Interim Deficiency Rept DER 84-74 Re Class 1E Inverters Supplied by Elgar.Initially Reported on 840928.Insp of All Class 1E 120-volt Ac Inverter Panels to Be Performed.Final Rept Delayed Until 841115
ML20108C105
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 10/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANP-31008-TDS, ANPP-31008-TDS, DER-84-74, NUDOCS 8411160377
Download: ML20108C105 (3)


Text

_

[

9.j

/ECEJVED 1:nc' Arizona Public Service Company i92%1gy-g /N O 07 October 29; 1954 ANPP-31008-TDS/ N IIVisC U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek; California 94596-5368 Attention: Mr. T. W. Bishop; Director Division of Reactor Safety and Projects

Subject:

Interim Report - DER 84-74 A 50.55(e) Potentially Reportable Deficiency Relating To Class 1E Inverters Supplied By Elgar.

File: 84-019-026; D.4.33.2

Reference:

Telephone Conversation between C. Sorenson and T. Bradish on September 28; 1984

Dear Sir:

The NRC was notified of a potentially reportable deficiency in the referenced telephone conversation. At that time; it was estimated that a determination of reportability would be made within thirty (30) days.

Due to the extensive investigation and evaluation required; an Interim Report is attached. It is now expected that this information will be finalized by November 15, 1984; at which time a complete report vill be submitted.

Very truly yours, CJLJL.L_

NL E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj Attachment cc: See Page Two a

8411160377 841029 PDR ADOCK 05000528 S

PDR j

'l '

._T]_~)]

i

s

+

a

' Mr. T. W. Bishop DER-84-74 Page Two ec:

Richard DeYoung; Director Office of Inspection and Enforcement U.' S; Nuclear Regulatory Commission -

. Washington; D. C.

20555 T. G. Woods; Jr.

D. B. Karner W.' E..Ide

~D. B. Fasnacht A. C. Rogers -

L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J, Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson 5

R. W. Welcher H. D. Foster j

D. R. Hawkinson 4

R. P. Zimmerman L. Clyde M. Woods T. J. Bloom

)

B. S. Kaplan Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339

O'. ;

^

ff..

  • c 1
1. o 7

..e

. INTERIM REPORT - DER 84-74'

^

'^

POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC. SERVICE COMPANY ( APS)

PVNGS UNIT.l' 4

I.

Potential-Problem' 7.

.During startup testing of Class 1E, 120V AC inverters furnished by Elgar Corporation;-the inverters IEPNAN11 and 1EPNBN12 blew bridge fuses (A50P200) during loading. Also, the alarm logic board failed during starting of the inverter 1EPNDN14..The inspection and testing of inverter panels IEPNAN11; _1EPNBN12, IEPNCN13; 1EPNDN14 by APS Startiup Engineering is in progress.

.II.

Approach To and Status Of Proposed-Resolution 4

The results of. inspection and testing of all Class 1E'120V AC inverters panels in Unit 1 shall be evaluated to determine the a

reportability and corrective action required.

III.

Projected Completion of' Corrective Action and Submittal of the Final Report The complete evaluation and-final report are forecast to be 4

completed by November 15;.1984.

?