r MON.'HLY OPERATING REPORT DOCKET NO.
50-483 UNIT NAME CALLAWAY UNIT 1 DATE ocenhor 4.
1984 COMPLsTsu BY J. T: Patterson TELEPHONE (314) 676-8207 PART A OPERATIONS
SUMMARY
September 1984 The plant entered September operating in Mode 3.
Normal operating temperature j
and pressure was achieved on September 6, 1984. The plant went down to Mode 4 on September 12, 1984 and back up to Mode 3 on September 13, 1984 where it operated for the remainder of the month.
Q PART B PORV AND SAFETY VALVE
SUMMARY
~
No PORV's or safety valves were challenged during the month.
hD kD 0
R CA-#804 05/09/84 QDP-ZZ-04204 Page 1 of 4
..e
- ^
- f.
Part C 1
AVERAGE DAILY 11 NIT POWER LEVEL t
DOCKET NO.
50-483 UNIT Callaway DATE october 3. 1984 COMPLETED By K. R. Bryant TELEPHONE (314) 676-8292 MONTH sentenber. 1984 6
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) 0 1
37 o
0 o
i 2
3, 0
3 13 0
o 4
f 0
0 5
21 0
4 22 0
7 0
23 0
B 24 0
0 0
0 3
5 0
0 10 3
0 0
11
,7 12 0
g o
0 13 3
o l
O o
14 15 0
33 l
Ig 0
l 0[
84 Page 2 of 4 QDP-ZZ-04204 g
4 Part D OPERATING DATA REPORT 50-483 DOCKET NO.
UNIT Callaway October 3, 1984 DATE COMPLETED SY K. R. Bryant TELEPHONE (314) 676-8292 OPERATING STATUS September. 1984 gross HOURS IN REPORTING PERICO:
7?n
- 1. REPORTING PERIOD:
0 3411 uAx. DEPENO. CAPACITY (MWo Mot):
- 2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):
DESIGN ELECTRICAL RATING (MWs Net):
1120 Q
O
- 3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe Not):
- 4. REASONS FOR RESTRICTION (IP ANYl: Required to meet commitments listed in Operating License NPF-25 THIS M NTH YR T DATE CuMutATivE before exceeding 5% (Rated Thermal Power)
O O
O S. NUMBER OF HOURS REACTOR WAS CRITICAL O
O O
- 8. REACTOR 9ESERVE SHUTDOWN HOURS 0
0 0
7
- 7. HOURS GENERATOR ON LINE 0
0 0
- 8. UNIT RESERVE SHUTOOWN HOURS 0
0 0
- 9. GROSS THERMAL ENERGY GEhERATED (MWM) 0 0
_0
- 10. GROSS ELECTRICAL ENERGY GENER ATEC (MWHI..
0 0
0
- 11. NET ELECTRICAL ENERGY GENERATED (MWH)
NA NA NA
- 12. REACTOR ST.RVICE FACTOR NA NA NA
- 13. REACTOR AVAILAOf LITY FACTOR NA NA NA
- 14. UNIT SERVICE FACTOR NA NA NA l
- 15. UNIT AVAILASILITY F ACTOR NA NA NA
- 16. UNIT CAPACITY PACTOR tumas MCCI NA NA NA
- 17. UNIT CAPACITY F ACTOR (Usene Demon MWel....
NA NA NA ts. UNIT FORCED OUTAGE RATE
- 19. SHUTDOWNS SCHEDULED OVER NEXT S MONTHS (TYPE. DATE. AND DURATION OF EACHl.
None
- 20. IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATE 0 DATE OP STARTUP: 10/2/84
- 21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED 10/2/84 INITI AL CRITICALITY lO/20/84 INITIAL ELECTRICITY COMMERCIAL OPERATION CA-#804
- Forecast completion of ascension testing 12/25/84.
05/09/84 Page 3 of 4, QDP-ZZ-04204 l
e w
--,,,we
,y w--,
l s
I
.4.
s.
9 Part E DOCKET NO.
50-483
[
l UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME callaway DATE october 4. 1984 J. T. Patterson COMPLETED BY TELErtIONE (314) 676-8207 f
REPORT MONTil con e amk a,-
t o n,,
l i
METHOD OF i
TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR 3
NO.
DATE S: SCHEDULED IHOURS)
REASON REDUCING POWER CORRECTIVE ACTIONS /COMMENTE i
j 1
i t
I
SUMMARY
No unit shutdowns or power reductions as the plant is.in its initial startup and in Mode 3' ascending for the first time.
l CA-#804 05/09/84 Page 4 of 4 QDP-ZZ-04204
=y-kW 3. '.,
eV -
I,?:
a
- UNION - EtscTaic' COMPANY,
' CALLAWAY PLANT-s MAILING ADDRESS PO.SOXS2O
' PULTON, MO. G5359
' October 5, 1984.-
Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555'
-ULNRC-940-DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-25 MONTHLY OPERATING REPORT SEPTEMBER 1984
Dear Sir:
The enclosed Monthly Operating Report for September 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1 Technical Specifications.
S. E. Miltenberger M
JTP/WilS/RRG/dra Enclosure cc: Distribution attached g6
g-q.
- /*'{..
Y a
.cc distribution for ULNRC-940
- with enclosures
- Mr. James G. Keppler Regional Administrator Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission.
Region III 799 Roosevelt Road Glen Ellyn,.IL 60137-Director Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, DC' 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 circle 75 Parkway
-Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman-The Exchange Suite 245 270 Farmington Avenue Farmi..gton, CT 06032 NRC Resident Inspector Missouri Public Service Commission D. F. Schnell J. E. Davis (Z40MOR)
R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Robinson (QA Record)
P. T. Appleby SEM Chrono i
3456-0021.6 l
Z40ULNRC G56.37 N Date
.--