r RECEWED NRC Arizona Public Service Company 03i CCT 29 E412: W O
October 25, 1984 ANPP-309453-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, Californic 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects
Subject:
Time Extension For Report - DER 83-73 A 50.55(e) Potentially Reportable Deficiency Relating To Unqualified Foxboro Power Supplies Were Installed In IE Instrument Cabinets.
File: 84-019-026; D.4.33.2 Ref erence: (A) Telephone conversation between P. Narbut and R. Tucker on October 27, 1983 (B) ANPP-28290, dated November 28,1983 (Interim Report)
(C) ANPP-28538, dated January 3,1984 (Time Extension)-
(D) ANPP-28934, dated February 24,1984 (Time Extension)
(E) ANPP-29352, dated April 24,1984 (Time Extension)
(F) ANPP-29582, dated May 23,1984 (Time Extension)
(G) ANPP-30448, dated September 6,1984 (Time Extension)
(H) ANPP-30636, dated September 24,1984 (Time Extension)
Dear Sir:
j The NRC was notified of a potentially reportable deficiency in l
Reference (A), an Interim Report was transmitted by Reference (B), and Time Extensions were requested by References (C), (D), (E), (F), (G), and (H). At that time, it was estimated that a Final Report would be available by October 25, 1984 j
Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 14, 1984, at which time a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
i Very truly yours, N
E. E. Van Brunt, Jr.
APS Vice President Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two 8411160096 841025
'M, t
Mr. T. _ W. Bishop DER 8 3-73 Page Two cc:
Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 T. G. Woods, Jr.
D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen i
A. C. Gehr j
W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson l
R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, CA 30339 e
i l
l l
_, _. _ =. _, _,,
_..