ML20107A328
ML20107A328 | |
Person / Time | |
---|---|
Site: | San Onofre |
Issue date: | 12/31/1984 |
From: | Haynes J, Mayweather L SOUTHERN CALIFORNIA EDISON CO. |
To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
References | |
NUDOCS 8502190419 | |
Download: ML20107A328 (12) | |
Text
N T.
~
c ,
~
, . NRC' MONTHLY OPERATING . REPORT ~
DOCKET NO. 50-361 UNIT: SONGS - 2
= DATE January 15, 1985 COMPLETED BY L. I. Mayweather TELEPHONE (714) 492-7700 Ext. 56264 CPERATING STATUS.
- 1. . Unit Name: San Onofre Nuclear Generating Station, Unit 2
'2. Reporting Period: December 1984
- 3. -Licensed Thermal Power (MWt): 3390
-4.. Nameplate. Rating (Gross MWe): 1127-
- 5. Design Electrical Rating (Net MWe): 1070
- 6. Maximum Dependable Capacity (Gross MWe): 1127
- 7.
~
--Maximum Dependable Capacity (Net MWe): 1070
- 8. If Changes Occur In Capacity Ratings (Items Number 3 Through.7)
Since Last Report, Give Reasons:
NA
- 9. Power Level.To Which' Restricted, If'Any (Net MWe):
NA
- 10. Reasons For Restrictions, If Any: NA This Month Yr.-to-Date Cumulative
- 11. Pours In Reporting Period 744 8,784 12,289
- 12. Number Of Hours Reactor Was Critical 0 -~~
5,272.52 7,885.22
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Haurs Generator On-Line - 0 5,170.77 7,732.47
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 0 16,584,748.3 25,078,283.3
- 17. Gross Electrical Energy Generated (MWH) 0 5,577,911.5 8,489,876.5
- 18. Net Electrical Energy Generated (MWH) -2,248 5,267,291 8,042,936
- 19. Unit Service Factor 0 58.87 62.92
- 20. Unit Availability Factor 0 53.87 62.92
- 21. Unit Capacity Factor (Using MDC Net) 0 56.04 61.17
- 22. Unit Capacity Factor (Using DER Net) 0 56.04 61.17
- 23. Unit _ Forced Outage Rate 0 3.88 3.85
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling, October 21, 1984, 3-1/2-month duration (now in progress).
- 25. _If Shut Down At End Of Report Period, Estimated Date of Startup: 2/8/85
- 26. Units In Test Status (Prior To Commercial Operation): Forecast Achieved INITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION NA- NA 2941u 8502190419 841231 PDR ADOCK 05000361 R
li l PM
r
~ . '. ; ..
, AVERAGE' DAILY UNIT POWER LEVEL DOCKET NO. 50-361 UNIT SONGS - 2 DATE January 15, 1985 COMPLETED BY L. I. Mayweather TELEPHONE- (714) 492-7700 Ext. 56264 MONTH . December 1984 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
-(MWe-Net) (MWe-Net) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0 9 0 25 0 10 0 26 0 _
11 0 27 0 12 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0 2941u
17 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.,19-161
-UNIT NAME SONGS - 2__
REPORT MONTH DECEMBER 1984 DATE IIdhlBarY ID. _ _ _ _1303 . , .
COMPLETED BY L. f. Maywea the r TELEPHONE ( 714 ) 492-7700 Ext. 56264 Method of' Shutting Dura t ion Down LER . System. Component- Cause & Corrective 1 .
2 3 4 4 Action to~ .lj No. Date Type - ( Hau rs ) Reason Reactor No. Code Code Prevent Recerrence 9 841020 S 744- C 4 NA NA NA NA ' Refueling.
P 1 2 3 4.
F-Fo rced . . Reason: Method: IEEE.Std 803-1983 S-Scheduled A-Equipment Failure (Explain) 1-Manual 8-Maintenance or Test 2-Manua l Sc ram.
C-Refueling- 3-Automatic Scram.
