Interim Deficiency Rept DER 84-67 Re Defective Target Rock Solenoid Valves.Initially Reported on 840907.Due to Extensive Investigation & Evaluation,Final Rept Delayed Until 841114
ML20108B500
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/29/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30994-TDS, DER-84-67, NUDOCS 8411160084
Download: ML20108B500 (2)


Text

._

l' 50-527,529, 530 f,ffEr/

Arizona Public Service Company lig gg _', M il: jg

~

NO6h pg October 29; 1984-ANPP-30994-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane -. Suite 210 i

Walnut Creek, California 94596-5368 a

Attention: Mr. T. W. Bishop; Director Division of Reactor Safety and Projects

Subject:

Time Extension For Report - DER 84-67 A 50.55(e) Potentially Reportable Deficiency Relating To i

Target Rock Solenoid Valves.

File: 84-019-026; D.4.33.2 3

Reference:

(A) Telephone conversation between D' Hollenbach and T. Bradish on September 7,1984 (B) ANPP-30744; dated October 4; 1984 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by October 30, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 14, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, CLLL

'L' i

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production i

ANPP Project Director l

EEVB/TRB/nj cc: See Page Two

(

8411160084 841029

~

19 PDR ADOCK- 05000528 8

PDR 3g.y

.a

Mr. T. W; Bishop.

DER 84-67~

Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 1

T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson

'R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods

]

T. J. Bloom 4

Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 4

.