Monthly Operating Rept for Sept 1984
ML20107L867
Person / Time
Site: Cooper Entergy icon.png
Issue date: 09/30/1984
From: Salisbury J, Thomason P
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
CNSS840381, NUDOCS 8411130678
Download: ML20107L867 (5)


Text

_.

y OPERATING DATA REPORT (i

DOCKET NO.

50-296 DATE _10-10-84_

COMPLETED BY J.K. Sali.sbury TELEPHONE 402-825-3811 OPERATING STATUS N"I'5

1. Unit Name:

Coaoer Nuclear Station

2. Reporting Period:

September, 1984 2381

3. Licensed Thermal Power (MWt):

836

4. Nameplate Rating (Gross MWe):

770

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Cag$acity (Gross MWe):

787 764 7, Maximum Dependable Capacity (Net MWe):

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For R,estrictions. If Any:

f This Month Yr. to Date Cumulatis e

!!. Hours in Repokting Period 720.0 6,575.0 89,880.0 357.I 5,952.6 72,955.6

12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown llours 0.0 0.0 0.0
14. Hours Generator On-Line 357.1 5,902.3 71,820.6 0.0 0.0 0.0
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 507,766.0 10,926,853.0 141,440,011.0
17. Gross Electrical Energy Generated (MWH) 164,055.0,,

3,618,141.0

_45,024,496.0

18. Net Electrical Energy Generated (MWH) 157,718.0 3,469.953.0

_43,386,612.0 49.6 89.8 79.9

19. Unit Service Factor 49.6 89.8 79.9
20. Unit Availability Factor 28.7 69.1 63.2
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 28.2 67.8 62.0

.23. Unit Forced Outage Rate 0.8 2.2 3.6

' 24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Eachl:

1984 Refueling and Maintenance Starting September 1.6, 1984 with an_ approximate 7 month duration.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

MAY I.

1985

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achiesed INITIA L CRITICALITY INITIA L ELECTRICITY CONIMERCIAL OPER ATION 8411130678 840930 PDR ADOCK 05000298 R

PDR

("'7'l

i, AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-298 LWIT CNS 10-10-84 DATE CONIPLETED IlY J.K. Salisbury TELEP110NE 402-825-3811 310NT11 September, 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE I AILY POWER LEVEL (31We Net)

(51We Net) 1 494'

~'

0 37 371 0

2

,3 3

385-- - -- - "-

~~~

"O~~~~~~~~

39 472 0

4 20 5

464 0

,3 6

455 22 0

442 7

__._.,3..

...o _.._.

S 457 0

.s 384 o

9 73 10 425 26 0

452 o

Ii

,7 12 453 o

3 453 0

13

,9 14 468 0

30 g3 396 3,

16 0

INSTRtJCTIONS On this form 21. list the nerage daily umt power I:velin \\tWe Net for each day in the reporting month. Compute to the nearest whole megaw itt.

s o t;- )

g A

~

DOCKET NO.

50-298 UNITSIIUIDO*4NS AND' POWER REDUCTIONS UNIT NAME CNS DATE -- In-in_ n COMPLETED BY J K. Salimbury REPORTMONTil her tom.

TELEPHONE 40?-9?s-u t i e.

E c

Licensee

,Eg ja.

Cause & Currective

.! ?

3 yYl Action to No.

Date g

Eg i-Js5 Event g'g po H

$E 5

5gc Report #

mU Prevent Recurrence, o

e u

c5 84-6 9-15-84 F

2.9 A

2 NA NA NA A RClO valve packing steam leak required a controlled shutdown. A manual scram was initiated at 2106.

S 360 B/C 4

NA NA NA Due to low electrical load demand and the critical nature of the upcoming outage schedule, a management decision was made'to remain shutdown and to commence the 1984 Refueling and Maintenance Outage on 9-16-84 i

I 2

3 4

Method:

Exhibit G-Instructions F: Forced Reasor3:

S: Scheduled A-Equipment Failure (Explain) 1-Manual for, Preparation of Data B Mair3tenance or Test 2-Manual Scram.

Entry Sheets for Licensee C Refueling 3 AutomaticScram.

Event Report (LER) File (NUREG s D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative 5

Eshibit 1 Same Source G-Operational Error (Explain)

(9/77)

II-Other (Explain) a

s OPERATIONS NARRATIVE Cooper Nuclear Station September 1984 The plant operated the month of September with one (1) unscheduled shutdown and no scheduled or unscheduled power changes.

An RCIC valve packing steam leak required the controlled shutdown of the plant. An orderly shutdown was commenced and the reactor was manually scrammed at 2106 on Septem-ber 15, 1984.

Due to the forced outage above, a management decision was made to remain shut down and to reschedule the commencement of the 1984 Refueling and Maintenance Outage to September 16, 1984.

A capacity factor of 28.7% was achieved for the month of September.

r

e e

b, o

COOPER NUCLEAR STATION Nebraska Public Power District

^ " * ;"A"E3"?'tM; ""s"."^,5'"

m CNSS840381 October 10, 1984 Director, Office of Management Information and Program Control U.S. Nuclear Regulatory Commissicn Washington, D.C.

20555

Subject:

Monthly Operation Status Report for September 1984 Docket No. 50-298 Gentlemen:

Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for September 1984. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.

Should you have any comments or require additional information regarding this report, please contact me.

Sincerely, P. V. Thomason Division Manager of Nuclear Operations PVT:lb Enclosure cc:

G. D. Watson w/ enc.

A. C. Gehr w/ enc.

J. T. Collins w/ enc.

i

  1. o