D-Regulatory Restriction . 4-Continuation from E-Operator Training & License Examination Previous Month F-Admin i st ra t i ve - , 5-Reduction of.20%
G-Ope rationa l Error (Expla in) or greater in -the H-Other (Expla in) past 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> 9-Other ( Expla in) 12941u 8
.FD ,
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH DOCKET NO. 50-361 UNIT SONGS - 2 DATE January 15, 1985 COMPLETED BY L. I. Mayweather TELEPHONE (714) 492-7700
-Ext. 56264 Date/ Time Event'
- December
- 1, 0001 Unit' remains defueled in day 42 of refueling / design
-change. outage. Shutdown Cooling Train A and B modification in progress.
. December 11, 1950 Fuel. inspection of fuel in fuel inspection stand stopped due to report of 23rd' fuel assembly binding in the stand.
Investigation in progress.
December 22,12255 Began-high pressure hydro of shutdown cooling system.
December 31, 2359
~
Unit remains defueled.' Shutdown cooling system flush ~
in progress. Bound fuel assembly investigation in progress.
1 2941u !
-lI l
4 m _ _ . .a
. REFUELING ' INFORMATlON DOCKET NO. 50-361 UNIT -SONGS - 2'
-DATE January 15, 1985 COMPLETED BY L. I. Mayweather
. TELEPHONE (714) 492-7700 Ext. 56264-
- 1. Scheduled date for next refueling' shutdown.
Not yet determined.
- 2. Scheduled date_for restart-following refueling.
_Not yet determined.
- 3. Will refueling or resumption of operation thereafter require a Technical-Specification change or other license amendment?
Not yet determined.
What will these be?
Not yet determined.
- 4. Scheduled date for submitting proposed licensing action and supporting information.
Not yet determined.
- 5. Important Licensing considerations associated with' refueling, e.g. new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating
_ procedures.
Not yet determined.
- 6. The number of fuel assemblies, a) In the core. O b) In the spent fuel storage pool. 217
- 7. Licensed spent fuel storage capacity. 800 Intended change'in spent fuel storage capacity. NA
- 8. Projected date of last refueling that can be discharged to spent fuel storage pool assuming present capacity.
Approximately 1997.
-2941u i
p +:n -
AfQuf ,,
. , NRC' MONTHLY, OPERATING REPORT DOCKET NO. 50-362 UNIT NAME SONGS - 3 DATE January 15,1985 COMPLETED BY L. I. Mayweather TELEPHONE (714) 492-7700 Ext. 5S264 OPERATING STATUSn
- 1. < Unit Name: San"Onofre Nuclear Generating Station, Unit 3
- 12. rReparting Period: December 1984
'3.= ' Licensed Therral . Power (MWt): 3390
-4. Nameplate Rating (Gross MWe): 1127
- 5. Design Electrical Rating (Net MWe): 1080
- 6. Maximum Dependable Capacity (Gross MWe): -1127
- 7. Maximum Dependable Capacity (Net MWe): 1080
.8. If Changes Occur In Capacity Ratings (Items Number 3 Through 7)_
Since Last Report, Give Reasons:
NA
~
- 9. Power Level To Which~ Restricted, If Any (Net MWe): NA -
- 10. Reasons For-Restrictions, If Any: NA
,., ; This Month Yr.-to-Date Cumulative-
- 11. Hours In Reporting Period . -744 6,600 6,600
'12. Number Of Hours Reactor Was Critical 682.73 4,420.17 4,420.17
- 13. Reactor Reserve Shotdown Hours 0 0 0
- 14. Hours Generator On-Line ~
626.63 4,105.95 4,105.95-
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,961,635 13,061,588.4 13,061,588.4
'17. Gross Electrical Energy Generated (MWH) 662,459 4,366,831.5 4,366,831.5
- 18. Net Electrical Energy Generated .(FMH) 624,666 4,100,370 4,100,370
- 19. Unit Service Factor 84.22 62.21 62.21
- 20. Unit Availability Factor 84.22 62.21 62.21
- 21. Unit Capacity Factor (Using MDC Net) 77.74 57.52 57.52
- 22. Unit Capacity Factor (Using DER Net) 77.74 57.52 57.52
- 23. Unit Forced Outage Rate 0 0 0
.24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration-of Each):
NA
-25. .If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A
.26. Units In Test Status (Prict To Commercial Operation): Forecast Achieved
~
lNITIAL CRITICALITY NA NA INITIAL ELECTRICITY NA NA
+
COMMERCIAL OPERATION NA NA s ,
- These numbers'have'been fevised based on audit of the July 1984 values.
