ML20108E035
| ML20108E035 | |
| Person / Time | |
|---|---|
| Site: | Washington Public Power Supply System |
| Issue date: | 12/05/1984 |
| From: | Sorensen G WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| To: | Adensam E Office of Nuclear Reactor Regulation |
| References | |
| GO1-84-0280, GO1-84-280, NUDOCS 8412140149 | |
| Download: ML20108E035 (2) | |
Text
_ -. __-
Washington Public Power Supply System P.O. Box 968 3000GeorgeWashingtonWay Richland, Washington 99352 (509)372-5000 Docket No. 50-460 December 5, 1984 G01-84-0280 Director of_ Nuclear Reactor Regulation Attention:
Elinor G. Adensam, Chief Licensing Branch No. 4 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
NUCLEAR PROJECT NO. 1 CERTIFICATION OF SERVICE FOR NUCLEAR PROJECT NO. 1 FSAR AMENDMENT N0. 4
Reference:
Letter, Darrell G. Eisenhut, NRC to R.L. Ferguson, Supply System,
" Acceptance Review of Application for Operating License for Washington Nuclear Project, Unit No.1", dated July 16, 1983 In accordance with the instructions included with the reference, enclosed is a copy of the Certificate of Service on the, 1) Chairman, Benton County Commissioners, and 2) EPA, Region X, EIS Review Coordinator, for the subject FSAR Amendment.
b G. C. Sorensen, Manager Regulatory Programs (340)
GCS:AGH:pp Enclosure cc:
T. Kenyon, NRC (MD-ll6)
N.S. Reynolds; Bishop, Liberman, Cook, Purcell & Reynolds NRC Document Control, DC ORM (847)
FDCC (899)
K h OOI IlI
a BEFORE THE UNITED STATES NUCLEAR REGULATORY C0fEISSION Application of WASHINGTON PUBLIC POWER SUPPLY SYSTEM for an Operating License for a Utilization Facility to be known as Washington Public Power Supply System Nuclear Project No. I at its Site in Benton County, Washington STATE OF WASHINGTON
)
)
COUNTY OF BENTON
)
Alan G. Hosler certifies that copies of Amendment No. 4 to the Final Safety Analysis Report, as part of the application of the Washington Public Power Supply System to operate a nuclear power plant at its Nuclear Project No.1
. site on the United States Department of Energy Reservation, Benton County, Washington, were served upon the 1) Chairman, Benton County Commissioners, and
- 2) EPA, Region X, EIS Review Coordination, EPA by deposit in the U.S. Mail, postage prepaid, on Dec em 6e,-
3
, 1984:
(1Go., A) W Alan G. Hosler On this day personally appeared before me Alan G. Hosler to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.
GIVEN under my hand and seal this M day of
/d
, 1984.
Notary Public in and for the State of Washington, Residing at:
k l
'McAfad 4)k
/
YI?Mel M27
..