Forwards Rev 0 to Physical Security & Safeguards Contingency Plan,Incorporating Vehicle Measures,Based on 960229 Implementation Date for Land Vehicle Intrusion Barrier Sys at CP&L Nuclear Plants.Encl Withheld (Ref 10CFR73.21)
ML20107M599
Person / Time
Site: Harris, Brunswick  Duke Energy icon.png
Issue date: 04/29/1996
From: Walt T
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
PE&RAS-96-028, PE&RAS-96-28, NUDOCS 9605010011
Download: ML20107M599 (2)


Text

_

7,.3,

. n,%.

o o-CP&L 10 CFR mummmmmmmmmma 50.54(p)(2)

Carolino Power & Ught Company PO Box 1551 411 Fayetteville Street Mall April 29,1996 Serial: PE& RAS-96-028 Raleigh NC 27602 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk gfQ hM c hbM0h-1 Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. I AND 2 DOCKET NOS. 50-325 AND 50-324 / LICENSE NOS. DPR-71 AND DPR-62 SHEARON HARRIS NUCLEAR POWER PLANT, UNIT NO. I DOCKET NO. 50-400 / LICENSE NO. DPR-63

SUBJECT:

SUBMITTAL OF REVISION 0 TO Tile PilVSICAL SECURITY AND SAFEGUARDS CONTINGENCY PLAN Gentlemen:

In accordance with 10 CFR 50.54(p)(2), Carolina Power and Light Company (CP&L) hereby transmits Revision 0 of the CP&L Physical Security and Safeguards Contingency Plan; Brunswick Steam Electric Plant industrial Security Plan, Revision 23, Brunswick Steam Electric Plant Safeguards Contingency Plan, Revision 8, Shearon Harris Nuclear Power Plant Security Plan, Revision 10 and Shearon Harris Nuclear Power Plant Safeguards Contingency Plan, Revision 3.

Revision 0 supersedes the following plans: Brunswick Steam Electric Plant Industrial Security Plan, Revision 22 Brunswick Steam Electric Plant Safeguards Contingency Plan, Revision 7, Shearon Harris Nuclear Power Plant Security Plan, Revision 9 and Shearon Harris Nuclear Power Plant Safeguards Contingency Plan, Revision 2.

This plari change is being submitted by April 29,1996 based on the February 29,1996 implementation date for the Land Vehicle Intrusion Barrier System at CP&L's nuclear plants.

These vehicle control measures have been incorporated into the enclosed Physical Security and Safeguards Contingency Plan. As specified in 10 CFR 50.4(b)(4)(iii), CP&L is submitting the signed original and three copies to the Document Control Desk. Enclosed with the Security Plan are descriptions of the changes from the previous site-specific plans, including justifications for the changes being made.

This evaluation determined that the changes do not decrease the overall safeguards effectiveness of the Plan' 9605010011 960429 PDR ADOCK 05000324 F

PDR The enclosed materials contain Safeguards Information and require protection in accordance with the provisions of 10 CFR 73.21. When separated from the enclosures, handle this document as 0100 N~

r( f)- sg

,TTA C E E m J IAi a SAFEGUARDS INFORMAT10h J

l l

c,.

i l

l Document Control Desk PE& RAS-96-028 / Page 2 If additional information regarding this submittal is desired please contact me at (919) 546-6901.

l Sincerely, O

T. D. Walt Manager - Performance Evaluation & Regulatory Affairs Enclosures PNM/pnm c:

w/

Mr. S. D. Ebneter, Regional Administrator - Region !! (2 copies) w/o Mr. J. B. Brady, USNRC Resident Inspector - SHNPP, Unit 1 Mr. N. B. Le, NRR Project Manager - SHNPP, Unit 1 Mr. C. A. Patterson, USNRC Resident inspector - BSEP, Units I and 2 Mr. D. C. Trimbla, Jr., NRR Project Manager - BSEP, Units 1 and 2 The Honorable H. Wells - North Carolina Utilities Commission i