Interim Deficiency Rept DER 84-54 Re Containment Sump Isolation Valve.Initially Reported on 840817.Due to Extensive Evaluation,Next Rept Delayaed Until 841115
ML20108C204
Person / Time
Site: Palo Verde  
Issue date: 10/30/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31000-TDS, DER-84-54, NUDOCS 8411160434
Download: ML20108C204 (2)


Text

-

o

\\

l PJCEIVE9 Arizona Public Service Company

!3% t:0v-2 gggg 97 October 30; 1984

'D W ANPP-31000-TDS/TRB U. S. ' Nuclear Regulatory Commission Region V 2

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek; California 94596-5368 Attention: Mr. T. W. B! shop; Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-54 A 50.55(e) Potentially Reportable Deficiency Relating To Containment Sump Isolation Valve.

File: 84-019-026; D.4.33.2

Reference:

( A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30543, dated September 17, 1984 (Interim Report)

(C) ANPP-30871, dated October 17,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by October 31, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 15, 1984; at which time a ec=picte report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, CLLL qt E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director i

EEVB/TRB/nj cc: See Page Two 84111 0434 841030 PDR A K 05000529 PDR IO S

7py

. (

3 7;

.r;.

+

i 4

Mr. ' Ti. W. Bishop

DER 84-54

}-

Pa'ge Two

~

t-cc:

. Richard DeYoung, Director 0ffice of Inspection and Enforcement z U. S. -Nuclear Regulatory Commission Washington, D. C.

20555 T. G; Woods, Jr.

j D. B. Karner i

W. E. Ide D..B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T.

D.- Shriver C. N. Russo I

J. Vorees I -

J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield i

W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster i

D. R. Hawkinson R. P. Zimmerman 4

]

L. Clyde M. Woods j

T. J. Bloom Records Center Institute of Nuclear Power Operations-1100 Circle 75 Parkway, Suite 1500 l

Atlanta, CA 30339 i.

1 i

e E

1 l

.