Interim Deficiency Rept DER 84-15 Re Welds Attaching Pipe Restraint Supports Less than design-calculated Dimensions. Due to Extensive Evaluation,Final Rept Delayed Until 841116
ML20108C128
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/30/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-31012-TDS, DER-84-15, NUDOCS 8411160388
Download: ML20108C128 (2)


Text

_a JEg/E0 Arizona Nuclear Power Projectjgg3 g

/.h fD: Q 7 P O DOX 52034

  • PHOENW, A Al2ONA 89372-2m4 October 30, 1984 ANPP-31012-TDS/LBS U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-15 A 50.55(e) Potentially Reportable Deficiency Relating To Welds Attaching Pipe Rectraint Supports Less Than Design-Calculated Dimensions In Unit 2.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between P. Narbut and J. Cook on March 21,1984 (B) ANPP-29285, dated April 12,1984 (Interim Report)

(C) ANPP-30071, dated July 30, 1984 (Time Extension)

(D) ANPP-30479, dated September 11,1984 (Time Extension)

Dear Sir:

The NRC was notified of a poi.eui.lally reputi.able deficiency in Reference ( A), an Interim Report was transmitted by Reference (B),

and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by October 31, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by Novemler 14, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, F(F neb cut E. E. Van Brunt, J r.

8411160388 841030 APS Vice President PDR ADOCK 05000529 Nuclear Production S

PDR ANPP Projec.t Director EEVB/LBS/nj cc: See Page Two

'h ZEM7

^ '

Mri T. W. Bishop DER'84-15 Page Two ec:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner

W. E. Ide D. B. Fasnacht.

A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R.

F. Zimmerman L. Clyde M. Woods T. J. Bloom i

B. S. Kaplan Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 4