ML20107H605
| ML20107H605 | |
| Person / Time | |
|---|---|
| Site: | Salem (DPR-70-A-058, DPR-70-A-58, DPR-75-A-027, DPR-75-A-27) |
| Issue date: | 10/17/1984 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20107H607 | List: |
| References | |
| NUDOCS 8411090157 | |
| Download: ML20107H605 (8) | |
Text
.
nsay
,/pe
[ j,,._, Io, UNITED STATES j
NUCLEAR REGULATORY COMMISSION 7.,
,E WASHINGTO N, D. C. 20555
- %; :s ]
PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELEGIRIC COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC ClIY ELEGIKlG COMPANY DOCKET NO. 50-272 SALEM NUCLEAR GENERATING STATION, UNIT N0. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE Amendment No. 58 License No. OPR-70 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated October 5, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted with'out endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. OPR-70 is hereby amended to read as follows:
8411090157 841017 PDR ADOCK 05000 P
. (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 58, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION A
byen gd, g
OperatingReactorsBrg3ch#1 Division of Licensing
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 17, 1984 l
ATTACHMENT TO LICENSE AMEN 0 MENT NO.sa FACILITY OPERATING LICENSE NO. OPR-70 i
DOCKET NO. 50-272 Revise Appendix A as follows:
Remove Pages Insert Page 3/4 4-16 3/4 4-16 1
0
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)
Measurement of the CONTROLLED LEAKAGE from the reactor coolant c.
pump seals at least once per 31 days when the Reactor Coolant System pressure is 2230 + 20 psig and valve ICV 71 is fully
- closed, d.
Performance of a Reactor Coolant System water inventory balann' at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The water inventory balance shall be performed with the plant at steady state conditions. The provisions of specification 4.0.4 are not applicable for entry into Mode 4, and
, Monitoring the reactor head flange leakoff system at least e.
once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
2 i
i SALEM - UNIT 1 3/4 4-16 Amendment No. 58 i
n 7
a
- p** ***vg o
UNITED STATES
'g NUCLEAR REGULATORY COMMISSION j ?,,
g WASHINGTON, D. C. 20555
%..w.. ]j j
+
PUBLIC SERVICE ELECTRIC AND GAS COMPANY PHILADELPHIA ELECIKIC COMPANY DELMARVA POWER AND LI(iHT COMPANY ATLANIIC CIIT ELECTRIC COMPANY DOCKET NO. 50-311 SALEM NUCLEAR GENERATING STATION, UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 27 License No. OPR-75 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Public Service Electric and Gas Company, Philadelphia Electric Company, Delmarva Power and Light Company and Atlantic City Electric Company (the licensees) dated October 5,1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; 4
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the_ license is amended by changes to the Technical Specifications as indicated in the attachment to this license
~
amendment, and paragraph 2.C.(2) of Facility Operating License No. OPR-75 is hereby amended to read as follows:
.--v.
-, -,,,. -.. - -, +. -
- -.,,. - + -
. (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 27, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This' license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY *COMISSION.
f
~
- abga, f
Operating Reacto ranch #1 Division of Licens g
Attachment:
Changes to the Technical Specifications Date of Issuance:
October 17, 1984 4
i 1
ATTACHMENT TO LICENSE AMENDMENT NO. 27 FACILITY OPERATING LICENSE NO. DPR-75 DOCKET NO. 50-311 Revise Appendix A as follows:
Remove Page Insert Page 3/4 4-18 3/4 4-18 1
i e
b t
f e
nn-
.---,,,,--,--r,
REACTOR COOLANT SYSTEM SURVEILLANCE REQUIREMENTS (Continued)
Measurement of the CONTROLLED LEAKAGE from the reactor coolant pump l
c.
seals at least once per 31 days when the Reactor Coolant. System pressure is 2230 1 20 psig and valve 2CV71 is fully closed, d.
Performance of a Reactor Coolant System water inventory balance at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />. The water inventory balance shall be performed with the plant at steady state conditions. The provisions of specifica-tion 4.0.4 are not applicable for entry into Mode 4, and Monitoring the reactor head flange leakoff system at least once per e.
24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
4.4.7.2 Each Reactor Coolant System Pressure Isolation Valve specified in
. Table 3.4-1 shall be demonstrated OPERABLE pursuant to Specification 4.0.5, except that in lieu of any leakage testing required by Specification 4.0.5, each valve shall be demonstrated OPERABLE by verifying leakage to be within its limit:
a.
At least once per 18 months.
b.
Prior to entering MODE 2 whenever the plant has been in COLD SHUT 00WN for 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or more and if leakage testing has not been performed in the previous 9 months.
Prior to returning the valve to service follbwing maintenance repair c.
or replacement work on the valve.
d.
For the Residual Heat Removal and Safety Injection Systems hot and cold leg injection valves and accumulator valves listed in Table 3.4-1 the testing will be done within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following valve actuation due to automatic or manual action or flow through the valve.
For all other systems testing will be done once per refueling.
The provisions of specification 4.0.4 are not applicable for entry into MODE 3 or 4.
l i
(
SALEM - UNIT 2 3/4 4-18 Amendment No. 27