ML20108C379

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept DER 84-65 Re Split Instrument Leads Removed from Ugs.Initially Reported on 840904.Due to Extensive Investigation & Evaluation,Next Rept Delayed Until 841115
ML20108C379
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/25/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30952-TDS, DER-84-65, NUDOCS 8411160538
Download: ML20108C379 (2)


Text

&

u,~

+

EECENED unc Arizona Public Service Company -

g Q: faO P.O. BOX 21666 e PHOENIX ARIZONA 85036 9EGtDMVIM October 25,-1984 ANPP-30952-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-65 t

A 50.55(e) Potentially Reportable Deficiency Relating To Instrument Leads Removed From The UGS Are Split.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between D. Hollenbach and T. Bradish on September 4,1984 (B) ANPP-30735, dated October 3, 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by October 26, 1984

?

Due to the extensive investigation and evaluation required, it is now expected th+t this information will be finalized by November 15, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, i

%L E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two i

n 8411160538 841025 PDR ADOCK 05000528 8

l 9 PDR l-ff-A 7

'9..

l 9

Mr. T. W. Bishop DER 84-65 Page Two-cc:

Richard DeYcung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W.'E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 l

Atlanta, GA 30339 1

I t

t