4 VERMONT YAPKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 85-01 FOR THE MONTH OF JANUARY,1985 8502260387 850131 PDR ADOCK 05000271 R
pyg
- 3. E.1
OPERATING DATA REPORT Docket No. 50-271 Date 850209 Compl'eted by F.J. Buraer Telephone (802; 257-7711 OPERATING STATUS Notese 1.
Unit Names Vermont Yankee 2.
Reporting Period:
January 3.
Licensed Thermal Power (MWt):
1593 4.
Nameplate Rating (Gross MWe):
540 5.
Design Electrical Rating (Net MWe): 514(OC) 504(CC) 6.
Maximum Dependable Capacity (Gross MWe),
535 7.
Maximum Dependable Capacity (Net MWe):
504 8.
If changes occur in capacity ratings (Items Number 3 through 7) since last report, give reasons:
N/A 9.
Power level to which restricted, if any (Net MWe):
N/A
- 10. Reasons for restrictions, if any:
N/A This month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 744.00 744.00
- 12. Number of Hours Reactor was Critical 744.00 744.00 87557.93
- 13. Reactor Reserve Shutdown Hours 0.00 0.00 0.00
- 14. Hours Generator On-Line 744.00 744.00 85174.07
~
- 15. Unit Reserve Shutdown Hours 0.00 0.00 0.00
- 16. Gross Thermal Energy Generated (MWH) 1180435.00 1180435.00 123739444.50
- 17. Grcss Electrical Energy Generated (MWH) 400579.00 400579.00 41190327.00
- 18. Net Electrical Energy Generated (MWH) 384408.00 384408.00 39085256.00 l
- 19. Unit Service Factor-100.00 100.00 78.58
- 20. Unit Availability Factor 100.00 100.00 78.58
- 21. Unit Capacity Factor (using @C Net) 102.52 102.52 71.55
- 22. Unit Capacity Factor (using DER Net) 100.52 100.52 70.16
- 23. Unit Forced Outage Rate 0.00 0.00 7.32
- 24. Shutdowns scheduled over next 6 months (Type, Date and Duration of Each).
N/A
- 25. If shut down at end of report period, estimated date of startup.
N/A
- 26. Units in Test Status (prior to commercial operation).
Forecast Achieved Initial Criticality Initial Electricity Commercial Operation MSR.F1
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-271 Unit vermont Yankee Date 850209 Completed by F.J. Buroer Telephone (802) 257-7711 MONTH ' January DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 519 17 518 2
519 18 518 3
519 19 518 4
519 20 512 5
519 21 518 6
513 22 518 7
520 23 518 8
518 24 518 9
518 25 519 10 518 26 519 11 518 27 505 12 518 28 519 13 491 29 518 14 518 30 518 15 518 31 518 16 518 INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
MSR.F2
Docket No.
50-271 Unit vermont Yankee UNIT SHUTDOWNS Af0 P0tER REDUCTIONS Date 850209 Completed by F.J. Burger REPORT MONTH January Telephone (802)257-7711 1
2 3
4 5
No.
Date-Typed Duration Reason Method of License System Component Cause and Corrective Action to (hours)
Shutting Down Event Code Code Prevent Recurrence Reactor Report #
85-01 850113 S
0 B
4 power N/A RB CONR00 Power reduction for surveillance reduction testing.
I 2
3 4
F-Forced A-Equipment Failure (Explain)
Method:
Exhibit G - Instructions S-Scheduled B-Maintenance or Test 1-Manual for Preparation of Data Entry C-Refueling 2-Manual Scram Sheets for Licensee Event D-Regulatory Restriction 3-Automatic Scram Report (LER) File (NUREG 0161)
E-Operator Training and License Examination 4-Other (Explain)
F-Administrative 5
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
. I. l r 1 e 1 c 7 N
r 7 O
1 u
I 7 e O 7 T
2 e 5
C
- k
. 2 A
0 n J.
5 a 9
)
E Y 0 F 2
V 2 yN I
t 0
T n 5 b(
C
.o 8 E
om de R
Nr en R
t o O
tV eh C
s l p kt epe ci t ml onaoe DUDCT T
LU SER N
O I
T CNU FLAM ESU AC EG E
A C
T N
U A
OR N
E E
Re Ou TN Rl I
A E
M L
DET E
A FC L
ON E
A R
EN RE Y
UT T
TN E
AI F
NA A
M S
TN E
P IU e
Q n
E o
N 4
F.
R SM
4 Docktt No. 50-271 Unit Vermont Yankee Date 850209 Completed by F.J. Burger Telephone (802) 257-7711 REPORT M) NTH January SUPNARY OF OPERATING EXPERIENCES Hiahlichts Vermont Yankee operated at 99.6% of rated thermal power for the month. Gross electrical generation was 400,579 MWH or 99.7 % of design electrical e
capacity.
Operating Summary At the beginning of the reporting period the plant was operating at 99.9% of rated thermal power.
850113 At 0030 hrs a power reduction was initiated for surveillance testing and a rod pattern adjustment.
850113 At 0310 hrs a return to full power was started.
At the end of the reporting period the plant was operating at 99.9% of rated thermal power.
MSR.F5
VERhiONT YANKEE NUCLEAR POWER CORPORATION P. O. BOX 157 GOVERNOR IIUNT ROAD VERNON, VERMONT 05354 VYV 85-073 February 11, 1984 U. S. Nuclear Regulatory Commission Director, Office of Management Information and Program Control Washington, D.C.
20555
Dear Sir:
Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of January,1985.
Very truly yours, NT YA*EE NUCLEAR POWER CORPORATION f
dl-1 hrWarrenP.
rphy Vice President and Manager of Operations WPMgJBapdA4SR1.1 l