Interim Deficiency Rept DER 84-44 Re Fatigue Failure of Charging Pumps.Initially Reported on 840706.Due to Extensive Investigation & Evaluation Required,Next Rept Will Be Submitted by 841116
ML20108B495
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/25/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30954-TDS, DER-84-44, NUDOCS 8411160081
Download: ML20108B495 (2)


Text

.o

,?

ricavEc H3c Arizona Public Service Company

@ rCT 23 FI' I? ?

October 25, 1984 ANPP-30954-TDS/TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. T. W. Bishop, Director Division of Reactor Safety and Projects

Subject:

Time E:: tension For Report - DER 84-44 A 50.55(e) Potentially Reportable Deficiency Relating To Fatigue Failure Of The Charging Pumps.

File: 84-019-026; D.4.33.2

Reference:

(A) Telephone conversation between D. Hollenbach and A. Ramey i

on July 6,1984 l

(B) ANPP-30128, dated August 6, 1984 (Interim Report)

(C) ANPP-30634, dated September 24,1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it was estimated that a Final Report would be available by October 26, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by November 16, 1984, at which time a complete report will be subm!'..:ed.

There is no new information or change to the Interim Report at this time.

Very truly yours,

@N_

W I

~

E. E. Van Brunt, Jr.

APS Vice President Nuclear Production ANPP Project Director EEVE/TRB:nj cc: See Page Two 8411160081 841025 PDR ADOCK 05000528 S

PDR f[-Q

. -s Mr. T. W. Bishop DER 84-44 Page Two cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D. R. Hawkinson R. P. Zimmerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GA 30339 I

i l

1

-