDITION FOR OPERATION 3.10.1 The SHUTCCWN MARGIN requirement of Specification 3.1.1.1 may be suspended for measurement of CEA worth and shutdown margin provided reactivity equivalent :o at least the highest estimated CEA worth is available for trip insertion from CpERABLE CEA(s).

APPLICABILITY: M00E 2.

ACTION:

a.

With any full length CEA not fully inserted and with less than the above reactivity equivalent available for trip insertion, imtdiately initiate and continue boration at > 40 gpm of 2300 l

ppm boric acid solution or its equivalent untiT the SHUTCOWN MARGIN required by Specification 3.1.1.1 is restored.

b.

With all full length CEAs inserted and the reactor suberitical by less than the above reactivity equivalent, imedia tely initiate and continue boration at > 40 gpm of 2300 ppm boric l

acid solution or its equivalent until the SHUTDOWN MARGIN re-quired by Specification 3.1.1.1 is restored.

SUR*/EILLANCE RECUIREMENTS 4.10.1.1 The positicn of eacn full length CEA recuired either partially or fully withdrawn shall be deternined at least once per 2 nours.

4.10.1.2 'Each CEA not fully inserted shall be demonstrated capable of full insertion when tripoed frem at least the 5C", withdrawn position with-int 'rSprior to reducing the SHUTDOWN MARGIN to less than the limits off3cecification 3.1.1.1.

Ny CAL'lERT CLIFFS - UNIT 1 3/4 10-1 Amendment No. 32,28 Anent.=cn

.;o. JZ, 31

,ALl ;n aIFFs..ag3Lg