Interim Deficiency Rept DER 84-68 Re Defective Essential Chiller Temp Switch.Initially Reported on 840910.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841115
ML20108B646
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30996-TDS, DEF-84-68, DER-84-68, NUDOCS 8411160133
Download: ML20108B646 (2)


Text

r

~~e' SO - 528, SJ9, 5 30 b#

p A

Arizona Nuclear Power Project CP -f

(([7 P.O BOX 52034

October 29, 1984 ANPP-30996-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-68 A 50.55(e) Potentially Reportable Deficiency Relating To The Essential Chiller Temperature Switch.

File: 84-019-026; D.4.33.2

Reference:

( A) Telephone conversation between L. Miller and K. Parrish on September 10, 1984 (B) ANPP-30785 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference ( A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by October 30, 1984.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 15, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

(

CLLL BOLL E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8411160133 841029 gDRADOCK 05000528 PDR 1 l0 71-27

,... =

.j.

= s, f '

- g b.

Mr. T. W. Bishop DER 84-68

-Page Two cc:

Richard DeYoung, 612:3 tor.

Office of Inspection and Enforcement.

U. S. Nuclear Regulatory Commission Washington; D. C.

20555 1

T. C. Woods,~Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A.-Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees

~J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. C. Bingham R. L. Patterson R. W. Welcher

- II. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 4

g