,_ AVERAGE DAILY UNIT POWER LEVEL'
, DOCKET NO. 50-362 UNIT SONGS - 3 DATE January 15,-1985 COMPLETED BY L. I. Mayweather TELEPHONE (714) 492-7700 Ext. 56264 MONTH December 198'4
-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 1,111.50 2 0 18 1,112.50~
3 0 19 1,108.75 4 25.04 20 1,110.13 5 292.63 21 1,087.96 6 708.71 22 1,079.21-7 0 23~ 1,108.38 8 314.92 24 1,104.38 9 634.67 25 1,103.67 10 1,102.38 26 1,104.92 11 1,111.25 27 1,103.21 12 1,109.79 28 1,087.33 13 1,110.58 29 1,098.46 14 1,093.33 30 1,098.88-15 1,110.71 31 1,057.83 16 1,113.83 2941u
- f. .
~
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.30-362 ,
UNIT NAME SONGS - 3._ ~
REPORT MONTH NOVEMBER 1984 'DATE ~KilU5TV I3 _Iwo
__5 .
COMPLETED BY L. l. 1avvea the r TELEPHONE ~f7141 492-7700 ,-
Ext. 56264 _j, !
Method of Shutting . , . .
Dura t ion Down LER System' Component Cause & Corrective
-1 2 3 :4- 4 ' '_ Action to No. Date Type (Hours) Reason " Reactor No. _ Code.
_ Code Prevent ~ Recurrence 1
J9'
~
841027 S 80.85 B 4 NA . AB SG Continuation or scheduled' outage
. ror repai r or primary to seconda ry '
. leak in Steam Cenerator E-089. .;
4
-10 841206 .F 36.52 A 3 84-040 TA UPS- Voltage transient on one phase on j p Non-1E uninterruptible power supply - '
I electrical system generated a -
L turbine and subsequent reactor trip-
[' .due to railed power-supply on the :
l l- load rejection trip panel. All ..
power supplies and circuit units on -
the load ' rejection trip , panel. were ~
' replaced, ll 1
1 2 3 4 IEEE Std BU3-1983 F-fo rced Reason: .
Method:
S-Scheduled. A-Equipment failure (Explain) 1-Manual B-Ma intenance or Test ' 2-Manua l Scram.
C-Refueling .
3-Automatic Scram.
D-Regulatory Restriction 4-Continuation f rom .
_ E-operator ' Tra ining & Licenso Examina cion .Provious Month' F-Adm in i st ra t ive .
' 5-Reduction of 20%.
G-Opera t iona l Error (Explain) . o r g rea te r in the '
H-Other ( Explain) '
past 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />s-9-Other (Explain) -
2941u
- w
SUMMARY
OF OPERATING EXPERIENCE FOR THE: MONTH LDOCKET NO. 50-362
' UNIT SONGS - 3 DATE Ja nua ry - 15, 1985 ~
COMPLETED BY.L. I. Mayweather TELEPHONE .(714) 492-7700 Ext. 56264 Date/ Time Event December 1 0001 Unit is.in Mode 3. Preparations for Mode 2 entry and completion of the steam generator repair outage are in progress.
December.2 2006 Entered Mode 2.
December 2 '2035 Reactor critical.
December 4 0510 Entered Mode 1.
December 4 0851 Unit synchronized to the grid following approximately a twenty-four. hour delay due to the failure of an actuator for one of the main feedwater-regulating bypass valves (3FV1106).
December 4 1000 Reactor power stabilized at 20% for repair of a pressurizer level transmitter (LT110-1) in containment.
December 5 0530 Repair was completed and reactor power is being increased 3% per hour.
December 5 2205 Power is restrained at 65% until repairs are made to the solenoid dump valve SV-12 of main feedwater_ pump turbine K006.
December 5 0900 Commenced power increase.to 100%.
December.6 1420 Achieved 100% reactor power.
December 6 1947 Reactor tripped due to a bad power supply in the turbine load rejection panel.
December 7 1219 Entered Mode 2.
December 7 1228 Reactor critical.
December 8 0130 Entered Mode 1.
