k8 DPERATING DATA REPORT DOCKET NO 50-413 DATE April 15. 1996 OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346
- 1. Unit Name: Catamba 1
- 2. Reporting Period: March 1,1996-March 31,1996 3.' Licensed Thersal Power (MWti:
3411
- 4. Naseplate Rating (Gross MWe):
1305*
Notes *Naseplate Rating
- 5. Design Electrical Rating (Net NWe):
!!45 (6ross NWel calculated as
- 6. Maxieus Dependable Capacity (6ross MWe):
!!92 1450.000 MVA x.90 power 7.-Eaxinus Dependable Capacity (Net MWe):
1129 factor per Page lii, B. If Changes Occur in Capacity Ratings (! tees Number 3 Through 7) Since Last NUREG-0020 Report. Give Reasons:
~
- 9. Power Level to Which Restricted, If Any (Net MWe):
10.ReasonForRestrictions,ifany This Month Yr.'-to-Date Cumulative-
!!, Hours In Reporting Period 744.0 2184.0 94297.0
- 12. Nueber Of Hours Reactor Was Critical 744.0 2113.1 74406.7
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
l
- 14. Heurs Senerator On-Line 744.0 2092.9' 731B1.6
- 15. Unit Reserve Shutdown Hours
--0--
--0--
--0--
- ~
- 16. Gross Thersal Energy Generated (MWW) 2515908 6698378 238648637
- 17. Gross Electrical Energy Generated fMWH) 906338 2403730 84306541 18.' Net Electrical Energy Generated (MWH) 060184 2271990
.79317079
' 19. Unit Service Factor 100.0 95.8 77.6
- 20. Unit Availability Factor 100.0 95.9 77.6 l
- 21. Unit Capacity Factor (Using MDC Net) 102.4 92.1 74.3 l
- 22. Unit Capacity Factor (Using DER Net) 101.0 90.8 73.5
- 23. Unit Forced Outage Rate 0.0 4.2 B.!
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling - June 13, 1996 - 99 days
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup Li, Units In Test Status (Prior to Consercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY i
COMERCIAL DFERATION n
I 9604220319 960415 PDR ADOCK 05000413 R
CPERATING DATA REPORT DOClfET N0 50-413 UNIT Catawba 1 DATE April 15. 1996 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346
)
MONTH March.1996 QR AVERAGE DAILY POWER LEVEL QM AVERAGE DAILY POWER LEVEL j
(MWe-Net)
(MWe-Net) l
!!57 17 1156 2
!!53 18 1159 3
!!55 19 1159 l
4 1161 20 1161 5
1158 21
!!61 l
6 1156 22 1162 7
1157 23
!!63 8
1158 24 1162 9
1160 25 1158 10
!!61 26 1157
)
1160 27 1161 i
12
!!63 28 1163 13
!!63 29
!!62 l
14
!!60 30 1161 1
15
!!42 31
!!62 16 1071 l
i
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-413 UNIT NAME Carants4 1 DATE ue/ id/ w _.
REPORT MONTH March 1996 COMPLETED BY x.
A.
w1111ams TELEPHONE
(>us)-362-dase (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent U Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other l
1
DOCKET: 50-413 UNIT: Catawba 1 Date: 04/15/96 l
NARRATIVE
SUMMARY
l MONTH: March,1996 1
Catawba Unit I began the month of March operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l l
i l
l I
l l
l
\\
1 Prepared by: R. A. Williams Telephone: (704)- 382-5346
}
i i
I
- -. - - - = - -
1 klONTHLY REFUELING INFORMATION REOUE_SI i
1.
Facility name:
Catawba. Unit I l
2.
Scheduled next refueling shutdown: June 1996 3.
Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
i 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Conunittee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 123 (b) in the spent fuel pool: 16_Q 8.
Present licensed fuel pool capacity: 1418 Size of requested or planned increase: =
9.
