Corrected TS Pp to Amends 89 & 88 to Licenses DPR-80 & DPR-82,revising TS Re ESFAS Instrumentation & SR & Clarified Containment Fan Cooling Unit Configurations
ML20107H313
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 04/16/1996
From:
NRC
To:
Shared Package
ML20107H315 List:
References
NUDOCS 9604240077
Download: ML20107H313 (2)


Text

l._

t i

TABLE 3.3 5 (Continued)

TABLE NOTATIONS (1) Diesel generator starting delay not included because offsite power available.

(2) Notation deleted.

l (3) Diesel generator starting and loading delays included.

(4) Diesel generator starting delay not included because offsite power is available.

Response time limit includes opening of valves to establish SI th and attainment of discharge pressure for centrifugal charging pues (where 1 cable). Sequen-tial transfer of charging pump suction from the VCT to the (RWST valves open.

then VCT valves close) is included.

(5) Diesel generator starting and sequence loading delays included. Offsite power is not available. Response time limit includes opening of valves to establish $1 path and attainment of discharge pressure for centrifugal charging pumps. Sequential transfer of charging pug suction from the VCT to the RWST (RW5T valves open, then VCT valves close) is included.

(6) The maximum response time of 48.5 seconds is the time from when the containment pressure exceeds the High High Setpoint until the spray pump is started and the discharge valve travels to the fully open position assuming off site power is not available. The time of 48.5 seconds includes the 28 second maximum delay related to ESF loading sequence. Spray riser piping fill time is not included. The 80-second maximum spray delay time does not include the time from LOCA start to "P' signal.

(7) Diesel generator starting and sequence loading delays included. Sequential trans-fer of chargin valves close) g pump suction from the VCT to the RWST (RWST valves open, then VCT is not included. Response time limit includes opening of valves to establish 51 flow path and attainment of discharge pressure for centrifugal charging pumps. 51 and RHR pugs (where applicable).

(8) Does not include Trip Time Delays. Response times include the transmitters. Eagle-21 Process Protection cabinets. Solid State Protection System cabinets and actua-tion devices only. This reflects the response times necessary for T)ERNAL POWER in excess of 50% RTP.

DIABLO CANYON tal!TS 1 & 2 3/4 3 31 Amendment Nos. 34 8 69. M & N, 84 & E 9604240077 960416 PDR ADOCK 05000275 P

PDR

a J

l TABLE 4.3-2 l

ENGINEERED SAFETY FEATURES ACTUATION SYSTEN INSTRtMENTATION SURVEILLANCE REQUIREMENTS i

3$

TRIP 5

ANALOG ACTUATING NODES FOR n

CHANNEL OPERA-OPERA-NASTER SLAVE WHICH t

R CHANNEL CALI-TIONAL TIONAL ACTUATION RELAY RELAY SURVEILLANCE y FUNCTIONAL UNIT CHECK BRATION TEST TEST LOGIC TEST TEST IL1L.

IS REQUIRED

1. Safety Injection, (Reactor Trip l

E Feedwater Isolation, Start t

Z Diesel Generators, Containment Fan Cooler Units, and Component j

~

Cooling Water)

?

l a.

Manual Initiation N.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3, 4 b.

Automatic Actuation N.A.

N.A.

N.A.

N.A.

N(1)

N(1)

Q 1, 2, 3, 4 Logic and. Actuation Relays r

r c.

Containment Pressure-High S

R Q

N.A.

N.A N.A.

N.A.

1, 2, 3, 4 f

l w

d.

Pressurizer Pressure-Low S

R Q

N.A N.A.

N.A.

N.A.

1, 2, 3 l

w e.

DELETED f.

Steam Line S

R Q

N.A.

N.A.

N.A.

N.A.

1,2,3 l

=s Pressure-Low i

0;;
2. Containment Spray m-e a a.

Nanual Initiation N.A.

N.A.

N.A.

R N.A.

N.A.

N.A.

1, 2, 3, 4

[

kk b.

Automatic Actuation Logic N.A.

N.A.

N.A.

N.A.

N(1)

N(1)

Q 1, 2, 3, 4 and Actuation Relays

==

kk c.

Containment Pressure-S R

Q N.A.

N.A.

N.A.

N.A.

1, 2, 3, 4 l

High-High zz

??

3 S i

l lh s=

s

.