December 8 0818 Synchronized generator and applied block load.
December 8 1255 Reactor power is at 61.5% power. Restrained at this point until repairs to the pressure level _ cold calibrated transmitter is completed.
December 9 2030 Commenced power increase following repairs to transmitter.
December 10 0135 Unit is at 100% power.
i
~
=T4 -
roi :Decemberil'3' 2231' R;actorLpiwer'rzduced;due to loss'of COLSS.(Cora Operating
? Limit;Suptrvisory System).
2235: ' Initiated power; increase after COLSS declared operable.
.Decemberi14 0001- Unit is at 100% power.
' 1905L Commenced load reduction to 90%Lfor weekly turbine stop .
s and. governor valve' testing.
December'15 0001 LUnit returned to:100% after satisfactory completion of' Lturbine stop and governor valve. testing. '
December 21 2000' -Commenced load reduction to 90% for turbine stop and !
governor valve testing. ;
December 22--0730 Raised reactor power to'100% following turbine. valve-testing.
LDecember 28 :11950 Commenced load reduction to 90%'to perform turbineistop-and governor valve testing.
December 29' 0125 Reactor power is'at 100%.
December _30 '1851 ~A reduction in power was initiated due to a COLSS-failure.
December 30 1930 Unit returned toffull. power following restoration of
.COLSS.
December 31 .1616 -Reduced power'due to COLSS out of service.
December 31 2035 _COLSS declared operable after replacing the #3 power
. supply. Initiated increase in power.
December 31 2142- . Unit at 90% power.
December 31 2359 Unit is.in Mode 1 and returning to full power operations.
i I
i 2941u e
4 4
,-- m -
= e- - - - - - , v er--.- , - - , --r, , :-..v~-
- 27. _ .
~ ~
s.1 REFUELING INFORMATION' DOCKET NO. 50-362 UNIT SONGS - 3
- DATE January 15, 1985 COMPLETED BY-L. I. Mayweas.rer
. TELEPHONE (714) 492-7700 Ext. 56264
- 1. Scheduled date for next refueling shutdown.
Not yet determined. .,
- 2. Scheduled date for restart following refueling.
Not yet determined. l
- 3. Will refueling or. resumption of operation thereafter require a-Technical Specification change or other license amendment?
-Not yet' determined.
What will these be?
~Not yet determined.
4; Scheduled date for submitting proposed licensing action and supporting information. ;
Not yet determined.
- 5. Important Licensing considerations associated with refueling, e.g. new or different fuel design or supplier, unreviewed design'or performance analysis methods, significant changes in fuel design, new operating procedures.
Not yet determined.
- 6. The number of fuel assemblies.
a) In the core. 217-
'o) In the_ spent fuel storage pool. 0
- 7. Licensed spent-fuel storage capacity. 800 <
Intended ~ change in spent fuel' storage capacity. NA
- 8. Projected date of last refueling'that can be discharged to spent fuel-storage pool assuming present capacity.
'NA 2941u
~ + s,,., -
,o 3 .
si.
Soutt:ctn California Edison Company gE S AN ONOFRE NUCLE AR GENER ATING ST ATION P.O. BOX 12 8 SAN CLEMENTE, C ALIFORNI A 92672 J. G, H AYN ES TcLEPHONE svariON AN AGea - January 15, 1985 in.> . 2 no.
Director Office of' Management Information and Program Analysis.
U. S. Nuclear Regulatory Commission-Washington,' D.C. .
20555
Dear Sir:
Subject:
-Docket Nos. 50-361/50-362 Monthly Operating Reports for December 1984 San Onofre Nuclear Generating Station,. Units 2 and 3 Enclosed are'the Monthly Operating Reports as required by Section 6.9.1.10 of Appendix A, Technical Specifications to Facility Operating Licenses NPF-10_and NPF-15 for San Onofre Nuclear Generating Station, Units 2 and 3, respectively.
Please contact us if we can be of.further assistance.
Sincerely,
/ ! .
j 1 , 36N Enclosures cc: J. B. Martin (Regional Administrator, USNRC-Region V)
F. R. Huey (USNRC Senior Resident Inspector, Units 1,-2 and 3)
~J. P. Stewart (USNRC Resident Inspector, Units 2 and 3)
M N
u