Projected date of last refueling which can be accommodated by present license capacity:
September 2009 DUKE POWER COMPANY DATE: April 15.1996 Name of
Contact:
B. A. Williams Phone: (7(M) - 382-5346 l
l l
DPERATIN6 DATA REPORT DOCKET NO 5 H 14 l
l DATE Agt{L.J5.1996 i
OPERATING STATUS COMPLETED BY _R.t. Willines TELEPHONE,_74-382-5346
- 1. Unit Nase: Catawba 2
- 2. Reporting Period: March 1, 1996-March 31, 1996
- 3. Licensed Thersal Power (MWtli 3411
- 4. Naseplate Rating (Gross MWe):
1305e Notes eNaseplate Rating
- 5. Design Electrical Rating (Net MWe):
!!45 (Gross MWe) calculated as
- 6. Maximus Dependable Capacity (6ross NWel
!!92 1450.000 MVA x.90 power l
- 7. Maxisus Dependeble Capacity (Net MWel:
!!29 factor per Page lit, l-
- 8. If Changes Occur in Capacity Ratings (itees Nueber 3 Through 7) Since Last NURE6-0020.
Report. Give Reasons:
- 9. Power Level le Which Restricted, If Any (Net MWe):
l
- 10. Reason For Restrictions, If any J
This Month Yr.-to-Date Cueulative i
!!.HoursinReportingPeriod 744.0 2184.0 94313.0 i
i'
- 12. Nueber Of Hours Reactor kas Critical 744.0 1941.3 66107.5 l-
- 13. Reactor ReserYe Shutdown Hours
--0--
- --0--
- 14. Hours Generator On-Line 744.0 1903.1 65040.7
- 15. Unit Reserve Shutdown Hours
--0 ~
--0--
-+-
- 16. Gross Thereal Energy Generated trii.H) 2531429 6447623 209664161
- 17. Gross Electrical Energy Generated (MWH) 909459 2311756 74416123
- 10. Net Electrical Energy Generated (MWH) 866070 2193754 70106011
- 19. Unit Service Factor 100.0 87.1 77.1 20.UnitAvailabilityFactor 100.0 B7.1 77.1
- 21. Unit Capacity Factor (Using MDC Net) 103.1 89.0 73.5
- 22. Unit Capacity Factor (Using DER Net) 101.7 87.7 72.6
- 23. Unit Forced Outage Rate 0.0 12.9 9.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup
- 26. Units In Test Status (Prior to Consercial Operation):
Forecast Achieved l
INITIAL CRITICAllTY INITIAL ELECTRICITY COMMERCIAL OPERATION l
OPERATING DATA REPORT DOCKET NO 50-414 UNIT Catawba 2 DATE April 15. !?96 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 MONTH March 1976 QAY AVERAGE DAILY POWER LEVEL DE AVERAGE DAILY POWER LEVEL A
(MWe-Net)
(MWe-Nett i
!!66 17
!!61 2
1167 18 1165 3
!!67 19 1161 4
!!66 20
!!66 5
1161 21
!!69 6
1159 22 1164 7
!!60 23 1167 8
1165 24 1165 9
!!66 25 1160 l
10
!!67 26
!!62 11
!!64 27
!!67 12 1166 28 1167 l
13 1165 29
!!65 l
l 14 1162 30 1166 15 1157 31
!!66 16 1160 l
l l
l n
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-414 UNIT NAME Carantsa z DATE ue/id/96 REPORT MONTH March 1996 COMPLETED BY x.
A.
williams TELEPHONE
( v u s ) -J is z -d3 s b (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE W
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or. test 2-Manual Scram Ent y Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( N G-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
, -+
w
l DOCKET: 50-414 UNIT: Catawba 2 Date: 04/15/96 NARRATIVE
SUMMARY
MONTH: March,1996 Catawba Unit 2 began the month of March operating at 100% full power. The unit operated at or near 100% full power for the entire month.
l i
i i
I 1
i i
i l
Prepared by: R. A. Williams Telephone: (704)- 382-5346 i
4 i
MONTHLY REFUELING INFORMATION REOUEST 1.
Facility name: Catawba. Unit 2 2.
Scheduled next refueling shutdown: hiarch 1997 I
3.
Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED 1N THIS REPORT.
l 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: 192 (b) in the spent fuel pool: 524 8.
Present licensed fuel pool capacity: 14.13 Size of requested or planned increase: - :
9.
Projected date of last refueling which can be accommodated by present license capacity:
September 2011 DUKE POWER COMPANY DATE: April 15.1996 Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 l