Interim Deficiency Rept DER 84-62 Re Load Sequencer Not Functioning Properly During Safeguards Testing.Initially Reported on 840815.Due to Extensive Evaluation,Next Rept Delayed Until 841114
ML20108C198
Person / Time
Site: Palo Verde  
Issue date: 10/30/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31001-TDS, DER-84-62, NUDOCS 8411160429
Download: ML20108C198 (2)


Text

u-20 Arizona Nuclear Power Project lgg g,F,i /jfp3 P O BOX 52034 e PHOENIX. ARIZONA 85072-2034 October 30, 1984 NW ANPP-31001-TDS/TR3 U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects Subf c:

Time Extension For Report - DER 84-62 A 50.55(e) Potentially Reportable Deficiency Relating To Load Sequencer Did Not Function Properly During Safeguards Testing.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and T. Bradish on August 17, 1984 (B) ANPP-30531, deted September 17,1984 (Interim Report)

(C) ANPP-30794, dated October 11, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference ( A), an Interic Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be availabic by October 31, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 14, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours

.k(CLLL MtLL E. E. Van Brunt, J r.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8411160429 841030 PDR ADOCK 05000528 S

PDR

'O

' w, Lvs.

Mr. T. W. Bishop DER 84-62 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission'

. Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo.

J. Vorees J. R. Bynum J. M. Allen A.

C.' Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T; J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339

.