ML20107C997

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1985
ML20107C997
Person / Time
Site: Palisades Entergy icon.png
Issue date: 01/31/1985
From: Dienes A, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
References
NUDOCS 8502220189
Download: ML20107C997 (5)


Text

...

.(,

OPERATING DATA REPORT DOCKET NO 50-255 DATE 02-11-85 COMPLETED BY AFDienes TELEPHONE (616)764-8913 OPERATING STATUS NOTES 1.

Unit Name: Palisades 2.

Reporting' Period:

850101-850131 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7 5.

- Design Electrical Rating (Net NWe):

805 6.

Maximum Dependable Capacity (Gross MWe): *675 7.

Maximum Dependable Capacity (Net MWe):

  • 635

-8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) since last report, give reasons:

'9.

Power Level to Which Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744 744 115,023 12.

Number of Hours Reactor Was Critical 744 744 61,553.7

13. Reactor Reserve Shutdown Hours

~~

14.

Hours Generator On-Line 744 744-58,358.3 15.

Unit Reserve Shutdown Hours 16.

Gross Thermal Energy Generated (MWH) 1,802,520 1,802,520 119,885,472 17.

Gross Electrical Energy Generated (HWH) 579,330 579,330 37,197,120 18.

Net Electrical Energy Generated (HWH) 550,177 550,177 34,989,740 19.

Unit Service Factor 100 100 50.7

-20.

Unit Availability Factor 100 100 50.7 21.

Unit Capacity Factor (Using MDC Net) 116.5 116.5 47.9 22.

Unit Capacity Factor (Using DER Net) 91.9 91.9 37.8 23.

Unit Forced Outage Rate 0

0 33.2

'24.

Shutdcuns Scheduled Over Next Six Months (Type, Date and Duration of Each):

25.

If Shut Down at End of Report Period, Estimated Date of Start Up:

26.

Units in Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY' INITIAL ELECTRICITY CONNERCIAL OPERATION

  • Based on condenser backpressure OC0185-00018-0P02 PM **!86 U B E L...

d 4

,I w

m t

s

-AVERAGE DAILY UNIT POWER LEVEL lu DOCKET NO 50-255 UNIT Palisades DATE 02-11-85 COMPLETED BY AFDienes TELEPHONE-(616)764-8913 MONTH January 1985 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 758 17 761 2

765 18 756 3

756 19 753 4

758 20 747 5

-760 21 747 6

763 22 758

-7 763' 23 758 8

763 24 760 9

762 25 755

-10 760

.26 757 11 753 27 759 12

-299 28 758 13' 650 29 761 14 -

754 30 759 15

'755 31-759 16 755 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

OC0185-0001C-OP02

+-

'N q.

s D00CET ND.

50-255

- 1MIT SHUTDOWNS Ale POWER REDUCTIONS.

UNIT NAlet Palisades' DATE 02-11-85 COMPLETED BY AFDienes REPORT MONTH JANUARY 1985 TELEPHONE (616)-764-8913 1

-2 No.

Date Type Duration Reason Method of Licensee Systp Compopnt Cause & Corrective (Hours)

Shuting Event Code Code Action to Down Reactor Report

  • Prevent Recurrence 1

850111 F

0 8

4 Power redr.ction to fill a primary coolant pump lower oil reservoir,

. 1..

2.

3.

4 5.

F: Forced Reason:

Method:

Exhibit G - Instructions Exhibit I - Same Source S: Scheduled A-Equipment Failure'(Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee j

C-Refueling 3-Automatic Scram Event Report (LER) File i

D-Regulatory Restriction 4-Other (Explain)

(NUREC-0161)

E-Operator Training & License Examination l

F-Administrative

.G-Operational Error'(Explain)

(9/77)

H-Other (Explain) l l

OCo185-0001D-Or02 f

e.

A r.

SUMMARY

OF OPERATING EXPERIENCE FOR JANUARY 1985 The Plant reduced power on one occasion to add oil to primary coolant pump

-P-50D.

Otherwise, the Plant operated at'approximately 98 percent of rated power.

s

.OC0185-0001E-OP02 L..

e-i

.g i

Consumers Power company Polisades Nuclear Plant: Route 2, Som 154. Covert, MI 40043 February 13, 1985 US Nuclear Regulatory Commission Mail and Recordc Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of January 1985.

Y hR Sb 1

Dewey VanDenBerg Reactor Engineer CC: KMHass, Palisades GHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B

.LABrown, P21-317 CWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa, Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, CA RWraylor, CE, Palisades JBToskey, P25-101 EWRaciborski, P26-204 BLHarshe, P26-208 Document Control, 950*22*35*10/L GHG85*005 3

+

e