Special Rept:On 840808 & 1012,area Radiation Monitors 2RI-7856 & 2RI-7857,respectively,declared Inoperable When Found Out of Calibr.Caused by Instrument Drift During 31-day Surveillance.Alternate Method of Monitoring Initiated
ML20107H945
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 10/26/1984
From: Haynes J
SOUTHERN CALIFORNIA EDISON CO.
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
NUDOCS 8411090326
Download: ML20107H945 (2)


Text

, _ _

tGCEIVED F'

NEC Southern California Edison Company WO

~W OCT 29 M ll: I6-S AN ONOFRE NUCLE AR GENER A TING ST ATIO*4 P.O. BO X 12 8 SAN CLEMENTE. C ALIFORNI A 92672 15 7

J. G. H A Y N ES TELeewont

' STQTsON M ANAGt4 (7143492-7700 October 26, 1984 U.S. Nuclear Regulatory Commission

0ffice of Inspection and Enforcement Region V 1450 Maria Lane, Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. J. B. Martin, Regional Administrator

Dear Sir:

Subject:

Docket No. 50-361 Special Report San Onofre Nuclear Generatirg Station, Unit 2 Pursuant to Section 6.9.2 of Appendix A, Technical Specifications to Facility Operating License NPF-10 for San Onofre Unit 2, this submittal provides the required Special Report for inoperable radiation monitoring alarm instrumentation.

On October 12, 1904, at 0957, with Unit 2 in Mode 1 at 85% power, the Containment Purge Train 'B' Area Radiation Monitor 2RI-7857 was declared inoperable when it was found out of calibration due to instrument drift during its 31-day surveillance. Containment Purge Train 'A' Area Radiation Monitor 2RI-7856 had previously been declared inoperable on August-8, 1984, also due to instrument drift. 2RI-7856, located in Containment, had not yet been restored because, due to ALARA concerns, it was scheduled to be repaired during the upcoming outage.

Since neither 2RI-7856 or 2RI-7857 were restored to operable status within 72' hours,'in accordance with Limiting Condition for Operation (LCO) 3.3.S.1, Table 3.3-6, Action Statement 19, the pre planned alternate method of monitori.1g was initiated. 2RI-7856 was restored to operable status on October 26, 1984, during the outage which began October 20, 1984.

Isotopic calibration of 2RI-7857 is currently in progress.

PDR

\\ O ZS-2f

___y

-. a-.-

m.

4

Mr. J. B. Martin.

-Neither the health and safety of plant personnel nor the public were affected by this event.

If you require any additional.information, please so advise.

Sincerely, s

n&

F.'R. Huey (USNRC Senior Resident Inspector, Units I, 2 and 3)

cc:

J. P. ' Stewart (USNRC Resident Inspector, Units 2 and 3)

Document Control Desk, Washington, D. C. 20555 Institute of Nuclear Power Operations (INPO) l i